Endeavour International Corp

Endeavour International — Investor Presentation (June 2006)

21 slides from Endeavour International's investor presentation, Jun 21, 2006

  1. Slide 1: Building the Leading North Sea Independent

    Building the Leading North Sea Independent June 2006

  2. Slide 2: Cautionary Statement

    Cautionary Statement This is an oral presentation which is accompanied by slides. Investors are urged to review our SEC filings. This presentation contains certain forward- looking statements regarding various oil and gas discoveries, oil and gas exploration, development and production activities, a

  3. Slide 3: Definitions

    Definitions P1 or Proved Reserves: SEC 1978- Current Definition, Code of Federal Regulations, 17 CFR 210.4-10 (Regulation S-X) "Proved oil and gas reserves are the estimated quantities of crude oil, natural gas, and natural gas liquids which geological and engineering data demonstrate with reasonabl

  4. Slide 4: Recent Developments

    Recent Developments Announced Acquisition of Talisman assets Closed Acquisition of Enoch interest Cygnus Gas Discovery

  5. Slide 5: Building the Leading North Sea Independent

    Building the Leading North Sea Independent OER Enoch Cygnus Talisman License Rounds Farm-ins Acquisitions Swaps

  6. Slide 6: Talisman Transaction Overview

    Talisman Transaction Overview Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing assets Acquisition of high quality North Sea producing as

  7. Slide 7: Transaction Impact

    Transaction Impact Immediate critical mass in North Sea 10,000+ boepd total company production at closing 25+ mmboe proved & probable reserves Diversification across 10 producing fields Balanced exposure to oil and gas Cash flow to support an exploration drilling program of 4-8 wells per year Portfo

  8. Slide 8: Sources and Uses of Funds

    Sources and Uses of Funds Sources Permanent Capital Structure Target Sources Permanent Capital Structure Target Uses Net Cash Flow From Jan. 1, 2006 ^ $40 Acquisition Price $414 Cash on Hand $19 Hedging Costs $10 Convertible Preferred Stock $125-250 Net Working Capital ^ $10 Senior Bank Facility $15

  9. Slide 9: Endeavour Assets - Central North Sea

    Endeavour Assets - Central North Sea

  10. Slide 10: Goldeneye: Block 20/4b Central North Sea

    Goldeneye: Block 20/4b Central North Sea First Production: Q4 2004 Producing Horizon: Lower Cretaceous Captain sandstone @ 8300 ft Drive Mechanism: Combination gas expansion with water drive Facilities: Producing from 4 piled steel platform, multiphase flow via 65 mi. 20" gas line to Segal terminal

  11. Slide 11: Alba Field: Block 16/26 Central North Sea

    Alba Field: Block 16/26 Central North Sea D10 212ft MD D-10 Horizontal Log Alba Sandstone First Production: 1994 Producing Horizon: Eocene Alba sandstone @ 6200 ft Drive Mechanism: Volumetric with pressure support from water injection Facilities: Alba North Steel Platform - processing, drilling and

  12. Slide 12: Bittern: Block 29/1b Central North Sea

    Bittern: Block 29/1b Central North Sea First Production: 2000 Producing Horizon: Eocene Forties sandstone @ 6700 ft Drive Mechanism: Limited natural water drive with pressure support via water injection Facilities: 2 Subsea Manifolds tied back to Triton floating production, storage and offloading (F

  13. Slide 13: Ivanhoe, RobRoy, Hamish, Renee, Rubie & Rochelle Fields

    Ivanhoe, RobRoy, Hamish, Renee, Rubie & Rochelle Fields - Blocks 15/27 & 28 Central North Sea IVRRH Stratigraphic Section First Production: IVRR 1989, H 1990, Renee 1999, Rubie 1999, Rochelle - undeveloped discovery Producing Horizon: IVRRH - Upper Jurassic Piper @ 7800'; Renee/Rubie - Upper Jurassi

  14. Slide 14: Commodity Prices

    Commodity Prices 2007 2008 2009 2010 2011 2011 Assumed Prices Assumed Prices Assumed Prices Oil ($/bbl) Oil ($/bbl) Oil ($/bbl) 65.00 65.00 65.00 65.00 65.00 65.00 Gas ($/mcf) Gas ($/mcf) Gas ($/mcf) 10.00 10.00 10.00 7.50 7.50 7.50 Hedges In Place Hedges In Place Hedges In Place Oil Swap Volume (bb

  15. Slide 15: Reinvestment of Pre Tax Cash Flow from Acquisition of Talisman Assets

    Reinvestment of Pre Tax Cash Flow from Acquisition of Talisman Assets 1 Income before income tax, after Petroleum Royalty Tax (PRT) and capital expenditures associated with the acquired assets, and after interest expense and dividends associated with acquiring the assets, assuming the capital struct

  16. Slide 16: Enoch - UKCS and Norway

    Enoch - UKCS and Norway Location: UKCS block 16/13a & NCS 15/5g Regional Setting: South Viking Graben Water Depth: 380 ft Fluid Type: Oil and gas cap Endeavour WI: 8% Partners: Talisman 25.2% (operator), Bow Valley Petroleum 12%, Roc Oil 12%, Dana Petroleum 8.8%, Altinex 4.3%, Statoil 11.8%, Dyas 14

  17. Slide 17: Cygnus Discovery: Preliminary Full Field Development

    Cygnus Discovery: Preliminary Full Field Development - Discovery Fault Block + 2 Adjacent Fault Blocks (44/11 & 12 Southern Gas Basin) 44/11 & 12 Mapped fault blocks at Top Leman Sandstone. IIa IIb III IV 44/12-2 Discovery Well TD 11600 ft WD 65 ft I 2 Km Reserves - Risked Net (BCF) P50 Cygnus - Fau

  18. Slide 18: Production Profile (P1+P2)

    Production Profile (P1+P2) 2004 2005 2006 2007 2008 2009 Njord & Brage 2038 1995 1861 1715 1767 2099 2341 1370 2456 2275 2098 2116 2038 1995 1900 1861 1704 1485 1537 1537 1537 1537 1537 1537 1537 1537 1534 1534 1534 1534 1534 1534 1604 1674 1744 1814 1884 1954 2024 2095 2165 2235 2305 2375 2406 2437

  19. Slide 19: Pro Forma Financial Metrics

    Pro Forma Financial Metrics 2007 Base 2.2 Upside 1.7 2007 Base 0.61 Upside 0.53 2007 Base 165 Upside 193 2007 Base 0.99 Upside 1.16 Assumptions: - - Permanent capital structure as described on page 8. - - Discretionary Cash Flow defined as cash flow from operations before changes in working capital.

  20. Slide 20: Peer Valuation Comparison

    Peer Valuation Comparison Current Year Multiples for Peers, Pro Forma 2007 for Endeavour 1 ALX DNO LUPE TLW PMO DNX Revus VPC END East 7.2 5 4.9 4.4 4 3.3 3.2 2.7 3.6 DNO BVX ALX OIL Revus LUPE PMO TLW DNX VPC END 16.1 12.2 11.5 9.6 9.4 7.8 7.2 5.3 4.6 2.7 1.7 BBG EAC FST THX ATP HAWK EPEX END 5.8 4

  21. Slide 21: Why Endeavour?

    Why Endeavour? Growth in production and cash flow Sustainable exploration program supported by high quality producing assets Balanced portfolio Distinctive investment opportunity Only pure-play North Sea independent Experienced and accomplished team Solid base of production with significant explorat

Endeavour International — Investor Presentation (June 2006) on 6ix