Chaparral Energy Inc

Chaparral Energy — JP Morgan High Yield Conference 2010

33 slides from Chaparral Energy's conference presentation, Mar 1, 2010

  1. Slide 1: JP Morgan High Yield Conference

    Exhibit 99.1 JP Morgan High Yield Conference Miami, Florida March 2010

  2. Slide 2: Disclaimer - Forward Looking Statements

    Disclaimer - Forward Looking Statements This presentation contains forward-looking statements. These forward-looking statements relate to, among other things, our financial and operating performance and results, our business strategy, market prices, our future commodity price risk management activit

  3. Slide 3: Management Representatives

    Management Representatives Mark Fischer, Chief Executive Officer & President Joe Evans, Chief Financial Officer & Executive Vice President Diane Montgomery Director, Corporate Finance 33

  4. Slide 4: Company Overview

    Company Overview 44

  5. Slide 5: Chaparral Overview

    Chaparral Overview Founded in 1988, based in Oklahoma City Ownership Summary Core areas are Mid-Continent and Permian Basin Comprise 90% of reserves and 87% of 2009 production CHK Third largest oil producer in Oklahoma Holdings, L.L.C. Mark A. Substantial resource potential 31.9% Fischer 42.5% Long-

  6. Slide 6: Operating Areas

    Operating Areas As of December 31, 2009 (SEC) Company Total Core Area December 2009 proved reserves – 142 MMBoe 2009 average daily production – 21 MBoe/d Williston Growth Area Basin Acreage (gross / net): 1,248,929 / 620,557 Acreage Field Offices Powder River Headquarters Basin Rocky Mountains Great

  7. Slide 7: Strong Record of Reserve and Production Growth

    Strong Record of Reserve and Production Growth Chaparral’s reserve replacement ratio averaged 599% per year from 2002 to 2008 Year-End SEC Reserves (MMBoe) (1)(2) Annual Production (MMBoe) 2003 –2009 CAGR = 19% 2003 – 2009 CAGR = 20% 175 10 164 151 142 8.1 150 7.6 8 7.1 6.8 125 113 103 5.4 6 100 4.2

  8. Slide 8: Reserve Price Sensitivity

    Reserve Price Sensitivity December 31, 2009 Reserves (MMBoe) (1)(2) PV-10 Value ($Billions) (1)(2) 200 $3.0 150 158 161 $2.7 142 $2.0 $2.2 100 $1.3 $1.0 50 0 $- New SEC Pricing Old SEC Pricing Nymex Strip New SEC Old SEC Nymex Strip (3) (3) 1/14/2010 Pricing Pricing 1/14/2010 Note: 1) New SECpricing

  9. Slide 9: Operating and Financial Strategy

    Operating and Financial Strategy Increase reserves and production through drilling of large inventory of near- term, high potential drilling opportunities Expand EOR field operations and CO 2 infrastructure Selectively pursue strategic acquisition opportunities with significant upside potential Hedg

  10. Slide 10: Stable Base and Growth Potential

    Stable Base and Growth Potential Significant Near-Term Low-Risk Long-Term Stable Producing Base Growth Upside Long-lived reserve base 295 wells planned for 2010 180 MMbo potentially • 8.8% projected annual with expected net exit rate recoverable through EOR decline in PDP production production of 7.

  11. Slide 11: Strong Inventory of Drilling Locations

    Strong Inventory of Drilling Locations Chaparral has experienced a high historical drilling success rate of 99% on a weighted average basis during 2007, 2008 and 2009 1,333 Identified Proven Undeveloped Drilling Locations 3,485 Additional Potential Drilling Locations Ark-La-Tex North Rocky North Roc

  12. Slide 12: Capital Budget

    Capital Budget Oil & Gas Capital Expenditures ($MM) 2010E Drilling CAPEX by Major Plays ($MM) 2010 Component 2006 2007 2008 2009E Budget Cleveland Sand $30.8 Drilling 134 121 176 83 121 Granite Wash $19.1 Enhancements 31 44 55 34 11 Osage County $17.9 Acquisitions (1) 489 50 46 19 2 Tunstill $8.1 Te

  13. Slide 13: Cleveland Sand Play

    Cleveland Sand Play Ellis County Area Horizontal drilling Milton #3H-26 Recently Completed Gilson 2H-24, Chap Op with 100% WI 1.8 MMcf/d, 240 BOPD Tight sand play State A 6H-36, Chap Op with 100% WI 2.8 MMcf/d, 250 BOPD Depth: 7,900 – 9,700 feet Scheduled to drill 19 wells in 2010 10 operated, avgWI

  14. Slide 14: Granite Wash Play

    Granite Wash Play Stiles Ranch Area Current Producing Net Acreage: 12,634 Acres Colony Wash Area 14 14

  15. Slide 15: Granite Wash Play – Colony Wash Area

    Granite Wash Play – Colony Wash Area Roxanne –3-17H and 4-17H Questar Op, Chap 25% WI Gunter 2H-14 Drilling Chap Op & 70% WI IP: 6.5 MMcf/d, 500 BOPD Roxanne 1-17H Chap Op & 25% WI IP: 7.7 MMcf/d, 736 BOPD Kliewer #1-18H CHK Op, Chap: 18% WI IP: 11.6 MMcf/d, 700 BOPD Roxanne 2-17H Questar Op, Chap 2

  16. Slide 16: Granite Wash Play – Stiles Ranch Area

    Granite Wash Play – Stiles Ranch Area Play Statistics Gross reserves / well Brown “6” #2H WI 25% (MMBoe): 1.0 Proposed 17MMcfe/d Gross CapEx/ well ($MM): $7.38 Chaparral net acres: 855 Avg working interest: 51.2% Britt #7-12H Drilling WI 41% Britt 8-5H WI 12.5% Potential drill locations: 21 Brown Ar

  17. Slide 17: Osage And Creek Counties, OK

    Osage And Creek Counties, OK North Burbank Unit Formations: Burbank, Miss. Chat Producing depth: 3,000ft. South Burbank Unit 1 company rig currently running Scheduled to drill 45 Chaparral operated wells in 2010 SBU Area Burbank & Chat Play Statistics West Fairfax Chat Gross reserves / well (MMBoe):

  18. Slide 18: Tunstill Field Play

    Tunstill Field Play Formation Gross reserves / well (MMBoe): 0.1 Gross CapEx / well ($MM): $0.9 Chaparral net acres: 20,640 Total seismic sq.mi.: 10 Loving Co. Avg working interest: 100% BELL CANYON SAND Potential drill locations: 222 Location: Loving County, Texas Substantial Bone Springs potential

  19. Slide 19: Haley Play Area

    Haley Play Area Atoka Play Statistics Morrow Gross reserves / well (MMBoe): 1.9 Gross CapEx/ well ($MM): $10.2 Chaparral net acres: 2,605 Avg working interest: 74% 2010 Scheduled drill locations: (Chaparral operated) 1 ROI: (2010 Op Drilling) 3.91 ROR: (2010 Op Drilling) 100% Haley 36-4, Chap Op, 91

  20. Slide 20: Anadarko Basin - Woodford Shale

    Anadarko Basin - Woodford Shale Chaparral’s Acreage 21,600 (+/-) net acres held by Ellis production (HBP), 1,080 non-producing acres Dewey Potential drilling locations 787 (162 net) Blaine Kingfisher Play Economics(1) Roger Mills Custer 4.0 – 6.0 Bcfe gross per well with 4,000 foot lateral Canadian

  21. Slide 21: Enhanced Oil Recovery Opportunities

    The Oil is There - U.S. Oil - Enhanced Oil Recovery Opportunities Chaparral utilizes CO2 and polymer EOR techniques CO2 EOR involves injection of CO2 and water to enhance hydrocarbon mobility to drive hydrocarbons to wells Polymer EOR improves areal sweep efficiency and minimizes channeling 21 21

  22. Slide 22: North Burbank Unit – Polymer & CO2 Tertiary Recovery

    North Burbank Unit – Polymer & CO2 Tertiary Recovery WI - 99.25% (operated property) Size - 23,080 acres; Depth - 3,000’ Phillips’ Polymer Project OOIP – 824 MMBO Cum. Recovery - 317 MMBO (primary & secondary) Producing zone - Bartlesville Reservoir – 2 Tier Wells - 269 producing, 193 injection, 493

  23. Slide 23: Camrick Area CO2 Tertiary Recovery

    Camrick Area CO2 Tertiary Recovery Consists of three unitized fields Operated with an average working interest of Camrick Area, OK 54% Beaver & Texas Counties, OK CO2 injection has improved gross production in Lipscomb County, TX Camrick Area from 175 Bbls/day to 1,800 Bbls/day Expansion of CO2 inje

  24. Slide 24: Substantial Upside With CO2 Tertiary Recovery

    Substantial Upside With CO2 Tertiary Recovery CO2 Tertiary Recovery Projects Economics (5 Proved Reserves Projects)(1) CO2 project inventory $84.7 million investment 7 units with proved reserves $272.8 million net cash flow 65 units with 2P & 3P EOR $104.3 million PV-10 reserves 10 units with CO 2 i

  25. Slide 25: Currently Owned CO2 Development Potential

    Currently Owned CO2 Development Potential Total OOIP 3250 MMBO Primary Production 506 MMBO Existing CELLC CO Pipelines 2 Existing Third Party CO Pipelines Secondary Recovery 530 MMBO 2 Proposed CELLC CO Pipelines 2 Tertiary Potential 312 MMBO Owned Active CO fields 2 Owned Potential CO fields 2 Net

  26. Slide 26: CO2 Infrastructure & Resource Potential

    CO2 Infrastructure & Resource Potential Chaparral CO2 Pipelines Proposed Chaparral Pipelines Third Party Pipelines Cum. Recovered 1-3 MMBO Cum. Recovered 3-5 MMBO Cum. Recovered 5-10 MMBO Cum. Recovered 10+ MMBO 26 26

  27. Slide 27: EOR Potential

    EOR Potential U.S. Department of Energy – Office of Fossil Energy – Office of Oil and Natural Gas CO2 – EOR Technically Recoverable Resource Potential All Reservoirs (Ten Basins / Areas Assessed) (1) (2) No. Large Reservoirs OOIP ROIP Technically Recoverable Basin / Area Assessed (Billion Barrels) (

  28. Slide 28: Financial Overview

    Financial Overview 28 28

  29. Slide 29: Summary Financial Data

    Summary Financial Data 2007 2008 2009E Price Oil – Wellhead ($/Bbl) 69.85 96.23 57.37 Gas – Wellhead ($/Mcf) (1) 6.41 7.72 3.51 NGL – Wellhead ($/Bbl) --- 57.61 35.38 Production (MMBoe) 6.7 7.1 7.6 Oil (MMBbls) 3.3 3.4 3.4 Gas (Bcf) (1) 20.5 19.8 22.6 NGL (MMBbls) --- .4 .4 Revenue Including Cash Se

  30. Slide 30: Strong Historical Growth and Improving Cost Structure

    Strong Historical Growth and Improving Cost Structure Production (BOE) / Day LOE / BOE 30,000 Chart Title 20,926 22,200 $20.00 $17.05 18,558 19,323 $15.42 14,788 $15.00 $13.28 $12.33 $12.50 20,000 $10.00 10,000 $5.00 $0.00 0 2006 2007 2008 2009E 2010E 2006 2007 2008 2009E 2010E Production & Ad Valor

  31. Slide 31: Debt and Liquidity

    Debt and Liquidity 600 500 Current Maturity 507 400 Profile ($mm) 300 324 324 200 100 0 2010 2011 2012 2013 2014 2015 2016 2017 Net Secured Debt / EBITDA Liquidity 6 5.34x 150 120.9m 5 4 100 88.0m 73.0m 3 2.28x 55.4m 2.01x 2.04x 2 50 1 0 0 2006 2007 2008 2009E 2006 2007 2008 2009E 31 31

  32. Slide 32: Hedge Portfolio

    Hedge Portfolio % of Proved Developed Producing Hedged (As of February 24, 2010) Gas Basis Hedges 100% % Gas 90% Price PDP $168.55 (2) 80% $11.53 $110.00 Jan-Dec 2010 $0.79 74% $10.00 $152.71 70% $110.00 Jan-Dec 2011 $0.74 73% 60% 50% 2Q 2009 - monetized 2012 & 2013 contracts, net cash proceeds 40%

  33. Slide 33: 2010 Guidance

    2010 Guidance Oil and Gas CAPEX $174 million Production 8.0 - 8.2 MMBoe General and Administrative $3.30 – $3.50/Boe Lease Operating Expense $12.00 - $13.00/Boe 33 33

Chaparral Energy — JP Morgan High Yield Conference 2010 on 6ix