Slide 1: Coopers Gap Wind Farm Development Proposal CCC
Coopers Gap 1 Wind Farm Development Proposal Community Consultative Committee Thursday 25 August 2016
Slide 2: Agenda
2 1. Agenda 1. Welcome 2. Community Group Visit to AGL Victorian Wind Farms 3. Project status update 4. Business and industry information sessions 5. Wind farms and noise 6. Wind turbine shadow flicker 7. Wind turbines and fire management 8. Other business 9. Next meeting and close » Coopers Gap Win
Slide 3: Welcome
3 1. Welcome Confirmation of June 2016 minutes » Coopers Gap Wind Farm 25 August 2016
Slide 4: Review previous meeting actions
4 1. Review previous meeting actions Action item CCC Status Who Meetin g 1. AGL to send link to TOR process website link to those who June 2016 Closed HO request it 2. AGL to talk with J Scutt about noise testing equipment on his June 2016 Closed SG property 3. AGL to confirm properties for façade t
Slide 5: Review previous meeting actions
5 1. Review previous meeting actions Action item CCC Status Who Meetin g 7. AGL to confirm allowable limit for turbines above background June 2016 Open NC noise 8. Confirm who is attending the Victorian wind farm trip June 2016 Closed All 9. AGL to confirm if Dalby pick up and drop off suitable June
Slide 6: Community group visit to AGL Victorian Wind Farms
6 Community group visit to AGL Victorian Wind Farms • Helena Orel (AGL)
Slide 7: Feedback
7 2. Feedback › 38 people visited AGL’s Victorian wind farms – Macarthur Wind Farm and Oaklands Hill Wind Farm in early August › Thank you to all those who participated » Coopers Gap Wind Farm 25 August2016
Slide 8: Feedback
8 2. Feedback » Coopers Gap Wind Farm 25 August2016
Slide 9: » Coopers Gap Wind Farm 25 August 2016
9 » Coopers Gap Wind Farm 25 August 2016
Slide 10: Feedback
10 2. Feedback » Coopers Gap Wind Farm 25 August2016
Slide 11: Project status update
11 Project status update • Neil Cooke (AGL)
Slide 12: Where we are at now
12 3. Where we are at now Step Key dates: planning approval process Activity s 1 7rd June Coopers Gap Wind Farm declared a Coordinated Project of state economic and environmental significance 2 10 June – 11 July Submissions on Terms of Terms of Reference on public exhibition Reference used to develo
Slide 13: Project status
13 3. Project status › Electrical connection: 275 kV confirmed. Connection Application submitted. Response expected by end of Sept. › Tender documents uploaded to tender website for five selected tenderers use from Tuesday 23rd August › Tenderer site visits underway from mid September for three week
Slide 14: Project status
14 3. Project status › Environmental Impact Statement (EIS) on public exhibition for six weeks from mid September › EIS includes chapters on visual impacts, noise, traffic, flora & fauna, shadow flicker, etc. Coopers Gap Wind Farm CCC 25 August 2016
Slide 15: Project status
15 3. Project status › Environmental Impact Statement (EIS) on public exhibition for six weeks from mid September › On display at: › Western Downs libraries – Bell, Chinchilla, Dalby, Jandowae › South Burnett libraries – Blackbutt, Kingaroy, Nanango, Wondai, Proston, › Newspapers – Dalby Herald, Chi
Slide 16: Business and industry information sessions
16 Business and industry information sessions Stuart Galway (AGL)
Slide 17: Business and industry information sessions
17 4. Business and industry information sessions - One held with South Burnett Council and the Toowoomba Surat Basin Enterprise (TSBE) - Western Downs Chamber Commerce session planned - Dalby businesses / industry encouraged to get their capability statements prepared and sent into AGL - Any feedbac
Slide 18: Coopers Gap Façade Insulation Assessment
Coopers Gap Façade Insulation Assessment Rhys Brown AECOM Brisbane Acoustics Team 25 August 2016
Slide 19: Façade insulation assessment
19 5. Façade insulation assessment • AECOM was commissioned by AGL Energy to conduct a façade sound insulation assessment at five residences located at the Coopers Gap Wind Farm site in July 2016 • The residences were of different materials: • wood, tin, concrete, fibro, weatherboard • The QLD Code
Slide 20: Façade level testing
20 5. Façade level testing The following wall types were tested: • House A: Pre-fabricated (fibro) • House B: Metal Cladding • House C: Weatherboard • House D: Concrete • House E: Log cabin Typical materials used for construction of residences near Coopers Gap Wind Farm Tested windows closed, open 1
Slide 21: Façade level testing
21 5. Façade level testing » Coopers Gap Wind Farm CCC 25 August 2016
Slide 22: Façade level testing
22 5. Façade level testing » Coopers Gap Wind Farm CCC 25 August 2016
Slide 23: Façade level testing
23 5. Façade level testing » Coopers Gap CCC Wind Farm 25 August 2016
Slide 24: Façade sound insulation
24 5. Façade sound insulation Closed Window Partially Open Fully Open » Cooper Gap Wind Farm CCC 25 August 2016
Slide 25: Forecast internal levels
25 5. Forecast internal levels » Coopers Gap Wind Farm CCC 25 August 2016
Slide 26: Internal ambient noise
26 5. Internal ambient noise » Coopers Gap Wind Farm CCC 25 August 2016
Slide 27: Conclusion
27 5. Conclusion Found the sound insulation indices of five different façade constructions common to the area – estimated wind farm noise attenuation of 8-13 dB(A) for the tested spaces. Estimated internal wind farm noise levels based on modelled data. Internal wind noise expected to range between 1
Slide 28: Coopers Gap Noise and Vibration Impact Assessment
Coopers Gap Noise and Vibration Impact Assessment Rhys Brown AECOM Brisbane Acoustics Team 25 August 2016
Slide 29: QLD wind farm state code requirements
29 5. QLD wind farm state code requirements Noise levels at sensitive receptors: • PO11 and PO12 – these state the levels you should not exceed Construction noise: • PO13 – should minimise noise from construction. We recommend a Construction Environment Management Plan (CEMP) should be developed.
Slide 30: QLD Code noise limits
30 5. QLD Code noise limits Participating landowners LAeq of 45 dB(A) OR Whichever is 5 dB above background level greater Non-participating landowners LAeq of 35 dB(A) OR 5 dB above background level
Slide 31: Background noise assessment
31 5. Background noise assessment Monitored at 12 Locations (shown in dark blue) Page 31
Slide 32: Background noise assessment
32 5. Background noise assessment Background noise data collected at each site Correlated with wind speed data Further baseline measurements are currently being undertaken
Slide 33: Future noise level modelling
33 5. Future noise level modelling » Presentation Title October 24, 2026 Page 33
Slide 34: Shadow Flicker Assessment
Shadow Flicker Assessment Rhys Brown AECOM Brisbane Acoustics Team 25 August 2016
Slide 35: What is shadow flicker?
35 6. What is shadow flicker? The rotating blades of wind turbines may cast flickering shadows, depending on the position of the turbine, sun and receptor When the sun is low in the sky, the length of the shadows cast by the turbine increase, increasing the area around the turbine affected by shadow
Slide 36: Should we be concerned?
36 6. Should we be concerned? Some people can consider shadow flicker a nuisance Epileptic seizures can be triggered by light flashes in the range of 5 – 30 Hz Flickering created by turbines is in the range of 0.6 – 1 Hz » Coopers Gap Wind Farm CCC 25 August 2016
Slide 37: Queensland Wind Farm State Code
37 6. Queensland Wind Farm State Code PO4 Development avoids or minimises shadow flicker impacts on existing or approved sensitive land uses. AO4.1 Shadow flicker assessment The modelled blade shadow flicker impact on any existing or approved sensitive land use(s) does not exceed 30 hours per annum
Slide 38: Assessed properties
38 6. Assessed properties Impact of shadow flicker only significant up to a distance of around 10 rotor diameters Beyond this distance shadow is diffused Shadow flicker here analysed at properties within 1.5km of turbine All participating landowners » Coopers Gap Wind Farm CCC 25 August 2016
Slide 39: Modelling shadow flicker
39 6. Modelling shadow flicker Model Inputs: • Terrain • House locations • EIS turbine locations • Bureau of meteorology data 50 Shadow flicker duration can be m very sensitive to location One end of a property may experience none – the other end may exceed Conservative approach taken – maximum valu
Slide 40: Modelling shadow flicker – worst case
40 6. Modelling shadow flicker – worst case Assumes: • Full sun • Sun perpendicular to blades • Blades always spinning Does not account for: • Intervening vegetation • Direction of the wind (and hence the rotor plane of the wind turbine) • Weather (particularly cloud cover) • General visibility (inc
Slide 41: Modelling shadow flicker – accounting for cloud cover
6. Modelling shadow flicker – accounting for 41 cloud cover QLD Planning Guideline accounts for cloud cover and/or scheduling operation. Reduced limit of 10 hours per year shadow flicker. Still does not account for: • Blades not spinning in low wind • Intervening vegetation • Direction of the wind •
Slide 42: Modelling output
6. Modelling output 42 Distribution of shadow flicker with distance and position around turbine » Presentation Title Page 42
Slide 43: Page 43
43 » Presentation Title Page 43
Slide 44: Modelling output
6. Modelling output 44 • Shadow flicker experienced at seven properties at Coopers Gap • Exceeding at seven – all participating landowners • With cloud cover – five experience shadow flicker in excess of limits • Conservative estimate – not accounting for many factors that reduce shadow flicker • Ma
Slide 45: Wind turbines and fire management
45 Wind turbines and fire management • Helena Orel (AGL)
Slide 46: Wind turbines and fire management
46 3. Wind turbines and fire management Wind turbines and fire – Australia › 2000 – 2006. No fires caused by turbines. Macarthur Wind Farm VCAT panel report 2006 › 2006 – 2016 = three wind turbine fires, none resulting in fire damage outside of the turbine: › Cathedral Rocks Wind Farm, south coast,
Slide 47: Wind turbines and fire management
47 3. Wind turbines and fire management » Silverton Wind Farm 22 November 2012 - AGL External
Slide 48: Wind turbines and fire management
48 3. Wind turbines and fire management › Effective fire protection plans, fire detection and prevention systems are crucial › Wind turbines today incorporate highest quality and safety standards › Have multiple inbuilt fire suppression systems, fault detection monitors, circuit breakers, fuses and
Slide 49: Other business
49 7. Other business › Questions from group and observers? » Coopers Gap Wind Farm 25 August 2016
Slide 50: Next meeting and close
50 8. Next meeting and close › Next meeting: › Date › Time › Location » Coopers Gap Wind Farm 25 August 2016