Horsehead Holding Corp

Horsehead — Corporate Update (January 2015)

12 slides from Horsehead's corporate update, Jan 6, 2015

  1. Slide 1: Horsehead Holding Corp. - New Zinc Plant, Mooresboro, NC

    HORSEHEAD HOLDING CORP. 255 102 0 150 150 150 0 153 153 2 104 140 192 192 192 New Zinc Plant, Mooresboro, NC – July 2014 January 6, 2015

  2. Slide 2: Legal Disclaimers

    2 Legal Disclaimers Forward Looking Statements This presentation contains statements, estimates and projections with respect to the anticipated future performance of the Company that may be deemed to be “forward‐looking statements”. You should not place undue reliance upon these statements. These st

  3. Slide 3: Agenda

    3 Agenda  Welcome and Introductions  Facility Overview and Status Update  Facility Tour  Q&A Session  Adjourn around 4:00 p.m.

  4. Slide 4: Company Transformation Timeline

    Company Transformation Timeline 4 2009: Initiated discussions with Tecnicas Reunidas regarding SX-EW zinc technology 2010: Launched feasibility studies on SX-EW project; conducted lab studies to confirm technical feasibility; initiated search for site location Feb. 2011: Announced exploratory plans

  5. Slide 5: Plant Update

     The ramp-up of zinc production at Mooresboro has accelerated after some initial delays.  June 2014 was the first full month of production with over 2,900 tons of zinc produced, ahead of our first month projection  The plant ramp-up was impeded in July by a corrosion-resistant coating failure on

  6. Slide 6: Simplified Block Diagram of Zinc SX/EW Plant

    Simplified Block Diagram of Zinc SX/EW Plant Electrowinning Melting Casting Area 500 Area 400 SX Stripping SX Depletion Area 200 Area 100 Gypsum Precipitation Cementation Bleed Treatment SX Extraction SX Washing Final Treatment Gypsum Effluent Zinc Conc. B Area 300 Cadmium Cement Waelz Oxide Wash/Le

  7. Slide 7: Start-up Milestones, Strategies and Risks

    7 Start-up Milestones, Strategies and Risks  Key Milestones: Status Dates – First Zinc Production Complete 5/14 – Achieve Cash Flow Break-even (~230 tpd) Capable, Inconsistent 1/15 (target) – First Lead-Silver Concentrate Current Focus 1/15 (target) – Eliminate need for calcine production (~330 tpd

  8. Slide 8: Summary

    8 Summary  Ramp-up pace has accelerated after initial unforeseen bottleneck issues.  Mooresboro investment is still expected to realize $90 to $110 million of incremental EBITDA compared to prior Monaca-based operation.  Zochem transformation is complete. Recent results support the potential to r

  9. Slide 9: Plant Tour

    9 Plant Tour  Safety Briefing  Tour Description

  10. Slide 10: Simplified Block Diagram of Zinc SX/EW Plant

    Simplified Block Diagram of Zinc SX/EW Plant Electrowinning Melting Casting Area 500 Area 400 SX Stripping SX Depletion Area 200 Area 100 Gypsum Precipitation Cementation Bleed Treatment SX Extraction SX Washing Final Treatment Gypsum Effluent Zinc Conc. B Area 300 Cadmium Cement Waelz Oxide Wash/Le

  11. Slide 11: Q&A Following Tour

    11 Q&A  Following Tour

  12. Slide 12: Adjourn

    12 Adjourn

Horsehead Holding — Corporate Update (January 2015) on 6ix