Vista Gold Corp · AMEX:VGZ

Vista Gold — Denver Gold Group European Gold Forum 2010

14 slides from Vista Gold's conference presentation, April 2010

  1. Slide 1: Corporate Presentation – European Gold Forum, Zurich

    CORPORATE PRESENTATION Denver Gold Group European Gold Forum – Zurich April 13-16, 2010

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This presentation contains forward-looking statements within the meaning of the U.S. Securities Act of 1933 and U.S. Securities Exchange Act of 1934 and forward-looking information within the meaning of Canadian securit

  3. Slide 3: Global Asset Base

    = _ — = > = Global Asset Base Paredones Amarillos fw Development Projects Pipeline @ Projects

  4. Slide 4: Corporate Information

    Corporate Information Listed on the NYSE Amex and TSX: VGZ 52-week range (US$): $1.45 - $3.38 Share price (04/09/2010): US$2.34 Market Cap: US$104.55 MM 44.7 million shares outstanding(1); 47.7 (53.6) fully diluted (convertible)(1) Strong balance sheet US$28.4 MM in cash(1) US$28.7 MM in convertible

  5. Slide 5: Investment Considerations

    Investment Considerations Strong project pipeline for accelerated growth Proven value-creation track record Substantial, multi-project resource base 17.5 million ounces of gold 73% in measured and indicated category On the path to production Permitting the 1.3MM oz Paredones Amarillos Project Prelim

  6. Slide 6: Vista – Gold Resources

    Vista – Gold Resources 73% of Vista resources are in measured and indicated category Since 2001, Vista’s Measured and Indicated gold resource has grown from 1.48MM to 12.8MM oz Proven & Probable Measured and Indicated Inferred Gold Gold Gold Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounce

  7. Slide 7: Paredones Amarillos

    Paredones Amarillos Baja California Sur, Mexico Bankable feasibility study updated in September 2009 Average annual production of 142,600 oz over first five years Average cash cost per ounce US$372 per oz over first five years Open pit mining - 3.6:1 strip ratio 11,000 tpd CIP circuit - 91.5% recove

  8. Slide 8: Paredones Amarillos – Permitting Update

    Paredones Amarillos – Permitting Update Permitting update Obtained Temporary Occupation Permits in October 2009 Currently amending application for Change of Land Use Permit required to commence construction to address procedural and administrative comments from SEMARNAT Working with Mexican advisors

  9. Slide 9: Mt. Todd

    Mt. Todd Northern Territory, Australia Acquired in 2006 for US$1.6 MM (US$0.48/oz) Large and growing resource 5.1 MM oz @ 0.84 g/t (M&I) 2.2 MM oz @ 0.74 g/t (Inferred) Preliminary feasibility study underway Targeted for completion mid 2010 Drilling ongoing to convert inferred resources Good locatio

  10. Slide 10: Mt. Todd – Preliminary Feasibility Studies Underway

    Mt. Todd – Preliminary Feasibility Studies Underway Prefeasibility – Scheduled for Q2 2010 Targeting 10+ million ounces Technical Program Development drilling to convert and add resources in Batman Pit area - drilling commenced Exploration drilling to test targets identified by 2009 field exploratio

  11. Slide 11: Mt. Todd – District Expansion

    Mt. Todd –District Expansion Strong potential for new discoveries 1,000+ Km2 of exploration licenses Quigleys, Golf-Tollis Similar and close to Batman deposit Historic (non-compliant) resource estimate of 79,000 ounces Silver Spray Gold values of 1.8 g/t over 600+ meters Potential for enrichment and

  12. Slide 12: Project Pipeline

    Project Pipeline Strong platform for future growth or near-term value realization Guadalupe de los Reyes (Mexico) Long Valley (California) Under-explored low-sulfidation Heap leachable deposit epithermal system with potential for Preliminary Economic Assessment high gold & silver grades completed in

  13. Slide 13: Experienced Management Team

    Experienced Management Team Strong team of mining executives with senior management experience in exploration, development, construction and operation of gold mining projects in similar geopolitical environments: Latin America: Andacolla, Eldorado, El Indio, Tambo, Pascua, Yanacocha Australia - Paci

  14. Slide 14: Conclusion

    Conclusion Vista Gold - on the path to production Proven value-creation track record Substantial, multi-project resource base 17.5 million ounces of gold On the path to production Permitting the 1.3MM oz Paredones Amarillos Project Preliminary feasibility study underway at the Mt. Todd Project Inves