CALGON CARBON Corp

CALGON CARBON — Baird's 2012 Industrial Conference

9 slides from CALGON CARBON's conference presentation, Nov 5, 2012

  1. Slide 1: Calgon Carbon Corporation Baird's 2012 Industrial Conference

    Calgon Carbon Corporation Baird‘s 2012 Industrial Conference Chicago, IL November 5, 2012 1

  2. Slide 2: Forward-Looking Information Safe Harbor

    2 Forward-Looking Information Safe Harbor This presentation contains historical information and forward-looking statements. Forwardlooking statements typically contain words such as “expect,” “believe,” “estimate,” “anticipate,” or similar words indicating that future outcomes are uncertain. Stateme

  3. Slide 3: CCC Products and Services (2011)

    CCC Products and Services (2011) 3 Activated Carbon Reactivation Equipment Technologies Consumer $486.5MM (89.8%) $46.3MM (8.6%) $8.7MM (1.6%)

  4. Slide 4: 2011 Calgon Carbon Diverse Markets

    4 2011 Calgon Carbon Diverse Markets Consumer 2% (2% in 2010) Drinking Water 25% (26% in 2010) Wastewater 20% (17% in 2010) Industrial Processes 13% (14% in 2010) Food 12% (13% in 2010) Air Pollution 20% (19% in 2010) Specialty 8% (9% in 2010)

  5. Slide 5: Growth from Environmental Regulations

    2012 2015 2013 2014 2016 2017 Compliance Timing Stage 2 DBPSchedule I* Stage 2 DBPSchedule II ** 7/13 USCG- New Build BWTS Req. Retrofit BWTS Capacity <5,000 m 3 MATS*** Coal Fired Utilities -60-75% of the Units 4/16/15 All ships- BWTS Req. USCG MATS – 100% of the Units 4/16/16 *Utilities serving 10

  6. Slide 6: Profitability Improvement is 2012 Top Priority

    Profitability Improvement is 2012 Top Priority • Improve balance in top- and bottom-line growth • 2009 – 2011 Revenue CAGR = 14.7% • 2009 – 2011 Net Income CAGR = 0.1% • Organizational realignment for company unification • Q2 12 initiated Cost Improvement Program 6

  7. Slide 7: Phase I Cost Improvements

    Phase I Cost Improvements Permanent Staff Reductions $ 5.3MM Operational Improvements at Pearl River $ 3.6MM Closure of Datong Facility $ 0.6MM Reduction in R&D Spending $ 0.5MM TOTAL $10.0MM 7

  8. Slide 8: Phase II Cost Improvements

    Phase II Cost Improvements • Plant Process Improvements • Product Rationalization • Asset Optimization • Organization/Staffing • Global Procurement • Calgon Carbon Japan, Pearl River Plants • 50% Reduction in Products • Warehousing/Transportation Costs 8

  9. Slide 9: Thank You!

    Thank You! Making Water and Air Safer and Cleaner Chemviron Carbon 9

Calgon Carbon — Baird's 2012 Industrial Conference on 6ix