  1. Slide 1: Silverton Wind Farm Community Consultative Committee

    Silverton Wind Farm Community Consultative Committee Meeting No.CCC-021 Presented by AGL Energy Limited Date Thursday, 30 March 2017

  2. Slide 2: Agenda

    Community Consultative Committee | 2 Agenda 1 Welcome 5 Topics of interest • Visual impact assessment • Mobile reception program 2 Previous minutes 6 Other business Project update 3 • Overview • Wind Farm Works 7 Next meeting • Connection Works 4 Community relations update Silverton Wind Farm – 30 M

  3. Slide 3: 2. Previous minutes

    Community Consultative Committee | 3 2. Previous minutes Action items Item Action Status Who AGL invited community representatives to be involved in 4.20.03 Open KL – 4/17 developing a draft plan for the Silverton Community Fund. AGL to advertise further details on the industry briefing 4.20.07 Clos

  4. Slide 4: Silverton Wind Farm

    Community Consultative Committee | 4 3. Project update Silverton Wind Farm Silverton Wind Farm › Located in the Barrier Ranges approximately 5km north of the Silverton township. › Generation capacity of 200 MW › Wind turbines: 58 x GE 3.43-130 › Annual Energy Production (AEP) » ~780,000 MWh  Capaci

  5. Slide 5: Scope of Works

    Community Consultative Committee | 5 3. Project update Silverton Wind Farm Scope of Works › The Silverton Wind Farm consists of two main scopes of work: » Wind Farm Works (GE-CATCON) » Connection Works (TransGrid) › AGL has prepared an Overview Environmental Management Strategy (OEMS) in accordance

  6. Slide 6: Silverton Wind Farm - GE-CATCON wind farm works

    Community Consultative Committee | 6 3. Project update Silverton Wind Farm Wind Farm Works › GE-CATCON (joint venture) has been engaged to deliver the wind farm works » Engineer, Procure and Construct (EPC) Contract › Scope of works, includes: » 58 x GE 3.43-130 wind turbines » 33kV electrical retic

  7. Slide 7: Connection Works

    Community Consultative Committee | 7 3. Project update Silverton Wind Farm Connection Works › TransGrid (Network Services Provider) has been engaged to deliver the connection works for the wind farm » Project Agreement (construction) › Scope of works, includes: » Wind farm 220kV substation » ~25km o

  8. Slide 8: Industry Briefing

    Community Consultative Committee | 8 3. Project update Silverton Wind Farm Industry Briefing › AGL together with GE-CATCON conducted an industry briefing on Tuesday, 31 January 2017 at Silverton and Broken Hill » Both sessions were well attended by local industry and people interested in employment

  9. Slide 9: Pre-construction minor works

    Community Consultative Committee | 9 3. Project update Wind Farm Works Pre-construction minor works › GE-CATCON is planning to mobilise early next week to commence the pre-construction minor works › The project approval defines the pre-construction minor works: » investigative drilling, excavation o

  10. Slide 10: Wind Farm Environmental Management Strategy

    Community Consultative Committee | 10 3. Project update Wind Farm Works Wind Farm Environmental Management Strategy › GE-CATCON has developed in accordance with condition 1 (schedule 4) of the project approval, including: » Biodiversity Management Plan » Heritage Management Plan » Traffic Management

  11. Slide 11: Road Upgrade and Maintenance Strategy

    Community Consultative Committee | 11 3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy › GE-CATCON has developed in accordance with condition 24 (schedule 3) of the project approval: » Silverton Road upgrade » Silverton Road / Daydream Mine Road intersection » Daydream Mine Ro

  12. Slide 12: Road Upgrade: Silverton Rd / Daydream Mine Road intersection

    Community Consultative Committee | 12 3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy › Silverton Rd / Daydream Mine Road intersection Silverton Wind Farm – 30 March 2017

  13. Slide 13: Road Upgrade: Daydream Mine Road / Site Access intersection

    Community Consultative Committee | 13 3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy › Daydream Mine Road / Site Access intersection Silverton Wind Farm – 30 March 2017

  14. Slide 14: Short bypass (Barrier Hwy intersection) – Option B

    Community Consultative Committee | 14 3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy › Short bypass (Barrier Hwy intersection) – Option B Silverton Wind Farm – 30 March 2017

  15. Slide 15: Short bypass (Silverton Road intersection)

    Community Consultative Committee | 15 3. Project update Wind Farm Works Road Upgrade and Maintenance Strategy › Short bypass (Silverton Road intersection) Silverton Wind Farm – 30 March 2017

  16. Slide 16: Traffic Management Plan (TMP)

    Community Consultative Committee | 16 3. Project update Wind Farm Works Traffic Management Plan (TMP) › GE-CATCON has developed in accordance with condition 27 (schedule 3) of the project approval. › TMP includes a route assessment study from Port Adelaide to site › Issued to the Roads and Maritime

  17. Slide 17: Traffic Management Plan: heavy vehicle routes

    Community Consultative Committee | 17 3. Project update Wind Farm Works Traffic Management Plan (TMP) › Heavy and over dimensional vehicle routes » Appendix 7 of the project approval › Site access is off Daydream Mine Road. › Primary access is via the site access (shown in green) › Construction will

  18. Slide 18: Traffic Management Plan: heavy vehicle routes

    Community Consultative Committee | 18 3. Project update Wind Farm Works Traffic Management Plan (TMP) › Heavy and over dimensional vehicle routes » Appendix 7 of the project approval › Site access is off Daydream Mine Road. › Primary access is via the site access (shown in green) › Construction will

  19. Slide 19: Type wind turbine – GE 3.43-130

    Community Consultative Committee | 19 3. Project update Wind Farm Works Type wind turbine – GE 3.43-130 › Type Wind Turbine is installed in Wieringermeer, Holland (shown in photo). › Nameplate of 3.43 MW with a 130m rotor and hub height of 110m › The 3MW platform machines are an evolution of the 2.5

  20. Slide 20: Wind turbine GE 3.43-130

    Community Consultative Committee | 20 3. Project update Wind Farm Works Wind turbine GE 3.43-130 › Inside the GE 3.43-130 wind turbine Silverton Wind Farm – 30 March 2017

  21. Slide 21: Connection Works: Existing 220kV Substation

    Community Consultative Committee | 21 3. Project update Connection Works Existing 220kV Substation › The Point of Connection (POC) for the Silverton Wind Farm will be in TransGrid’s existing 220kV substation in Broken Hill. › The scope of works includes: » Foundations for electrical equipment / bay

  22. Slide 22: Connection Works: 220kV Transmission Line

    Community Consultative Committee | 22 3. Project update Connection Works 220kV Transmission Line › The Silverton Wind Farm is connected to the National Electricity Market (NEM) via the ~25km of 220kV transmission line to the Point of Connection (POC). › The scope of works includes: » Single galvaniz

  23. Slide 23: Connection Works: 220kV Wind Farm Substation

    Community Consultative Committee | 23 3. Project update Connection Works 220kV Wind Farm Substation › The Silverton Wind Farm is transformed to the 220kV network voltage via the 220kV wind farm substation. › The scope of works includes: » Bunded foundation » 220/33kV power transformer » Control / au

  24. Slide 24: 220kV Wind Farm Substation preliminary design

    Community Consultative Committee | 24 3. Project update Connection Works 220kV Wind Farm Substation › Preliminary design coordination Silverton Wind Farm – 30 March 2017

  25. Slide 25: Community engagement

    Community Consultative Committee | 25 4. Community relations update Community engagement Silverton Information Centre › AGL will be utilising the old butchers shop in Silverton during the construction of the wind farm to provide project information and updates Community information AGL contact detai

  26. Slide 26: Construction planning

    Community Consultative Committee | 26 4. Community relations update Construction planning Signage › Project signboard will be erect at the site entry Construction notifications › Notification will be provided through different means depending on the type of works and scope of works » Phone calls » E

  27. Slide 27: Community Enhancement Commitments

    Community Consultative Committee | 27 4. Community relations update Community engagement Community Enhancement Commitments › Silverton Community Fund » $15,000 per year + CPI (life of project) › Solar Silverton Program » 5kW solar PV for leaseholder and residences within 10 km of project. » Initial

  28. Slide 28: Mobile Reception Program

    Community Consultative Committee | 28 4. Community relations update Community Enhancement Commitments Mobile Reception Program › AGL has commenced feasibility studies with Telstra based on existing upgrade existing infrastructure » Options for 3G and 4G coverage » 4G is significantly above the budge

  29. Slide 29: Visual impact assessment

    Community Consultative Committee | 29 5. Topics of interest Visual impact assessment Modification 3 › AGL is proposing to prepare photo montages of the planned Silverton Wind Farm showing the 58 wind turbines – similar to the photo shown below Silverton Wind Farm – 30 March 2017

  30. Slide 30: Visual impact assessment

    Community Consultative Committee | 30 5. Topics of interest Visual impact assessment Silverton Wind Farm › Preliminary feedback on locations is shown below: » Silverton township » Mundi Mundi lookout » Umberumberka House » Desert Sculpture (Living Desert)  Line of Load » North Silverton » Thackarin

  31. Slide 31: Silverton Creek proposed sand extraction

    Community Consultative Committee | 31 5. Topics of interest Silverton Creek Proposed sand extraction › Consolidated Mining and Civil (CMC) submitted their application to NSW Crown Lands in November 2017. › Sand extract is planned to commence shortly after receipt of the license – potentially April /

  32. Slide 32: Horses and wind farms

    Community Consultative Committee | 32 5. Topics of interest Horses and wind farms Delabole Wind Farm › Delabole Wind Farm is the UK’s first commercial wind farm, established in 1991. › A horse stud farm and riding centre has been operating at the Delabole Wind Farm since 1991 › Originally the wind f

  33. Slide 33: 6. Other business

    Community Consultative Committee | 33 6. Other business Silverton Wind Farm › AGL Viewing Platform Art and Design Competition (Broken Hill Solar Plant) › Questions from group and observers? Silverton Wind Farm – 30 March 2017

  34. Slide 34: 7. Next meeting

    Community Consultative Committee | 34 7. Next meeting Silverton Wind Farm Community Consultative Committee (CCC) › Next Meeting: » Date » Time » Location Silverton Wind Farm – 30 March 2017

  35. Slide 35: End Presentation

    End Presentation