PetroQuest Energy Inc

PetroQuest Energy — Investor Presentation (January 2016)

28 slides from PetroQuest Energy's investor presentation, Jan 12, 2016

  1. Slide 1: PetroQuest Energy, Inc. January 2016

    oe Energy, Inc. January 2016

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements 2 This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than statements of historical fact included in th

  3. Slide 3: Our Properties

    Our Properties 3 Gulf Coast Mid-Con Woodford Shale East Texas Cotton Valley • ~52,000 gross acres (~28,000 net acres) • 3Q15 production: 29 Mmcfe/d • 2014 wells(1) avg. IP 11.9 Mmcfe/d • 2015 wells avg. IP 14.2 Mmcfe/d • 2 well program for 2016 • 3Q15 production: 44 Mmcfe/d • Thunder Bayou discovery

  4. Slide 4: Arkoma Divestiture Recap

    Arkoma Divestiture Recap 4  Sold majority of Woodford and Mississippian Lime Assets in June 2015  Gross proceeds of $280 million represents over 9X cash flow  Significantly enhances liquidity and financial flexibility  Repaid all borrowings under credit facility  $55 MM undrawn credit facility

  5. Slide 5: Industry Activity - Cotton Valley Trend

    Industry Activity - Cotton Valley Trend 5 Hutchinson 9: 14.9 MMcfe/d EGP 63: 12.6 MMcfe/d Killen 13: 13.1MMcfe/d Wright 13: 30.3 MMcfe/d Werner 29: 26.7 MMcfe/d Colvin Estate 28: 26.6 MMcfe/d Berry 24H: 11.1 MMcfe/d Breffeilh: 11.1 MMcfe/d Walton 23H: 10.6 MMcfe/d PQ#13: 12.3 MMcfe/d PQ#14: 13.5 MMc

  6. Slide 6: One Year (6 well) CV Drilling: A Proxy for Growth

    6 One Year (6 well) CV Drilling: A Proxy for Growth 5.7 9.5 4 5 6 7 8 9 10 BCF E 67% Growth in Production 12/31/13 12/31/14 • 2014 growth metrics above achieved with 6 gross wells and net capital of ~ $39 million resulting in F&D of ~ $0.76/Mcfe. 47.6 89.2 20 30 40 50 60 70 80 90 BCF E 87% Growth in

  7. Slide 7: Cotton Valley Horizontal – Production Up with Costs Down

    Cotton Valley Horizontal – Production Up with Costs Down 7 Improving Well Performance (1) Excludes PQ #11 well which experienced mechanical issues during completion. 2014 -2015 Horizontal Cotton Valley Results $6.9 $5.6 $5.2 $4.5 4,232 4,106 4,147 3,000 3,500 4,000 4,500 5,000 $4.0 $5.0 $6.0 $7.0 $8

  8. Slide 8: 1st Year Cotton Valley Profile

    1st Year Cotton Valley Profile (1) 8 Drill & Complete Cost Total 1st Year Production Field Level Cash Flow (2) % of Payout 1st year Payout Period $5,000 M 2.3 Bcfe (6.3 MMcfe/d) $3,624 M 72% 30 mth (1) 2014 Avg. well performance; excluding PQ #11 (2) Price assumptions: $2.50/Mcf, $15Bbl of NGL and $

  9. Slide 9: Cotton Valley Horizontal Economics

    Cotton Valley Horizontal Economics 9 Assumptions (1) Gross Well Cost ($MM) 5.0 EUR (Bcfe) 8.6 IP Rate (Mmcfe/d) 11.9 % Gas / Liquids 70% / 30% IRR (%) 29% Payback (Yrs) 2.5 (1) 2014 Avg. well performance; excluding PQ#11; $2.50 gas , $15 NGL and $40 oil Sensitivity to Gas Prices 0 2000 4000 6000 800

  10. Slide 10: McFadden-Bagley Uni well production chart

    MCFADDEN-BAGLEY UNI 1 42365359740000 CUMGAS : 153,052 MCF CUMOIL : 835 BBLS CUMWTR : 22,183 BBLS 2/15/2006 8 2 0 0 8 2 5 0 8 3 0 0 8 3 5 0 8 4 0 0 8 4 5 0 8 5 0 0 8 5 5 0 8 6 0 0 8 6 5 0 8 7 0 0 8 7 5 0 8 8 0 0 8 8 5 0 8 9 0 0 8 9 5 0 9 0 0 0 9 0 5 0 9 1 0 0 9 1 5 0 9 2 0 0 9 2 5 0 9 3 0 0 9 3 5 0 9

  11. Slide 11: Cotton Valley Acreage Position

    11 Cotton Valley Acreage Position 52,000 Gross Acres (100% HBP) ~600 Gross Future Locations (300 Net)

  12. Slide 12: Gulf Coast – Free Cash Flow Generator

    Gulf Coast – Free Cash Flow Generator 12 Houston Lafayette Areas of Interest: Onshore S. LA / Shallow Water GOM Key Operating Metrics (1) Cash Flow = Revenues less lease operating expenses and severance taxes from Gulf Coast/Gulf of Mexico. Please see Appendix 4 for reconciliation. (2) 2014 Capex ex

  13. Slide 13: LaCantera/Thunder Bayou Deeper Pool Tests

    LaCantera/Thunder Bayou Deeper Pool Tests 13 ERATH FIELD Composite Outline of Field Pay 1.4 TCFE SOUTH ERATH DISCOVERY MID CRIS R HILCORP LIVE OAK FIELD 680 BCFG 11.7 MMBO STONE LA MONTANA PROSPECT 2015 /2016 SPUD LACANTERA DISCOVERY VOLUMES Booked – 125 BCFE 3P - 180 BCFE TIGRE LAGOON/ SOUTH TIGRE

  14. Slide 14: Thunder Bayou Recompletion: Low Cost Production Boost

    Thunder Bayou Recompletion: Low Cost Production Boost 14 • TB currently flowing from the lowest interval at gross rate of ~30 Mmcfe/d comprised of: • ~550 BBls/d of oil • ~900 BBls/d of NGLs • ~21,000 Mcf/d of gas • Recompletion scheduled for 1H16 in the primary sand package (116-137 Bcfe) • Expecte

  15. Slide 15: Thunder Bayou 2016 Recompletion

    Thunder Bayou 2016 Recompletion 15 Current Zone ~30 MMCFE/d from 48 net feet of pay 2016 Recompletion 154 net feet of pay

  16. Slide 16: Summary

    Summary  Arkoma Divestiture - significant liquidity building and deleveraging event  Zero drawn on $55 million borrowing base  Large cash position provides additional deleveraging options for $350 million 10% Senior Notes due September 2017  Focused Strategy to develop significant Low-Risk inven

  17. Slide 17: Appendix

    17 Appendix

  18. Slide 18: Hedging Positions

    Appendix 1 - Hedging Positions 18 Natural Gas Daily Hedged Volumes (Mmbtu) Price Jan16 - Jun16 10,000 $3.22

  19. Slide 19: Adjusted EBITDA Reconciliation

    Appendix 2 – Adjusted EBITDA Reconciliation  Adjusted EBITDA represents net income (loss) available to common stockholders before income tax expense (benefit), interest expense (net), preferred stock dividends, depreciation, depletion, amortization, loss on early extinguishment of debt , share base

  20. Slide 20: Discretionary Cash Flow Reconciliation

    Appendix 3 - Discretionary Cash Flow Reconciliation ($ in thousands) 2011 2012 2013 2014 9M15 Net income (loss) $10,548 ($132,079) $14,082 $31,190 ($231,379) Reconciling items: Income tax expense (benefit) (1,810) 1,636 320 (2,941) 1,079 Depreciation, depletion and amortization 58,243 60,689 71,445

  21. Slide 21: Gulf Coast/GOM Free Cash Flow Reconciliation

    Appendix 4 – Gulf Coast/GOM Free Cash Flow Reconciliation ($ in thousands) 2007 2008 2009 2010 2011 2012 2013 2014 Revenues $197,453 $198,949 $86,880 $100,618 $86,371 $61,788 $100,049 $121,859 Lease Operating Expense (18,483) ( 25,091) (18,907) (18,437) (16,292) (15,122) (21,407) (24,843) Severance

  22. Slide 22: La Cantera Development

    Appendix 5 - La Cantera Development 22 15,000 MCF/D + 250 Bbls of oil Lower Cris R-1 Lower Cris R-2, Lobe A Lower Cris R-2, Lobe B Lower Cris R-2, Lobe C (CURRENTLY PRODUCING) (CURRENTLY PRODUCING) ~200 feet of potential pay (CURRENTLY PRODUCING) 16,000 MCF/D + 240 Bbls of oil 1,500 MCF/D + 42 Bbls

  23. Slide 23: Panola County Cotton Valley – Room to Run

    Appendix 6 - Panola County Cotton Valley – Room to Run 23 Legend Cotton Valley Wells PQ CV Vertical Wells PQ CV Horizontal Wells PQ Area of Mutual Interest Carthage Field Area – 4.4 TCF of Unrisked Resource Potential 2.2 Tcfe of CV/TP/Bossier Unrisked Resource Potential

  24. Slide 24: Strong Track Record of Funding Drilling with Cash Flow

    Appendix 7 - Strong Track Record of Funding Drilling with Cash Flow 24 $ M M Total Direct CapEx and Cash Flows for the period between 2005 and 2014 PQ has balanced Capex and cash flow over the past 10 years (1) (1) Other proceeds include: sale of gathering system, equity proceeds, JV proceeds and ot

  25. Slide 25: Cotton Valley Horizontal – Horizontal Uplift

    Appendix 8 - Cotton Valley Horizontal – Horizontal Uplift 25 Horizontal Completions Realizing 12x EUR Uplift vs. Vertical Wells (1) Ryder Scott estimate excluding PQ #11 well which experienced mechanical issues during completion 0.7 8.6 0 1 2 3 4 5 6 7 8 9 10 61 Vertical Wells 2014 Horizontal Wells

  26. Slide 26: Woodford Position

    Appendix 10 - Woodford Position 26

  27. Slide 27: Woodford Dry Gas – East Hoss Joint Venture

    Appendix 11 - Woodford Dry Gas – East Hoss Joint Venture 27 Price JV Terms Gas* IRR $ 3.00 39% $ 3.50 57% $ 4.00 77% *Henry Hub JV Terms (1), (2) EUR (Bcf) 4.3 Gross Well Cost ($MM) 5.0 IP Rate (Mmcf/d) 4.0 % Gas 100% IRR (%) 57% Payback (Yrs) 1.4 • 38 dry gas wells included in joint venture should

  28. Slide 28: Company Information

    Company Information 28 400 East Kaliste Saloom Road, Suite 6000 Lafayette, Louisiana 70508 Phone: (337) 232-7028 Fax: (337) 232-0044 www.petroquest.com Version 2 This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and S

Petroquest Energy — Investor Presentation (January 2016) on 6ix