Monumental Energy Corp. · TSXV:MNRG

Monumental Energy — Investor Presentation (October 2026)

17 slides from Monumental Energy's investor presentation, October 2026

  1. Slide 1: New Energy. New Zealand

    OCTOBER 2026 New Energy. New Zealand T S X-V: M N R G | F S E : Z A 6 | OTC Q B : M N M R F

  2. Slide 2: Forward Looking Statements

    About Project Investment Summary Contact us This presentation contains certain forward-looking statements and forward-looking information fluctuation in exchange rates; the impact of viruses and diseases on the Company’s ability to (collectively referred to herein as “forward looking statements”) wi

  3. Slide 3: Directors & Management Team

    About Project Investment Summary Contact us Directors & Management Team Maximilian Sali Ryan Cheung Bill Treuren Chris Mackay Michelle DeCecco CEO, Director & Founder CFO & Director Lead Technical Director Director Director

  4. Slide 4: The New Zealand Oil Royalty Play

    The New Zealand Oil Royalty Play The Waihapa production station IN PARTNERSHIP WITH NEW ZEALAND ENERGY CORP. (TSXV: NZ) o 12.5% to 25% Royalty Agreement on multiple wells within the Taranaki basin. o 75% payback first on well costs o Currently 5 wells are in production. o Funding & royalty agreement

  5. Slide 5: Current Project Pipeline

    Current and Near-Term Revenue Generating Projects Current Project Pipeline Low Hanging Fruit Production and stimulation plans Scalable Growth Multiple wells online in 2026 with low-cost, high- Six additional workovers to come online by Q4 return workovers using perforation guns along with new applic

  6. Slide 6: The Copper Moki 1 & 2 Oil Wells

    About Project Investment Summary Contact us N E W Z E A L A N D O I L R O Y A LT Y The Copper Moki 1 & 2 Oil Wells o Assets with maintained infrastructure o 3 KM gas line tied into the Waihapa Production facility o Over 1M barrels produced at Copper Moki over the lifetime of the wells to date o Sept

  7. Slide 7: The Maata Oil Field

    About Project Investment Summary Contact us The Maata Oil Field New opportunity sitting between two production facilities

  8. Slide 8: The Maata Oil Field

    About Project Investment Summary Contact us The Maata Oil Field New opportunity sitting between two production facilities • The Maata Prospect in Petroleum Exploration Permit PEP 60742 is mapped as the largest Mount Messenger sandstone target yet identified in a proven productive oil play in the ons

  9. Slide 9: Extended Exploration & Production Strategy

    About Project Investment Summary Contact us Extended Exploration & Near-Term: Production Strategy (Low Risk – Onshore) Beaconsfield (PPL 38141) o Extend Ngaere permit to shallow prospects at proven production levels. Tie-in to Waihapa facilities. Near-term STRATEGIC GOAL: gas/oil production, 9-figur

  10. Slide 10: Tirua Point Accepted Application – Gas play

    Tirua Point Accepted Application – Gas play o Application has been accepted over the application prospect is located onshore and offshore in the Northern Taranaki o It is a Mangahewa Formation Sandstone play with a resource potential of 200 BCF & 12MMBO (recoverable) ~2000m o Deeper Taniwha Fm Creta

  11. Slide 11: Mauku-1 Target

    About Project Investment Summary Contact us Mauku-1 Target o Exceptional reservoir thickness and pressure in the basin’s primary shallow 1500m gas play o Strong overpressure supports deliverability and recoverable volumes o Reservoir quality supports modern completion designs o Consistent overpressu

  12. Slide 12: Proprietary Chemical

    About Project Investment Summary Contact us Proprietary Chemical Organic Crude Oil Stimulant & Stabilizer – Crystal Engineering o Copper Moki field test scheduled for late Nov/ early Dec o Lab test in San Antonio Texas showed remarkable results on oil samples received from Copper Moki wells – expect

  13. Slide 13: Investment Opportunity

    About Project Investment Summary Contact us Investment Opportunity ü Monumental Energy currently owns 1M free trading shares at a cost base of .46 cents ü Previous gas production of 50 Billion Square Cubic Feet (BSCF) with the potential to add between 17-20 BSCF (100% basis) with the Tariki-A5 well

  14. Slide 14: Production in New Zealand: The Infrastructure

    About Project Investment Summary Contact us NEW ZEALAND OIL & GAS The Infrastructure Near Term Gas The Waihapa Production Station and associated infrastructure includes (NZEC 50% Production in interest): New Zealand o 45 mmcf/d gas processing, gas compression and LPG extraction facility (“TAWN facil

  15. Slide 15: Government Announces Funding & Partnerships

    About Project Investment Summary Contact us Government Announces Funding & Partnerships May 2025 The newly elected governments resources Minister, Shane Jones, announced funds of $200 million for Crown co-investment in new domestic gas field developments in the 2025 budget. The new initiative could

  16. Slide 16: Share Structure

    About Project Investment Summary Contact us Share Structure 112,638,290 Significant Insider Holdings Issued & Outstanding 4,530,000 | Maximilian Sali 67,115,077 CUSIP 61534M108 Warrants @ .08, .15, .175, .25, .30 ISIN CA61534M1086 10,075,000 Transfer agent Stock Options @ .05, .10, .13 Computershare

  17. Slide 17: Contact Us

    T S X-V: M N R G | F S E : B E 5 | OTC Q B : M N M R F Contact Us Maximilian Sali, Chief Executive Officer, Director and Founder [email protected] 604-367-8117 Vancouver Office New Plymouth Office, NZ #228- 1122 Mainland #11 Young St. New Plymouth Central, Vancouver, BC Canada V6Z 2E6 New Plymou

Monumental Energy — Investor Presentation (October 2026) on 6ix