Global Ferronickel Holdings, Inc. · PSE:FNI
Global Ferronickel — ESG Presentation (June 2016)
9 slides from Global Ferronickel's sustainability presentation, June 2016
Slide 1: 2015 Environmental Protection and Enhancement Program
2015 Environmental Protection and Enhancement Program
Slide 2: Areas Affected by Mining Operation
Areas Affected by Mining Operation Active Areas - 266.2 hectares Mined-Out Areas - 13.98 hectares Settling Ponds - 15.66 hectares Waste Sump at Tandawa - 1.06 Hectares Industrial Areas PGMC Office/Camp 0.23 hectares MPSA Area 4,376.00 hectares Site -Causeway - 7.31 hectares Ancillary- 459.00 hectare
Slide 3: LAND
LAND ➢ Mining Forest/Mine Rehabilitation ➢ National Greening Program ➢ Nursery Production ➢ Slope Stabilization ➢ Backfilling and Re-shaping ➢ Maintenance of Re-vegetated areas
Slide 4: AREA: Block 20, CAGA 2 - CAGA 2 Rehab
AREA: Block 20, CAGA 2 CAGA 2 Rehab Completed for 2016 Block 2 - 1.16 hectares Block 20 - 1.76 hectares BEFORE, 2015 AFTER RE-SHAPING, 2015 Total Area - 2.92 hectares On-going Rehab for 2016 Block 20 - 1.20 hectares TO DATE, 2016
Slide 5: WATER
WATE R Steel type nursery hardening area will be established by 2016. Area: Adjacent Deltas Facing Hinadkaban Bay 46, 239 Total planted mangrove species
Slide 6: AIR
AIR Water Spraying 21 Pressurized Water Truck Aggregate Road Gravelling
Slide 7: Adopt-A-River Program
Adopt-A- River Program Dredging at Kinalablaban River 1 in 2012 Before During From 2011-2015, the Company was able to dredged 374,956.66 m3 od sediments and silt from Kinalablaban Rivers 1 and 2
Slide 8: Annual AEPEP Physical and Financial Accomplishment (2007-2015)
Annual AEPEP Physical and Financial Accomplishment (2007-2015) Php 425,460,042.37 (Plan) Php 616,545,591.23 (Actual) 169.33% 2007 2008 2009 2010 2011 2012 2013 2014 2015
Slide 9: End of Presentation
= Ferronickel Holdings, Inc. END OF PRESENTATION