Catalyst Metals Limited · ASX:CYL
Catalyst Metals — Investor Presentation (June 2016)
35 slides from Catalyst Metals's investor presentation, Jun 14, 2016
Slide 1: Corporate Presentation
Corporate Presentation Sydney 14 June 2016 Bruce Kay Technical Director
Slide 2: Competent Person's Statement
Competent Persons Statement Competent Person’s Statement The information in this report that relates to exploration results is based on information compiled by Mr Bruce Kay, a Competent Person, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Kay is a non-executive director
Slide 3: Company Objectives
Company Objectives Develop assets with strong upside potential Enhance value via professional exploration Make a major gold discovery Become dominant in a world class gold province “Dominate the Region” Slide 3
Slide 4: Catalyst Capital Structure
Catalyst Capital Structure Capital Structure (ASX: CYL, CYLO) 54,729,004 fully paid ordinary shares – 350,000 unlisted Performance Rights 2,623,184 listed options @ 50c (30 June 2018) Top 20 control approximately 70% of issued capital Cash in hand A$1.0 million (at 31 March 2016) Capital r
Slide 5: Corporate Structure: Non-Executive Directors
Corporate Structure Non-Executive Directors Bruce Kay – Former Head of Worldwide Exploration for Normandy Mining and Newmont Stephen Boston – Former Stockbroker and current Principal of Perth based private investment group Robin Scrimgeour – Former banker in London, Tokyo, Hong Kong and Singap
Slide 6: Victorian Gold
Victorian Gold Bendigo Australia’s 2nd largest goldfield (22 moz) Whitelaw Fault controls gold mineralisation Mines Dept predicts 32 moz covered by Murray Basin Sediments Slide 6
Slide 7: Whitelaw Fault Interpretation (Seismic)
Whitelaw Fault Interpretation (Seismic) Slide 7
Slide 8: Bendigo: Historic Gold Production
Bendigo: Historic Gold Production Historical gold production 22 million ounces: Estimated 30,000 to 50,000 ounces per vertical metre Every 100 metres contained 3-5 million ounces Largest gold producer in world from 1850 to 1890 Approximately 12 million ounces in first 24 years Slide 8
Slide 9: Bendigo: A World Class Gold Field
Bendigo: A World Class Gold Field Bendigo Goldfield Historical Gold Production from Lines of Lodes 18 moz of reef gold 4 moz of alluvial gold Est 7 mozs gold in top 200m Gold mineralisation footprint dwarfs the Kalgoorlie Super Pit Slide 9
Slide 10: Finding the Next Bendigo
Finding the Next Bendigo Recognising this major geological opportunity Manage the entire Whitelaw Gold Corridor Using world-class exploration techniques Strong JV partner GEV (sub of Hancock Prospecting PL) High grade gold at Four Eagles and Tandarra Excellent infrastructure and gold pla
Slide 11: Control of Entire Whitelaw Gold Corridor
Control of Entire Whitelaw Gold Corridor Bendigo produced 22 million ounces of gold at 15g/t Au Gold corridor continues north of Bendigo Totally concealed by younger sediments Whitelaw Fault controls gold If there is a gold deposit north of Bendigo, Catalyst will be major recipient! Slide 11
Slide 12: Gold beneath the wheat fields
Gold beneath the wheat fields 10.0m @ 17.9g/t Au (ACT015) 6.0m @ 82.7g/t Au (FE328) 3.0m @ 154g/t Au (FE732) 3.0m @ 36.6g/t Au (FE415) 3.0m @ 59.2g/t Au (FE633) 3.0m @ 20.5g/t Au (FE592) 6.0m @ 16.3g/t Au (FE696) Slide 12
Slide 13: 'Lifting the Cover' 2011-2016
‘Lifting the Cover’ 2011-2016 Control of entire Whitelaw Gold Corridor Gravity and Seismic reveal basement structures Pathfinder geochemistry defines gold trends Air Core drilling at Four Eagles and Tandarra GEV clout enables major drilling programme “Potential for both shallow open pit an
Slide 14: 'Lifting the Cover' 2011-2016
‘Lifting the Cover’ 2011-2016 Ownership and farm-ins over 1,066km2 Catalyst 100% tenements 340km2 Tandarra (CYL earning 51%) 59km2 Four Eagles JV – CYL 50% carried 641km2 Four Eagles Gold Project well developed Tandarra advanced project “Geophysics and drilling results so far very encour
Slide 15: Catalyst GEV Earn-in
Catalyst GEV Designated Cooperation Area Catalyst GEV Earn-in Large designated area with GEV established Catalyst manages programme and maintains 50% equity GEV spends $4.2 million to earn 50% from Providence Excellent infrastructure: Six gold plants in district Slide 15
Slide 16: Four Eagles Gold Project JV 2011
Four Eagles Gold Project JV 2011 Initial Catalyst Providence JV Signed January 2011 $2.1 m to earn 50% Totally concealed by Cover 3 gold intersections > 1g/t Au Slide 16
Slide 17: Four Eagles Gold Project JV 2016
Four Eagles Gold Project JV 2016 Catalyst GEV Providence JV Four Gold trends defined Advanced projects defined Hayanmi now 2.9 kms long 67 gold intersections > 1g/t Au Slide 17
Slide 18: Four Eagles Gold Project: Summary
Four Eagles Gold Project: Summary Large areas of gold potential in shallow basement Three prospects defined with high grades – Hayanmi – high grade gold over 2kms – Boyd’s Dam – gold over 0.8 km – Boyd North – gold over 0.7 km Discovery Trend still untested 40 kilometres of Whitelaw trend stil
Slide 19: 2016 Drilling Programme
2016 Drilling Programme Slide 19
Slide 20: Hayanmi Trend
Hayanmi Trend T T 244,000mE e000 245,000mE IE Seno YO Eagle 3 Zone 15@ Eagle 2 Zone }— 5,991,000mN . @\e Hayanmi 683 Prospect 2-399 e North Boundary Road o-e--9-..2. eens 592 Eagle 2 032 [- 5:990,000mN, Zone “ ° 608 a @) NortH 034 Boyd's C) 500 Dam ——$—— metres Prospect « on n LEGEND Drillhole grade
Slide 21: Hayanmi Longitudinal Projection
Hayanmi Longitudinal Projection Slide 21
Slide 22: Hayanmi vs New Chum Bendigo
Hayanmi vs New Chum Bendigo Slide 22
Slide 23: Boyd's Trend
Boyd's Trend New Zone at Boyd North; basement 20-40m Potential extension to south based on gravity interpretation Slide 23
Slide 24: Boyd's Trend Long Projection
Boyd's Trend Long Projection Slide 24
Slide 25: Lifting the Cover Gravity Survey
Lifting the Cover Gravity Survey First Vertical derivative shows known gold channels Other potential gold zones targeted (yellow lines) Eight (8) Targets defined for drilling Basement depth estimates of 40 to 80 metres Slide 25
Slide 26: 2nd Project Tandarra - Summary
2nd Project Tandarra - Summary Large areas of potential in basement (< 60m) High grade gold at less than 20m depth 10 to 20km strike length of untested structure Open pit potential at Tomorrow Prospect Angled RC and/or Diamond Drilling required Slide 26
Slide 27: 2016 Tandarra Drilling Plan
2016 Tandarra Drilling Plan Follow-up Aircore reconnaissance drilling: – Tandarra North – Dingee Infill RC Blade drilling: – Tomorrow zone Large areas of strike length still untested Slide 27
Slide 28: Tomorrow Zone Aircore RC/DD
246,000mE 247,000mE Tomorrow Zone Aircore RC/DD 5,974,000mN R084 Tomorrow Prospect Significant Aircore Intersections R019 TAC136 6.0m @ 2.95g/t Au from 75m ACT151 1.5m @ 59.2g/t Au from 69m and 2.0m @ 5.12g/t Au from 70.5m R021 TAC146 1.0m @ 9.96g/t Au from 42m R016 R058 ACT015 10m @ 17.88g/t Au fro
Slide 29: Tandarra (Tomorrow) Long Projection
Tandarra (Tomorrow) Long Projection Slide 29
Slide 30: Tandarra Cross Section 26.9m gold zone
Tandarra Cross Section 26.9m gold zone Slide 30
Slide 31: Four Eagles Fine and Coarse Gold
Four Eagles Fine and Coarse Gold Process from Discovery (FE328), Hayanmi (FE471) and Boyd’s Dam (FE415) Slide 31
Slide 32: LeachWELL Correlation Graph
LeachWELL Correlation Graph Correlation 2kg LeachWELL vs 30gm Aqua Regia/AAS 40 ±2kg sample by LeachWELL (g/t Au) Hole Type Diamond hole 30 Aircore hole INSET ±2kg sample by LeachWELL (g/t Au) 5 ne 20 Li on si es gr Re 10 0 0 5 See 30 gram sample by AAS (g/t Au) Inset 10 20 30 40 50 30 gram sample b
Slide 33: News Flow June - July 2016
News Flow June - July 2016 Tandarra Tomorrow RC Drilling – 3,447 assays in progress (50% complete) – 240 bulk leaches in progress Four Eagles Hayanmi RC drilling – Approximately 2,200 samples to be assayed – 107 bulk leaches in progress Reconnaissance Tandarra and Raydarra East (160 samples fo
Slide 34: Disclaimer & Forward Looking Statements
Disclaimer & Forward Looking Statements This presentation has been prepared by Catalyst Metals Limited (“Catalyst”). This document contains background information about Catalyst current at the date of this presentation. The presentation is in summary form and does not purport to be all inclusive o
Slide 35: Corporate Presentation
Corporate Presentation Sydney 14 June 2016 Bruce Kay Technical Director