KCS Energy Inc

KCS Energy — Investor Presentation (November 2003)

36 slides from KCS Energy's investor presentation, Nov 7, 2003

  1. Slide 1: Growing Value Through the Drill Bit: 6,000,000 Share Offering

    Growing Value Through the Drill Bit 6,000,000 Share Offering Presentation to Investors November 2003

  2. Slide 2: Disclaimer

    Disclaimer This presentation material contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. The opinions, forecasts, projections or other statements, other than statements o

  3. Slide 3: Offering Summary (KCS-NYSE)

    Offering Summary (KCS-NYSE)

  4. Slide 4: Investment Considerations

    Investment Considerations Strong, double digit production growth 3Q '03 production of 100.3 MMcfepd represents a 20% increase over 1Q '03 Multi-year inventory of 300+ drilling locations Significant upside potential Continued low risk development and exploitation of core Mid-Continent fields High pot

  5. Slide 5: Management

    Management James W. Christmas Founder, Chairman & Chief Executive Officer William “Bill” N. Hahne... resident & Chief Operating Officer

  6. Slide 6: Overview

    Overview Independent domestic onshore E&P company, established 1988 Publicly traded on the New York Stock Exchange - "KCS" Equity market capitalization of approximately $325 million Approximately 400,000 share average daily trading volume Focused operations in the Mid-Continent and Gulf Coast region

  7. Slide 7: Strategy

    Strategy Focus on drill bit growth in production and reserves 92% year-to-date drilling success on 63 gross wells 300+ drilling prospects Capitalize on large inventory of drilling projects in current price environment Add 60 new drilling projects to the 2004/2005 program with offering proceeds Drill

  8. Slide 8: Mid-Year 2003 Reserves

    Mid-Year 2003 Reserves Netherland Sewell Reserves 234 Bcfe 75% Proved Developed 83% Natural Gas 80%+ Natural Gas PV10 = $461 Million R/P Ratio = 9 Years Additional Reserve Adds Since Mid-Year Anadarko Basin South Texas Sawyer Canyon Arkoma Basin Arklatex Mid-Continent Gulf Coast

  9. Slide 9: 2003 YTD Drilling Summary

    2003 YTD Drilling Summary Wells Dilled 63 (68 Suocesstul) ious Production Increased to 100.3 (08) from 83.9 (C1) Mviepd 1 20%, 35% Net Reserve Adds 50 Be for $39 million @ mid-year 1 400% of Production Driling Inventory 1 Adcitional Sawyer Canyon and Elm Grove locations established 1 1m Developing p

  10. Slide 10: 2003 Production

    2003 Production Jan. Feb. Mar. Apr. May June July Aug. Sept. East 20.4 27.4 90 20.4 West 55.6 62.8 66.6 68.9 75.7 75.3 78.2 82.5 88.8 North 25.4 22 19.4 19.5 18.3 18.4 17.5 17.2 16.8 Production Payment Net KCS 81.0 84.8 86.0 88.4 94.1 93.7 95.7 99.7 105.6

  11. Slide 11: Elm Grove Field, North Louisiana

    Elm Grove Field, North Louisiana Elm Grove Mid-Continent Gulf Coast

  12. Slide 12: Elm Grove Field, North Louisiana Type Log

    Elm Grove Field, North Louisiana Type Log Hosston (5,900' - 8,100') McFearen Fannie-Randall Turner (9,100' - 9,400') Cotton Valley Davis Upper Cotton Valley C&D Sands (8,500' - 9,100') Lower Cotton Valley A&B Sands (9,900' - 10,100')

  13. Slide 13: 2003 YTD Elm Grove Development

    2003 YTD Elm Grove Development Hosston Upper CV Davis Lower CV

  14. Slide 14: Future Elm Grove Development Program

    Future Elm Grove Development Program

  15. Slide 15: Elm Grove Field, North Louisiana Cotton Valley, Hosston Play

    Elm Grove Field, North Louisiana Cotton Valley, Hosston Play KCS WI = 100% - 8 Sections 65% - 1 Section 33% - 1 Section (Non-Op) 20 Wells in 2003 Average Cost: $1.3 million Initial Well Rate: 2.4 MMcfpd / well Reserve Potential: 1-3 Bcfe / well Anticipate 30-40 Wells / Yr. 50-100 Additional Wells 9/

  16. Slide 16: Joaquin Field, East Texas

    Joaquin Field, East Texas Mid-Continent Gulf Coast

  17. Slide 17: Joaquin Field Development Program

    Joaquin Field Development Program Older Completion Recent Completion 2003 Wells (Initial Test Rates) 2004 Wells Ellis #4 2100 MCFPD Rushing #3 1st Zone 1600 MCFPD 2nd Zone 1100 MCFPD 3RD Zone 850 MCFPD 4TH Zone 4900 MCFPD Hardin Simmons #2 1st Zone 700 MCFPD 2nd Zone 700 MCFPD 1 Zone to go Hanson #

  18. Slide 18: Joaquin Field Development Locations

    Joaquin Field Development Locations

  19. Slide 19: Joaquin Field, East Texas Travis Peak Sands

    Joaquin Field, East Texas Travis Peak Sands, Depth 6,000'-8,600' KCS WI = 74-100% 5 Wells Drilled in 2003 Average Cost: $1.6 million Initial Well Rate: 1-5 MMcfpd Reserve Potential: 1.5-3.0 Bcfe / well 10-30 Additional Wells

  20. Slide 20: Talihina Field, Oklahoma

    Talihina Field, Oklahoma Talihina Field Mid-Continent Gulf Coast

  21. Slide 21: Talihina Field Development

    Talihina Field Development Latimer County, OK - Jackfork Structure

  22. Slide 22: Talihina Field, Oklahoma Overthrust Jackfork Formation

    Talihina Field, Oklahoma Overthrust Jackfork Formation, Depth 3,900'-5,600' KCS WI = 30-75% 3 Wells in 2003 Average Well Cost: $1.6 million Initial Well Rate: 2-4 MMcfpd Reserve Additions: 2-6 Bcfe / well 5-20 Additional Wells Mid-Continent Gulf Coast Talihina Field

  23. Slide 23: Sawyer Canyon, Sutton Co., Texas

    Sawyer Canyon, Sutton Co., Texas Mid-Continent Gulf Coast Sawyer Canyon

  24. Slide 24: Sawyer Canyon Drilling Program

    Sawyer Canyon Drilling Program

  25. Slide 25: Sawyer Canyon, Sutton Co., Texas Canyon Sandstone

    Sawyer Canyon, Sutton Co., Texas Canyon Sandstone, Depth 4,000'-5,000' KCS WI = 90-100% 14 Wells Drilled in 2003 Average Cost: $0.4 million Initial Well Rate: 0.4 MMcfpd Reserve Potential: 0.4 Bcfe / well 35-100 Additional Wells Anticipate 15-20 Wells / Yr.

  26. Slide 26: Wilcox Trend Production

    Wilcox Trend Production Live Oak to Victoria Counties "Exploring on Trend" Ray George Prospect Coquat Prospect Qakville 89BCF 2.3 MMBC 5 Mile Creek Prospect East Marshall Prospect Mission Valley, W 56 BCF (EUR) Austin Prospect

  27. Slide 27: 2003 Gulf Coast Exploration Status

    2003 Gulf Coast Exploration Status

  28. Slide 28: 2004 Gulf Coast Exploration Program

    2004 Gulf Coast Exploration Program

  29. Slide 29: Drilling Inventory

    ng Inventory Elm Grove 8 19 50-100 Sawyer Canyon 4 1435-100 Joaquin = 5 5.20 Talihina 1 4 5.20 South Texas 16 16 2030 Other 26 itd 3550 53 75 150-320+ 2 KCS

  30. Slide 30: Financial Overview

    Financial Overview

  31. Slide 31: Recent Financial Performance

    Recent Financial Performance (1) Includes Non-Cash Deferred Tax Asset Adjustment of ($15.9MM) in 2002 and $11.0MM in 2003 Q2.

  32. Slide 32: Pro Forma Capitalization

    Pro Forma Capitalization (1) Pro forma the October 2003 conversion of all outstanding preferred stock in each column. (2) Based on 6/30/03 reserves estimate of 234 Bcfe.

  33. Slide 33: Acceleration of Drilling Projects

    Acceleration of Drilling Projects

  34. Slide 34: 2004 Capital Allocation

    2004 Capital Allocation Sawyer Canyon 6% $6 MM GC Expl. EG Joaquin Talihina SC Other MC GC Dev. East 12 42 13 3 6 13 11 West 30.6 38.6 34.6 31.6 North 45.9 46.9 45 43.9 Elm Grove 42% $44 MM Gulf Coast Exploration 12% $13 MM Gulf Coast Development 11% $12 MM Other Mid-Continent 13% $13 MM Talihina 3%

  35. Slide 35: Investment Considerations

    Investment Considerations Strong, double digit production growth 3Q '03 production of 100.3 MMcfpd represents a 20% increase over 1Q '03 Multi-year inventory of 300+ drilling locations Significant upside potential Continued low risk development and exploitation of core Mid-Continent fields High pote

  36. Slide 36: Slide 36

KCS Energy — Investor Presentation (November 2003) on 6ix