Energy Resources of Australia Ltd. Class A · ASX:ERA

Energy Resources of Australia Ltd. Class A — Non-Deal Roadshow (October 2013)

17 slides from Energy Resources of Australia Ltd. Class A's roadshow presentation, Oct 24, 2013

  1. Slide 1: ERA update

    ERA update Andrea Sutton| Chief Executive Steeve Thibeault | Chief Financial Officer 21-24 October 2013 www.energyres.com.au

  2. Slide 2: Acknowledge Traditional Owners

    Acknowledge Traditional Owners • The mining operations of Energy Resources of Australia Ltd (ERA) are located on Aboriginal land and are surrounded by, but separate from, Kakadu National Park • ERA respectfully acknowledges the Mirarr, Traditional Owners of the land on which the Ranger mine is situa

  3. Slide 3: Forward-looking statement

    Forward-looking statement • This presentation has been prepared by Energy Resources of Australia Ltd (“ERA”) and consists of the slides for a presentation concerning ERA. By reviewing/attending this presentation you agree to be bound by the following conditions. Forward-looking statements • This pre

  4. Slide 4: Agenda

    Agenda • Overview • Safety and people • Brine Concentrator • Ranger 3 Deeps • Progressive rehabilitation • Business Review • Market • Summary 4 www.energyres.com.au

  5. Slide 5: Overview

    Overview • Uranium market challenging in the near term, but long term fundamentals remain positive • In light of this, ERA’s strategic areas of focus continue to be: – Health, safety and environment • Year to date achieved all Injury Frequency Rate of 0.37 (12 month rolling average) – Increase resou

  6. Slide 6: Safety and people

    Safety and people 5 • Safety 4.5 4 – Continued strong focus on safety and has achieved a year to date all Injury Frequency rate (per 200,000 hrs worked) 3.5 Frequency Rate of 0.37 (12 month 3 rolling average) 2.5 – Record number of days without 2 recordable injury achieved on 7 August 1.5 AIFR LTIFR

  7. Slide 7: Ranger 3 Deeps exploration decline progress

    Ranger 3 Deeps exploration decline progress As at 13 October 2013 face position is 1,475 metres from surface 7 www.energyres.com.au

  8. Slide 8: First cross section of underground close-spaced drilling of the Ranger 3 Deeps mineral resource

    First cross section of underground close-spaced drilling of the Ranger 3 Deeps mineral resource completed • Ranger 3 Deeps Exploration Decline – Project on schedule and budget – 12 per cent of total drilling programme completed to date – Macmahon Underground Pty Ltd constructing decline – As at 13 O

  9. Slide 9: Ranger 3 Deeps exploration decline drilling sequence

    Ranger 3 Deeps exploration decline drilling sequence 3rd Drill fan currently in progress. Due for completion approximately mid November (grey) First drill fan complete (pink) Drilling plan to explore northern extension. Due for completion Current fan of drill approximately April holes. 2014 Due for

  10. Slide 10: Ranger 3 Deeps potential underground mine

    Ranger 3 Deeps potential underground mine • Ranger 3 Deeps Mine Prefeasibility Study – $57 million underground mine Prefeasibility study progressing in parallel to the decline construction – The Prefeasibility Study is on schedule, fully funded and on budget – The study includes - • further drilling

  11. Slide 11: Brine Concentrator formally opened on 19 September 2013

    Brine Concentrator formally opened on 19 September 2013 • The Brine Concentrator is critical to water management and the rehabilitation programme at Ranger mine • The Brine Concentrator was formally opened by NT Chief Minister Adam Giles on 19 September 2013 • Project has been delivered on schedule

  12. Slide 12: Progressive rehabilitation making good progress

    Progressive rehabilitation making good progress Pit 3 on completion of mining in November 2012 Pit 3 initial backfill as at September 2013 • Material moved into Pit 3 since December 2012 to date is approximately 19 million tonnes out of a total of 30 million tonnes • Pit 1 dewatering completed and i

  13. Slide 13: On track to meet 2011 cost savings target of $150 million by 2014

    On track to meet 2011 cost savings target of $150 million by 2014 • Reduced the number of employees by 20 per cent from 2011 to September 2013 At 30 June 2013, ERA has achieved total cumulative • Reduced indirect employees costs savings of $102 million through implementation of initiatives identifie

  14. Slide 14: Relationship with the Gundjeihmi Aboriginal Corporation

    Relationship with the Gundjeihmi Aboriginal Corporation • The relationship with the Gundjeihmi Aboriginal Corporation, who represent the Mirarr Traditional Owners continues to develop • In the first half of 2013, the focus has been on – Implementation of the Mining Agreement – Establishment of the K

  15. Slide 15: The market remains challenged in the near term

    The market remains challenged in the near term • The after effects of Fukushima continue to weigh on the market − No units operating in Japan, as the Nuclear Regulation Authority evaluates required upgrades and seismic safety − Units expected to be re-started in mid-2014, but progress may be slow •

  16. Slide 16: However, longer-term market fundamentals strong

    However, longer-term market fundamentals strong • Global long-term nuclear growth projections remain strong − China has 28 units under construction and another 53 planned by 2025 − Reactor growth still occurring in the US, Korea, UAE, India, and elsewhere • The growth drivers are largely unchanged −

  17. Slide 17: Summary

    Summary • Continued strong safety and environmental performance • 2013 production of uranium oxide is expected to be between 2,800 and 3,200 tonnes • Ranger 3 Deeps Exploration Decline and Ranger 3 Deeps Mine Prefeasibility Study, progressing on budget and on schedule • Key rehabilitation projects c