Neometals Ltd · ASX:NMT

Neometals — Mining 2015

40 slides from Neometals's conference presentation, Nov 12, 2015

  1. Slide 1: Mining 2015 Presentation

    For personal use only Mining 2015 Presentation ASX Code: NMT November 2015 1

  2. Slide 2: Disclaimer

    2 Disclaimer For personal use only Summary information: This document has been prepared by Neometals Ltd (“Neometals” or “the Company”) to provide summary information about the Company and its associated entities and their activities current as at the date of this document. The information contained

  3. Slide 3: Our Strategy

    Our Strategy For personal use only Develop low-cost operations with strong partners Quality captive resources Attractive commodities with strong, long-term fundamentals Focus on low-cost, downstream processing technologies for long-term profitability Reduce financial and operating risk via industry

  4. Slide 4: Corporate Details

    Corporate Details For personal use only ASX Code:Price NMT OTC: NMTUY (AU cents) ASX Code: NMT OTC: RDRUY 20 Last close ( 12 Dec 2014 ) 18 $ 0.036 Last close (10 Nov 2015) A$0.17 16 14 12 Shares on issue 10 M 499.4 Shares on issue 509 M 8 6 4 Cash (30 September 2015) A$34 M Cash 2 (30 Sept 2014) $m

  5. Slide 5: Group structure

    Group structure For personal use only Neometals Ltd (ASX:NMT) 45% 100% 70% Process Minerals Int’l 30% Reed Reed 30% Process Minerals Int’l Pty Ltd (Mineral Industrial Advanced Minerals Materials Pty Ltd (Mineral Resources Ltd) Pty Ltd Pty Ltd Resources Ltd) 25% Jiangxi Ganfeng Lithium Co., Ltd Mount

  6. Slide 6: All the right elements

    For personal use only for) All the right elements

  7. Slide 7: Lithium Fundamentals

    Lithium Fundamentals For personal use only + = 7

  8. Slide 8: Lithium Fundamentals

    Lithium Fundamentals For personal use only + = 8

  9. Slide 9: Lithium Fundamentals

    Lithium Fundamentals For personal use only + = 10

  10. Slide 10: Lithium Fundamentals

    Lithium Fundamentals For personal use only + = 11

  11. Slide 11: Mt Marion Lithium Project

    For personal use only Mt Marion Lithium Project 45% Neometals Ltd 25% Ganfeng Lithium 30% and Operator Mineral Resources Ltd (ASX:MIN) + = 12

  12. Slide 12: Project Strategy

    Project Strategy For personal use only Mt Marion Lithium Integrated Lithium Lithium Mine Hydroxide Plant Producer with Partner(s) Operated by MIN Ganfeng Offtake + = IN PATENTED CONSTRUCTION PFS COMPLETED + = 13

  13. Slide 13: Strong Operating Partner

    Strong Operating Partner For personal use only • Australia’s largest contract minerals processor • Provide complete mine-to-port solution • Build-Own-Operate basis • No upfront capital cost to NMT • Option to acquire up to additional 13.1% RIM for US$1.5M per 1% (US$19.6M) + = 14

  14. Slide 14: Strong Offtake Partner

    Strong Offtake Partner For personal use only • China’s 2nd largest, most profitable lithium producer • Life-of-Mine Take-or-pay offtake • At market price with floor price protection • Ability for MIN/Neometals to take equity share of production after 3 years. • Option to acquire up to additional 24%

  15. Slide 15: Flythrough

    16 For personal use only Flythrough + =

  16. Slide 16: Project Tenure

    17 For personal use only Project Tenure + =

  17. Slide 17: Site layout

    18 For personal use only Site layout + =

  18. Slide 18: Lithium Concentrate Prices

    Lithium Concentrate Prices For personal use only + = 19

  19. Slide 19: Near-term milestones

    Near-term milestones For personal use only Commence Commence Commence First Construction Mining Processing Shipment Nov 2015 Q1 CY16 July 2016 Q4 CY16  + = 20

  20. Slide 20: Downstream processing

    For personal use only Downstream processing Lithium Hydroxide (LiOH) 70% Neometals Ltd 30% Mineral Resources Ltd

  21. Slide 21: Strong demand – constrained supply

    Strong demand – constrained supply For personal use only

  22. Slide 22: Adaption of Chlor-Alkali Process

    Adaption of Chlor-Alkali Process For personal use only New Feed → Conventional Technology + = 23

  23. Slide 23: Own low-cost Patented Technology

    Own low-cost Patented Technology For personal use only + = 24

  24. Slide 24: Own low-cost Patented Technology

    Own low-cost Patented Technology For personal use only + = 25

  25. Slide 25: Pre-feasibility Study - Financial Metrics

    Pre-feasibility Study - Financial Metrics (*) For personal use only 10,000t LiOH Average [1 Annual Production 8,810t Li2CO3 Life of Plant (LOP) 20 years Life of Plant (LOM) Revenue US$ 3.15 billion Pre-production Capital cost US$ 83 million1 Pre-tax Net Cashflow A$ 1.19 billion Average Cost per tonn

  26. Slide 26: Commercialisation Plan

    Commercialisation Plan For personal use only Complete Pilot Plant FEED (FEL4) Definitive Hydromet & & Final Feasibility Electrolysis* Investment Study Decision* JuneQ 16 2016/17 2017 (*) Subject to RAM Board Approval + = 27

  27. Slide 27: Barrambie Titanium Project

    For personal use only Barrambie Titanium Project 100% Neometals + = 28

  28. Slide 28: Titanium Fundamentals

    Titanium Fundamentals For personal use only + = 29 Sources: Company Reports

  29. Slide 29: High Quality Resource

    High Quality Resource For personal use only 1 2 +150Mt 47Mt @ 3 @34% TiO2 22% TiO2 18% Lac Tio Barrambie* Tellnes * Mineral Resource Estimate (JORC2012) on page 29 + = 30 Sources: Company Reports

  30. Slide 30: Project Strategy

    Project Strategy For personal use only Mine, Concentrate Produce Titanium Integrated Titanium and Truck Pigment with Producer Titanium Industry Partner Concentrate + = + = 31

  31. Slide 31: Licenced low-cost Technology

    Licenced low-cost Technology For personal use only Competitors Input Price US$1,000/t X1.2t Final Final Chlorination Product ROM Chlorination Product Rutile & Purification Fine Ore & Purification Fine Pigment Pigment Cost Cost US$1,214/t US$2,100 - US$572/t 2,300/t  Mini-pilot scale testing in Cana

  32. Slide 32: Licenced low-cost Technology

    Licenced low-cost Technology For personal use only + = 33

  33. Slide 33: Pre-feasibility Study - Financial Metrics

    Pre-feasibility Study - Financial Metrics (*) For personal use only 98,000t TiO2 [1 Average Annual Production 2,000t V2O5 234,000t Fe2O3 Life of Mine (LOM) 19.6 years Life of Mine (LOM) Revenue A$ 8,746 million Pre-production Capital cost (excluding A$ 549 million1 EPCM and Contingency) Pre-tax Net

  34. Slide 34: Commercialisation Plan

    Commercialisation Plan For personal use only Pilot Scale Complete Beneficiation Definitive Final Pre-feasibility & Hydromet Feasibility Investment Study Test work Study Decision Aug 2015 2015/16 2016/17 Attract JV Partner + = 35

  35. Slide 35: Investment Proposition

    For personal use only 36 Investment Proposition + = 36

  36. Slide 36: Lithium: Cash and cashflow

    Lithium : Cash and cashflow For personal use only Binding Agreements Fully funded, with Ganfeng fully permitted   03 02 Production commencing 01 mid-2016 Great resource Strong partner + Take or pay offtake agreements = Plus Potentially US$46.8M from Strong market option exercise + = 37

  37. Slide 37: Titanium: A growth story for 2016

    Titanium : A growth story for 2016 For personal use only   03 01 02 Demonstrate Technical + Demonstrate Economic + Obtain Strong Partners Feasibility Viability to Commercialise + = 38

  38. Slide 38: Thank you

    For personal use only Thank you www.neometals.com.au + = 39

  39. Slide 39: Mineral Resource Estimate

    Mineral Resource Estimate for the Mt Marion Lithium deposit, as at September 2015, for a block cut-off grade of 0% Li2O For personal use only Classification Deposit Tonnes (Mt) Li2O % Fe2O3 % Indicated Area 1 4.43 1.46 1.32 Area 2 1.30 1.47 1.60 Area 2W 3.39 1.48 1.24 Area 4 0.94 1.25 1.36 Indicated

  40. Slide 40: Mineral Resource Estimate

    Mineral Resource Estimate for the Barrambie Ti-V deposit, as at September 2015, for a block cut-off grade of 15% TiO2 For personal use only Density TiO2 V2O5 Fe2O3 Al2O3 SiO2 Classification Zone Oxidation MTonnes (t/m3) (%) (%) (%) (%) (%) Eastern Oxide 18.7 2.82 23.29 0.59 42.93 10.70 16.36 Transit

Neometals — Mining 2015 on 6ix