Amber Grid Ab · OMXVSE:AMG1L

Amber Grid Ab — Investor Presentation (April 2018)

37 slides from Amber Grid Ab's investor presentation, April 2018

  1. Slide 1: Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL)

    Draft of conditions Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL) April 2018

  2. Slide 2: Table of contents

    Draft of conditions Table of contents 1. Procured works 2. Procurement procedure 3. Requests to participate 4. Qualification requirements 5. Right to perform works in Lithuania 6. Initial tenders 7. Negotiations 8. Final tenders 9. Tender evaluation criteria 10. Award of the contract

  3. Slide 3: Interconnection Poland-Lithuania (GIPL)

    Interconnection Poland-Lithuania (GIPL) Draft of conditions e Ryga Kieménai LATVIA Klaipeda LNG terminal RUSSIA tal POLAND / BELARUS \ Warszawa N e Hotoncye Ambe Grid

  4. Slide 4: Projected Gas Pipeline Route

    Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL) Draft of conditions Projected Gas Pipeline Route Projected length of the route is about 165 km and the diameter is DN700. According to the engineering design, the projected gas pipeline will run

  5. Slide 5: Description of the prospective Gas Transmission Pipeline

    Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL) Draft of conditions Description of the prospective Gas Transmission Pipeline 1) MAOP between Jauniūnai DKS and DASRS is 5.4 Mpa; 2) MAOP between DASRS and the state (LT/PL) border is 8.4 MPa; 3)

  6. Slide 6: Interconnections between the Gas Pipeline and Utility Lines

    Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL) Draft of conditions Interconnections between the Gas Pipeline and Utility Lines The projected gas pipeline will have 9 intersections with the existing gas pipelines, 3 intersections with pressur

  7. Slide 7: Interconnections between the Gas Pipeline and Water Bodies

    Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL) Draft of conditions Interconnections between the Gas Pipeline and Water Bodies The projected gas transmission pipeline will cross two major rivers: - The Neris River as one thread (about 500 m);

  8. Slide 8: The Neris River

    Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL) Draft of conditions Interconnections between the Gas Pipeline and Water Bodies The Neris River 8

  9. Slide 9: The Nemunas River

    Construction of Gas Interconnection Poland–Lithuania in the Territory of the Republic of Lithuania (GIPL) Draft of conditions Interconnections between the prospective Gas Transmission Pipeline and Water Bodies The Nemunas River 9

  10. Slide 10: Stages of Construction

    No 1, STAGES OF CONSTRUCTION Jauniūnai DKS Draft of conditions Stage I No 6 Stage II No 10 Stage III No 13 Stage IV DASRS 10

  11. Slide 11: Construction Stages

    CONSTRUCTION STAGES Draft of conditions Stage I: line block valve sites No 1/Jauniūnai DKS÷6 73 km - 30 September 2020 but not earlier than by 1 March 2020. Stage II: valve sites No 6÷10 30 km - 31 December 2020 but not earlier than by 1 June 2020. Stage III: valve sites No 10÷13 26 km - 30 June 202

  12. Slide 12: Works to be procured: Scope of Works (I)

    Works to be procured Scope of Works (I) Draft of conditions • AB „Amber Grid“ will provide with the following supplies of coated steel pipes required for the performance of Works: External diameter (mm) Wall thickness (mm) Steel Quantity (m) • supplier 711 (HDD sections) 12.5 L415 ME 3000 711 8.0 L4

  13. Slide 13: Works to be procured (2)

    Works to be procured (2) Draft of conditions The components of the price for the object of procurement – construction works for the part of gas interconnection Poland-Lithuania in the territory of the Republic of Lithuania – are as follows: The components of the price for the object of procurement.d

  14. Slide 14: Procurement procedure

    Procurement procedure Negotiated procedure with prior contract notice Draft of conditions Requests Initial Negotiat Final Confirmat tenders ions tenders ion Award of contract submission – approx. submissio Submission To be concluded: 60 days n – 30 – approx. 7 Actual - Upon expiry of the days days d

  15. Slide 15: Requests for participation in the Tender

    Requests for participation in the Tender Preliminary requirements Draft of conditions • In order to be invited to submit an initial tender the supplier shall submit request to participate in the tender and : o A filled out and signed European Single Procurement Document (ESPD) filled by all consorti

  16. Slide 16: ESPD

    ESPD Coverage and provision of documents Draft of conditions • European Single Procurement Document (ESPD) is a self-declaration of the businesses' financial status, abilities and eligibility for a public procurement procedure. • By submitting ESPD, the contractor will self declare the compliance to

  17. Slide 17: Exclusion grounds

    Exclusion grounds Draft of conditions • Judgement or criminal conviction in the course of past 5 years for the specified activities • Judgement or conviction in the course of past 5 years for failure to pay taxes, including social insurance contributions or the supplier fails to pay taxes, including

  18. Slide 18: Exclusion grounds (2)

    Exclussion grounds (2) Draft of conditions • Supplier has consealed information or provided false information on compliance or has failed to provide documentary evidence during this procedure or has been excluded during previous procedures • Unlawfull actions taken to influence the contracting entit

  19. Slide 19: Qualification requirements

    Qualification requirements General Qualification Requirements Draft of conditions 1. Certified licence to be a contractor for the construction of a structure of exceptional significance and carry out construction works (installation) of transmission gas pipelines 2. The supplier shall have the right

  20. Slide 20: Qualification requirements (2)

    Qualification requirements (2) Requirements for economic and financial state Draft of conditions 1. Average annual turnover from all activites during last 3 financial years is at least EUR 30 000 000 2. Current liquidity ratio for the last financial year (ratio of current assets and short term liabi

  21. Slide 21: Qualification requirements (3)

    Qualification requirements (3) Technical and professional capacity requirements Draft of conditions During the last 5 years the supplier shall have properly performed at least: 1. 1 but not more than 3 contracts with total value of at least EUR 15 million under which at least 1 main gas pipeline was

  22. Slide 22: Qualification requirements (4)

    Qualification requirements (4) Technical and professional capacity requirements (II) Draft of conditions Shall have and propose at least the following specialists: 1. 1 construction manager of a structure of exceptional significance, qualified in the area of construction of main gas pipelines and eq

  23. Slide 23: Qualification requirements (5)

    Qualification requirements (5) Technical and professional capacity requirements (III) Draft of conditions Shall have and propose at least the following specialists: 4. 1 design manager, qualified in the area of design of transmission gas pipelines and their installations (structures: engineering net

  24. Slide 24: Qualification requirements (6)

    Qualification requirements (6) Technical and professional capacity requirements (IV) Draft of conditions Shall have and propose at least the following specialists: 6. 1 manager of a part of the engineering design, qualified in the area of the design of transmission gas pipelines and their installati

  25. Slide 25: Qualification requirements (7)

    Qualification requirements (7) Technical and professional capacity requirements (V) Draft of conditions Shall have and propose at least the following specialists: 7. 2 qualified work superintendents, who have the right to manage the work of the construction of natural gas transmission system pipelin

  26. Slide 26: Right to perform works in Lithuania

    Right to perform works in Lithuania Draft of conditions Right for foreign suppliers to perform construction and engineering design works in Lithuania Suppliers from the EU States and Switzerland shall obtain documents proving the right to perform construction or design works in Lithuania (i) by impl

  27. Slide 27: Right to perform works in Lithuania (2)

    Right to perform works in Lithuania (2) Right of foreign specialists to perform construction and design works in Lithuania (II) Draft of conditions In order to recognise their rights to perform respective construction or design works the Contractor (legal person) has to submit: 1. A written applicat

  28. Slide 28: Rights to perform works in Lithuania (3)

    Rights to perform works in Lithuania (3) Rights of foreign specialists to perform construction and design works in Lithuania (III) Draft of conditions In order to recognise their rights to perform construction or design works the Contractor‘s specialists will have to: 1. Submit a written application

  29. Slide 29: Right to perform works in Lithuania (4)

    Right to perform works in Lithuania (4) Right to carry out works for the testing of the transmission gas pipeline and near an operating transmission gas pipeline Draft of conditions In order to obtain right to to carry out works for the testing and rapairing of the transmission gas pipeline the Cont

  30. Slide 30: Right to perform works in Lithuania (5)

    Right to perform works in Lithuania (5) Right to carry out works for the testing of the transmission gas pipeline and near an operating transmission gas pipeline (II) Draft of conditions In order to perform works near an operating transmission gas pipeline, the specialists must obtain certificates o

  31. Slide 31: Initial tenders

    Initial tenders Intended requirements Draft of conditions • Only the suppliers who submitted compliant requests and meet the qualification requirements, shall be invited to submit initial tenders • Tender security of EUR 1 million shall be provided together with the initial tender

  32. Slide 32: Negotiations

    Negotiations Tentative requirements list Draft of conditions • The suppliers, who have submitted initial requests in compliance with the requirements, shall be invited to the negotiations • AB “Amber Grid” will be entitled to negotiate any terms of procurement save for: − compliance of the works, ma

  33. Slide 33: Final proposals

    Final proposals Intended requirements Draft of conditions • Upon completion of the negotiations, the suppliers which have not been dismissed shall be invited to submit their final tenders • The terms and conditions of the final tender shall not be worse than those fixed in the initial tender and min

  34. Slide 34: Proposal evaluation criteria

    Proposal evaluation criteria Draft of conditions Evaluation criteria for the most economically advantageous tender Criterion Weight Price 84 Efficiency of the project management plan 15 Salary for contract staff 1 The plan shall cover the following matters (generalized): − team of the proposed speci

  35. Slide 35: Award of the procurement contract

    Award of the procurement contract Intended requirements (II) Draft of conditions • Procurement contract shall be awarded to the supplier whose final proposal has the best price-quality ratio • Procurement contract shall be awarded : − Upon expiry of the postponement term − Upon receipt of the approv

  36. Slide 36: Implementation of the GIPL project in the territory of Lithuania

    Implementation of the GIPL project in the territory of Lithuania Draft of conditions Scheduled Task Name Start Finish Duration Implementation of the GIPL project in the territory of Lithuania Mon 17.05.08 Fri 21.12.31 1215 days? Publication of a Public Tender Notice for the procurement of Works Tue

  37. Slide 37: AB Amber Grid contact details

    AB “Amber Grid” Savanorių pr. 28, LT - 03116, Vilnius Tel. (8 5) 000 0000 www.ambergrid.lt

Amber Grid — Investor Presentation (April 2018) on 6ix