  1. Slide 1: CBM Potentiality and Prospects in India

    CBM Potentiality and Prospects in India CBM Potentiality and Prospects in India Prepared for: International Webinar on CBM Resource-Reserve Assessment Sponsored by: CMPDI-India CMM/CBM Clearinghouse Prepared by: Jonathan R. Kelafant, Sr. Vice President Advanced Resources International, Inc. Arlingto

  2. Slide 2: Presentation Title

    Presentation Title Presentation Title 1 Overview of India’s CBM Resources 2 Essar’s Raniganj CBM Project CBM Potential of CIL Areas (Jharia and 3 Raniganj) 2 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  3. Slide 3: Overview of India's CBM Resources

    Presentation Title Overview of India’s CBM Resources 3 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  4. Slide 4: Overview of India's CBM Resources

    Presentation Title Overview of India’s CBM Resources ▪ India’s coalfields contain an estimated 120 Tcf Damodar Valley of CBM distributed across 44 coalfields. ▪ The bulk of the resource is contained in the Damodar Valley Coalfields, the major coal mining province. ▪ Since 2001, 33 CBM blocks have be

  5. Slide 5: Major Active CBM Projects in India

    CBM Potentiality and Prospects in India India Over 600 CBM wells have been drilled in India, and this number is expected to double in the next several years as a result of developing infrastructure. Major Active Projects Company Project Status Market ESSAR Oil 300 wells drilled and producing; 150 GA

  6. Slide 6: Essar's Raniganj CBM Project

    CBM Potentiality and Prospects in India Essar’s Raniganj CBM Project 6 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  7. Slide 7: Leadership in Unconventional Space – Essar Oil and Gas

    CBM Potentiality and Prospects in India Leadership in Unconventional Space – Essar Oil and Gas Pioneers of CBM in India Mehsana First CBM wells drilled and tested in  CBM Resource 2 TCF  Recoverable 0.8TCF early 90’s (Gujarat-Mehsana lignites) (ARI 2019, 2C) Developed State of the Art Technology P

  8. Slide 8: Raniganj East CBM - Anchor Production Asset

    CBM Potentiality and Prospects in India Raniganj East CBM - Anchor Production Asset ❖ Block awarded on 26th July 2002 ‒ Project commissioned with 348 wells and related facilities as on April 1, 2018 ‒ Compression facilities for 2.1 MMscmd in place ‒ 300 KM of operational pipeline network (~65km Cust

  9. Slide 9: Raniganj Block – Historical Production

    CBM Potentiality and Prospects in India Raniganj Block – Historical Production Particulars Produced (Bcf) FY 2011 0.15 FY 2012 0.31 FY 2013 0.47 FY 2014 1.25 FY 2015 3.23 FY 2016 8.35 FY 2017 13.59 FY 2018 11.60 FY 2019 6.98 FY 2020(April-Sept) 2.81 Total 48.74 Peak production of above 1 MMSCMD achi

  10. Slide 10: Essar Field Facilities

    CBM Potentiality and Prospects in India Essar Field Facilities Main Compressor Station Well Cluster Separation Well Site 10 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  11. Slide 11: CBM Potential of CIL Areas (Jharia and Raniganj)

    CBM Potentiality and Prospects in India CBM Potential of CIL Areas (Jharia and Raniganj) 11 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  12. Slide 12: Overview of Field Development Plan – Jharia Coal Field

    CBM Potentiality and Prospects in India Overview of Field Development Plan – Jharia Coal Field 12 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  13. Slide 13: Reservoir Parameters for Jharia Block

    CBM Potentiality and Prospects in India Reservoir Parameters for Jharia Block Reservoir Simulation Parameters for Jharia CBM Block RESERVOIR PARAMETERS Imperial Metric 3 COAL DENSITY lb/ft 77.9 gm/cc 1.25 3 PRESSURE GRADIENT psi/ft 0.433 kPa/m 9.80 CLEAT POROSITY % 0.5 % 0.5 CLEAT WATER SATURATION %

  14. Slide 14: Reservoir Parameters for Jharia Block (Cont'd)

    CBM Potentiality and Prospects in India Reservoir Parameters for Jharia Block (Cont’d) All Seams Including XV and Below Seams XV and Below / Excluding Seams XII and XI Gas Gas Thickness Content Thickness Content Layer Seam(s) Depth (ft) (ft) (scf/ton) Layer Seam(s) Depth (ft) (ft) (scf/ton) 1 XVT/XV

  15. Slide 15: Methane Isotherm and Gas Contents Used in Simulation - Jharia

    CBM Potentiality and Prospects in India Methane Isotherm and Gas Contents Used in Simulation - Jharia Used in Study 15 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  16. Slide 16: Simulation Results (all seams): Gas Production - Jharia

    CBM Potentiality and Prospects in India Simulation Results (all seams): Gas Production - Jharia Comet3 by Advanced Resources International Gas Cum and Rate Vs. Time Gas Cum Vs. Time Gas Rate Vs. Time 7200000 1800 6400000 1600 GIP (Bcf): 16.6 Gas Production Rate, MSCFD 5600000 EUR-25 (Bcf): 7.8 1400

  17. Slide 17: Production Forecasts - Jharia

    CBM Potentiality and Prospects in India Production Forecasts - Jharia Summary of Single Well Simulation Results ▪ The field production profiles Non-Jharma Jharma for gas and water from the Model Area (ac) Area 40 Area 40 Jharia CMM block were No. Seams 19 17 Model Layers 9 8 generated using the sing

  18. Slide 18: Capital and Operating Cost Assumptions - Jharia

    CBM Potentiality and Prospects in India Capital and Operating Cost Assumptions - Jharia Capital Cost $,000 Location Cost (total land = 237-ac at $55.5M) Per Well 351.00 Civil Per Well 40.00 Geologic & Geophysical Per Well 7.50 Vertical Well Cost Per Well 724.10 Surface Facility Well Surface Facility

  19. Slide 19: Overview of Development Plan – Raniganj Coalfield

    CBM Potentiality and Prospects in India Overview of Development Plan – Raniganj Coalfield ▪ The map to the left shows the well locations proposed in the field development plan. ▪ Field development is assumed to begin in area V-B and progress outward from this point to optimize construction of surfac

  20. Slide 20: Reservoir Parameters for Raniganj Block

    CBM Potentiality and Prospects in India Reservoir Parameters for Raniganj Block Reservoir Simulation Parameters for Raniganj CBM Block - Developed Area Reservoir Langmuir Langmuir Gas Top Depth Thickness Pressure Volume Pressure Content Seam (ft) (ft) (psia) (scf/ton) (scf/cf) (psia) (scf/ton) (scf/

  21. Slide 21: Production Forecast: Vertical and Horizontal Well Development Case

    CBM Potentiality and Prospects in India Production Forecast: Vertical and Horizontal Well Development Case 21 | JAF2020_036.PPT | September 28, 2020 | www.adv-res.com

  22. Slide 22: Capital and Operating Cost Assumptions

    CBM Potentiality and Prospects in India Capital and Operating Cost Assumptions Capital Cost $,000 Location Cost Per Well 60.00 Geologic & Geophysical Per Well 7.50 Vertical Well Cost Per Well 744.00 Horizontal Well Cost Per Well (V portion) 239.40 Per Well (1 H Lateral(s)) 500.00 Surface Facility We

  23. Slide 23: Advanced Resources International

    CBM Potentiality and Prospects in India Office Locations Advanced Washington, DC 4501 Fairfax Drive, Suite 910 Resources Arlington, VA 22203 Phone: (703) 528-8420 International www.adv-res.com Knoxville, TN 1210 Kenesaw Ave. Suite 1210A Knoxville, TN 37919-7736 23 | JAF2020_036.PPT | September 28, 2

Advanced Resources International — International Webinar on CBM Resource-Reserve Assessment (September 2020) on 6ix