Sarama Resources Ltd. · TSXV:SWA
Sarama Resources — Investor Presentation (April 2025)
14 slides from Sarama Resources's investor presentation, April 2025
Slide 1: Sarama Resources
ASX: SRR TSX-V: SWA SARAMA RESOURCES WEST AUSTRALIAN GOLD EXPLORER HIGHLY PROSPECTIVE LAND HOLDINGS + SUBSTANTIAL ARBITRATION CLAIM APRIL 2025 0
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS Information in this presentation that is not a statement of historical fact constitutes forward-looking information. Such forward-looking information includes, but is not limited to, information with respect to Sarama Resources Ltd’s (“Sarama” or the “Company”) planned exp
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS Exploration * 2 • Control of two belt-scale projects covering 1,000km in prolific Laverton Gold District • Gold projects have over 100 kilometres of strike in greenstone terrain open for exploration • Near 8Moz Gruyere Gold Mine and the 1Moz Golden Highway Project • Region lock
Slide 4: Eastern Goldfields Project Location
EASTERN GOLDFIELDS PROJECT LOCATION LOOKING FOR GOLD IN A DISTRICT HIGHLY ENDOWED WITH GOLD 400000 500000 600000 Bronzewing Bellevue Leinster Darlot Garden Well 2.5Moz Gruyere 6900000 >8Moz Agnew Thunderbox Golden Highway >11Moz >6Moz 1Moz +35Moz Au Cosmo Project Gilmore 50km 0.3Moz Koth Laverton >3
Slide 5: Exploration Opportunity
EXPLORATION OPPORTUNITY FAVOURABLE LITHO-STRUCTURAL DOMAIN, SIGNIFICANT GOLD SHOWINGS & SCALE 500000 600000 580km2 420km2 • Both gold projects located in greenstone belts with strong geological & structural similarities to the adjacent Dorothy Hills Great Central Road Greenstone Belt which hosts Gru
Slide 6: Cosmo Project
COSMO PROJECT READY FOR A MAJOR GOLD DISCOVERY • Belt scale covering 580km2 of Cosmo Newbery Greenstone Belt • Belt has historic gold showings and strong geological and structural similarities to the Dorothy Hills Greenstone belt which hosts the +8 Moz Gruyere Gold Deposit • Project is underlain by
Slide 7: Cosmo Project – Historical Workings
COSMO PROJECT – HISTORICAL WORKINGS • Gold first discovered the in the early 1900’s • Multiple shafts and workings mapped • Reports indicate very high grades mined • Mined material historically taken to a stamp mill in Laverton • Old timers only interested in narrow, high- grade quartz veins • Unlik
Slide 8: Cosmo Project – Target Generation
COSMO PROJECT – TARGET GENERATION Gold-in Soils Cosmo Gold Project Central Project Area • Geophysics & gold-in-soil surveys to play a major role in targeting • Similar surface cover regime to Gruyere • Kilometre-scale gold-in-soil anomalies associated with historic workings, diverse lithologies & st
Slide 9: Mt Venn Project
MT VENN PROJECT UNDEREXPLORED BELT-SCALE OPPORTUNITY 420km2 600000 • Head of Agreement signed to acquire 80% interest in Mt Venn Project – completion anticipated in June 2025 • Belt scale covering 420km2 of Jutson Rocks Greenstone Belt Great Central Road • Located approximately 40km west of the +8Mo
Slide 10: Mt Venn Project (cont.)
MT VENN PROJECT (cont.) UNDEREXPLORED BELT-SCALE OPPORTUNITY • Prospective geological setting including a regional structural corridor extending 50km-long and 1-3km wide over the full length of the Jutson Rocks Greenstone Belt • Abundant exploration potential remains in the belt with historic explor
Slide 11: Arbitration Claim
ARBITRATION CLAIM SIGNIFICANT VALUE DRIVER • Sarama is pursuing a significant arbitration claim following the illegal withdrawal of its rights to the multi-million-ounce Tankoro Gold Deposit in Burkina Faso • Engagement of Boies Schiller Flexner with excellent track record of securing large settleme
Slide 12: Corporate Overview
CORPORATE OVERVIEW EXPERIENCED BOARD & MANAGEMENT TEAM BOARD CAPITAL STRUCTURE Andrew Dinning Executive Chairman Common Shares 361.1m Simon Jackson Non-Executive Director Warrants (‘in the money’) Nil(1) Adrian Byass Non-Executive Director Employee Options (3c ‘in the money’ exp 7/2027) 9.9m(1,2) Mi
Slide 13: Company Outlook
COMPANY OUTLOOK CONSOLIDATE NEW GOLD PROJECTS AND PROSECUTE ARBITRATION Cosmo and Mt Venn Gold Projects • Finalise Mt Venn Project acquisition • First round of soils completed and awaiting results • Continue comprehensive review of existing project data • Complete targeting exercise and generate new
Slide 14: Andrew Dinning Executive Chairman
Andrew Dinning Paul Schmiede Qualified and competent person’s statement Executive Chairman VP Corporate Development Scientific or technical information in this disclosure that relates to exploration is [email protected] [email protected] based on information compiled or approv
Sarama Resources — Investor Presentation (April 2025) on 6ix