Iamgold Corporation · TSX:IMG

Iamgold — Investor Presentation (March 2009)

100 slides from Iamgold's investor presentation, Mar 27, 2009

  1. Slide 1: Analyst Luncheon: Essakane & Westwood

    Analyst Luncheon ESSAKANE & WESTWOOD March 27, 2009

  2. Slide 2: Cautionary Statement

    2 Cautionary Statement This presentation contains forward-looking statements. All statements, other than of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements re

  3. Slide 3: Introductions

    INTRODUCTIONS 3  Denis Miville-Deschenes – SVP Project Development  Rejean Sirois – Manager, Mining Geology  Daniel Vallières - Manager, Underground Projects- Technical Services

  4. Slide 4: Recent Events

    Recent Events 4  Closed public offering & greenshoe for gross proceeds of Cdn$ 345 million  Financial position  Cash + gold bullion (at market) +credit facility ~US$ 530 million

  5. Slide 5: Essakane Ground Breaking Ceremony

    5 Essakane Ground Breaking Ceremony • Historical IAMGOLD event held on March 19, 2009 • 6,000 attendees present to officially launch the construction of Essakane • The goal is to partner with the government, people and communities of Burkina Faso to build a mutually Prime Minister Tertius Zongo offi

  6. Slide 6: Essakane, Burkina Faso

    ESSAKANE, BURKINA FASO The following information is a summary of detailed technical information provided in the NI 43-101 report filed on www.sedar.com under “Technical Reports” and on edgar on www.sec.gov/edgar.shtml, and also within a final prospectus dated March 18, 2009.

  7. Slide 7: West Africa, new Eldorado for mining sector?

    West Africa, new Eldorado for mining sector ? 7 Essakane

  8. Slide 8: Location

    Location J iBurki na Faso| ' 70 ee s MALI péla . Diapaga, ~*rada-N Gourma odoga. cong) — ew #) IAMGOLD

  9. Slide 9: Essakane Project

    Essakane Project 9 IAMGOLD is overall Project Manager  Total: $422.1 M  Owner: $275.3 M  Minproc: $146.8 M  Schedule (original): 18 months from construction release  Construction release February 25 2009

  10. Slide 10: 10

    10

  11. Slide 11: Capital Budget Summary

    Capital Budget Summary 11  Infrastructure $59.5 M  Processing Facilities $134.1 M  Plant & Equipments $100.7 M  Construction Indirects $ 50.7 M  General Services $ 34.4 M  Pre-Production $ 16.8 M  Corporate ESA $ 0.3 M  Contingency $ 25.4 M  TOTAL $422.1 M

  12. Slide 12: Introduction – Feasibility Study Addendum

    Introduction – Feasibility Study Addendum 12 1. Changed economics  Higher gold price environment  Higher costs for supplies, equipment and labor  Exchange rate fluctuations 2. Increased mill throughput for saprolite and transition ore 3. Reduced risks  Primary crushing  Production buildup  Tai

  13. Slide 13: Market Prices

    Market Prices 13 Market Prices DFS Addendum IAMGOLD Gold Price (US$/oz) Reserves $500 $600 $700 Economics $580 $800 $700 Fuel Price (US$/Unit Brent $50/bbl $84/bbl $65/bbl Diesel $0.65/l $0.96/l HFO $0.65/l $0.77/l $0.77/l Other consumables 2Q 2007-15% 1Q 2008 1Q 2008

  14. Slide 14: Currencies

    Currencies 14 Basis DFS Addendum Actual Base currency USD USD USD USD/EUR 1.10 1.48 1.35 USD/GBP 1.93 2.00 1.46 Rand/USD 7.29 7.40 9.4 CAD/USD - 1.00 1.22 USD/AUD - 0.90 0.70 Burkina Faso (FCFA)  Euro 1 EUR = 656 FCFA (Fixed)

  15. Slide 15: Geology

    15 Geology

  16. Slide 16: Regional Geology

    Regional Geology 16 • The Essakane Main Zone (EMZ) project occurs in folded sedimentary Birimian rocks (wackes, arenites, argillites and minor tuffs) which are intruded locally by intermediate and mafic sills. • EMZ is characterized by quartz veining system in folded arenite and argillite.

  17. Slide 17: Exploration concessions

    Exploration concessions 17 1620000 mmN Takabangou 180000 mmE EMZ 200000 mmE Markoye DEMBAM DEMBAM DEMBAM • Exploration lease : Approx. 1,500km2 Tin-Taradat • Essakane structure is 15 km long GOSSEY GOSSEY Bom Kodjelé Tin-Zoubaratan East • Three prospective areas: Gossey  Essakane Main Zone (EMZ) :

  18. Slide 18: Mining permit

    Mining permit 18 • Mining permit = 100.2km2

  19. Slide 19: Property Geology

    Property Geology 19 1594000 mN LEGEND 1592000 mN Mafic Dykes Faults N Fold axis Intrusive - Sills Main Arenite 1590000 mN Sandstone Conglomerate Turbidite 182000 mE 184000 mE 186000 mE 188000 mE 1588000 mN 1586000 N

  20. Slide 20: Essakane Main Zone Orebody

    Essakane Main Zone Orebody 20

  21. Slide 21: Resource Estimate

    Resource Estimate 21  Basis : May 2007 Resource Model Jan 2007 May 2007 May 2007 Res. Model Res. Model Whittle Contained (COG = 0.5 g Au/t) (COG = 0.5 g Au/t) $650/oz (COG = 0.5 g Au/t) Indicated Tonnage (Mt) 68.7 78.4 73.4 Grade (g Au/t) 1.56 1.58 1.62 In-situ (M oz) 3.45 3.99 3.82 Inferred Tonnag

  22. Slide 22: Resource Validation

    Resource Validation 22 • Resource model was validated in-house. • Independently reviewed by an external consultant. • Resource model estimate was judged acceptable. • No issues in the assay database used for the estimate and the block grade interpolation processes. • Opinion that the current Selecti

  23. Slide 23: Mining Reserves

    Mining Reserves 23 Total Weathering Type COG Au (g/t) Au (koz) g/t Au Tonnage (kt) Rec In-situ Rec In-situ Saprolite 0.441 13,915 1.313 1.363 587 610 Reserve Saprock 0.547 12,389 1.506 1.581 600 630 Material Fresh Rock 0.656 31,817 1.733 1.839 1,773 1,881 Total 58,121 1.584 1.670 2,960 3,121 Non- Sa

  24. Slide 24: Sensitivity of Mining Reserves

    Sensitivity of Mining Reserves 24 • From Whittle results (Indicated resources only): Gold Price Ore Ore Grade (g Au/t) Waste Total tonnes Strip Rec. Gold US$/oz Mt Rec. Diluted Mt Mt Ratio oz 300 18,295 2.43 2.54 66,760 85,055 3.65 1,429 360 27,091 2.17 2.27 86,939 114,030 3.21 1,889 480 44,572 1.82

  25. Slide 25: Pit Design & Mine Plan

    Pit Design & Mine Plan 25 • Mine life of 8.7 years / Mill schedule of 9.3 years • Mine capacity of 32Mt/y plus stockpile reclaim Period Ore Tonnes Ore Grade Waste Ore Total Strip Reclaim Moved (kt) (g Au/t) (kt) Ratio (kt) (kt) Pre-prod 1,989 1.258 6,010 7,999 3.02 1 8,519 1.613 23,482 32,001 2.76 2

  26. Slide 26: Mine Operating Costs

    Mine Operating Costs 26  Mining costs are based on a site fuel price of 0.81 US$/liter. – Derived from US$80/bbl – Fuel represents 26% of operating cost.  Average mining cost of 1.60 US$/t.  Operating cost breakdown for base case: – Fuel = 26% – Labor = 18% – Other consumables and parts = 56%

  27. Slide 27: Process Plant

    Process Plant 27  Conventional Carbon-In-Leach (CIL) gold recovery plant  Capacity 7.5Mtpa with oxides and transition ore, 5.4Mtpa with fresh ore  Average Gold Recovery 94.8% (varies with ore type and grade)  High gravity recovery (40-80% in lab work), estimated at 40% feasibility study

  28. Slide 28: Gold Recovery

    Gold Recovery 28 Rock Type Recovery Saprolite 96.3% Transition 95.0% Fresh 94.2%

  29. Slide 29: Mill Operating Costs

    Mill Operating Costs 29  Varies by ore type with saprolite requiring more cyanide but significantly less grinding media and wear parts.  Mill operating costs excluding power: Cost Component Saprolite Transition Fresh Rock Reagents 2.55 3.33 4.10 Maintenance 0.29 0.34 0.39 Assay & Lab 0.06 0.06 0.0

  30. Slide 30: Mill Schedule

    Mill Schedule 30 Mill Feed  Mill feed composition: – 24% Saprolite, 21% Transition, 55% Rock  Average LOM mill recovery of 94.8%  Gold production of 2.96M ounces Feed In-situ Rec. Period Sap. Tran. Rock Total grade Gold Rec. Gold kt kt kt kt g/t k ozs % k ozs 1 6,237 1,263 - 7,500 1.649 398 96.3%

  31. Slide 31: Power Supply

    Power Supply 31 HFO 380 Plant 1. 5 units x 5.5 MW + 1 unit x 2.0 MW = 29.5 MW 2. Operating cost = 0.17 US$ per KWh 3. Power Cost: 3.93 US $ per tonne milled

  32. Slide 32: Water Balance Schematic

    Water Balance Schematic 32 Pit dewatering Domestic wells Goroum wells Dust control Surface drainage Process water Off-channel reservoir Tailings pond

  33. Slide 33: Water Sources

    Water Sources # IAMGOLD Ki AC | b. mle ry) |) = \ “hy, + y < Se Y $s \S=3 Y SA = Z 4 BR 2 Fi 7) Ma AY c & 4 2

  34. Slide 34: General Services Costs

    General Services Costs 34 The average LOM G&A cost is 1.57 $/t Includes the following aspects:  All administrative and support personnel;  Local employee transportation;  Food & lodging for camp (340 people during operations);  Insurance;  Purchasing and warehousing;  Accounting and auditing f

  35. Slide 35: Environment

    ENVIRONMENT

  36. Slide 36: Arid Climate

    Arid Climate 36  500 mm precipitation per year in 4 months  67 rainy days per year  2,5 m evaporation per year

  37. Slide 37: Community Engagement

    COMMUNITY ENGAGEMENT: a key to the success of the Essakane Mining Project

  38. Slide 38: Communities within the mining project area

    Communities within the mining project area 38 Challenge 3: Alternatives / cohabitation with artisanal mining N

  39. Slide 39: Memorandum of Understanding

    Memorandum of Understanding 39  Community consultations, including extensive discussions on resettlement packages (Aug – Dec 2007), culminating in signature of a Resettlement Memorandum of Agreement between the project-affected communities and Essakane S.A. in December 2007. The agreement defines:

  40. Slide 40: Example of Existing and Replacement Houses

    Example of Existing and Replacement Houses 40 Residential building – Essakane Site Replacement building

  41. Slide 41: Financials

    FINANCIALS

  42. Slide 42: Financial Model Assumptions

    Financial Model Assumptions 42 Government take:  Royalties: 3%  Equity interest: 10% (NPI)  Withholding tax on interest and dividends: 6.25%  Corporate income tax: 20%  Tax on outside services: 10%  Charge on labor (taxe d’apprentissage): 4% (2nd half mine life)  Duties and tax on supplies an

  43. Slide 43: Financial Model Assumptions

    Financial Model Assumptions 43  Gold Price and Fuel Price – Gold: US$700/oz – Fuel: US$80/bbl  Initial CAPEX: US$420M  Sustaining CAPEX: US$12M

  44. Slide 44: Implementation Plan

    Implementation Plan 44 IAMGOLD is overall Project Manager  Mill: Minproc EPCM  Power plant: Supplier-EP/EPCM/O&M  Mine plant: IMG & Sub-contractors  Camp: IMG & Sub-contractors  Relocation Village: IMG/Re Plan – Local contractor  Major Earthwork: IMG/Golder (Eng. + QA/QC)  Mine Pre-Production

  45. Slide 45: Financial Model – Base Case Scenario

    Financial Model – Base Case Scenario 45 Low Base Gold Price $600/oz $800/oz Brent Price (US$/bbl) 65 84 Diesel Essakane Price (US$/l) 0.82 0.96 HFO Essakane Price (US$/l) 0.68 0.77 Cash costs Excl. royalties & charges 307 321 Incl. royalties & charges 335 355 Project Cash Flow ($M) 461.56 1,011.23 G

  46. Slide 46: Construction Update

    Construction Update 46  Progress (as of March 2009)  Old camp site and offices refurbished  Mine village, truck shop, kitchen, rec hall and adm office ordered  Foundations: mine village, truck shop, offices, tower cranes by a local contractor

  47. Slide 47: Construction Update

    Construction Update 47  Laydown area prepared  Construction power and water finalized  Ten prefab modules being erected in the Mine Village  Mine Village to be completed by the end of April 2009  Truckshop being erected  ESA workforce increased (expats & nationals) to reflect the change of sco

  48. Slide 48: Construction Update: Mill Area

    Construction Update 48  Relocation: 5 villages relocated with success  Construction of 450 houses at Essakane Village started in January 2009 MILL AREA  Earthwork contract awarded to BCM  Minproc mandate changed from EPCM to EP in Jan.2009  ESA Construction Team is reviewing Minproc engineering

  49. Slide 49: Construction Update

    Construction Update 49  Most of major equipment ordered  Budget being reviewed to reflect change of mandate  On critical path: - process water: BWS, pumping & piping arrangement - complete review of equipment selection in the plant - tailings disposal: piping, thickeners, pumping - PO to be place

  50. Slide 50: Construction Update: Mine Operations

    Construction Update 50 Mine Operations:  Mine equipment ordered, some has been delivered  In pit stripping has started  Material used for road construction or stockpiled in the mill area if suitable  Construction of roads, airstrip  Water and Tailings: - Off Channel Reservoir completed (650,000

  51. Slide 51: IAMGOLD

    “hi. IAMGOLD CORPORATION

  52. Slide 52: IAMGOLD

    ON CORPORA IAMGOLD

  53. Slide 53: 53

    53

  54. Slide 54: IAMGOLD

    #1AMGOLD

  55. Slide 55: 55

    55

  56. Slide 56: General Services

    General Services 56  Oracle implementation  Completed Audit Procurement and Logistics  Risk Assessment  Exploration program  Hiring and Training

  57. Slide 57: Westwood Development Project

    WESTWOOD DEVELOPMENT PROJECT The following information is a summary of detailed technical information provided in the NI 43-101 report filed on www.sedar.com under “Technical Reports” and on edgar on www.sec.gov/edgar.shtml, and also within a final prospectus dated March 18, 2009.

  58. Slide 58: Introduction

    58 INTRODUCTION  OVERVIEW  GEOLOGY  MINING  OPERATING COSTS  FINANCIAL ANALYSIS  COMPARISON OF WESTWOOD OPERATING COSTS WITH DOYON  PROJECT STRENGTHS  QUESTIONS

  59. Slide 59: Summary 2008 Activities

    59 Summary 2008 Activities  Drilling 68,000m  Resources evaluation June 30th  Development in Ore (5,000 tonnes bulk sample)  Raise boring & Shaft sinking decision  Revised Scoping  Expenditures US$ 38.6M

  60. Slide 60: Summary 2009 Budget

    60 Summary 2009 Budget  Drilling 73,000 meters  Complete shaft raise boring (840m by March)  Start shaft sinking in June (500 meters by year end)  Ventilation raise 6m diam. by year end  Development work will 2,000 meters horizontal development  Drift trough Bousquet fault  Additional 5,000 t

  61. Slide 61: Geology

    GEOLOGY

  62. Slide 62: Regional and Local Geology

    62 Regional and Local Geology Mouska Doyon IAMGOLD IAMGOLD Mouska Mic Mac 0.8 Moz Westwood-Warrenmac Doyon Bousquet-Laronde Agnico-Eagle El-Coco Agnico-Eagle Westwood 6.6 Moz Warrenmac Ellison 3.3 Moz 3.9 Moz 10 Moz Légende géologique Autres Groupe de Blake River Basalte et tuf Groupe de Piché Schis

  63. Slide 63: Schematic Plan View of the 14th Level

    Schematic Plan View of the 14th Level 63 Westwood Gold Corridors (from south to north) 1. Westwood (& Warrenmac) - within altered felsic volcanics 2. North Corridor - within mafic volcanics 3. Zone 2 - within altered intermediate to felsic volcanics

  64. Slide 64: Cross-Section 4400E (looking west)

    64 Cross-Section 4400E (looking west) Westwood Gold Corridors (from south to north) 1. Westwood (& Warrenmac) - within altered felsic volcanics 2. North Corridor - within mafic volcanics 3. Zone 2 - within altered intermediate to felsic volcanics

  65. Slide 65: Resources (June 2008)

    65 Resources (June 2008) Inferred Resources by Cut-Offs Cut-off Tonnes Grade Ounces g Au/t (000's) g Au/t (000's) 1 19,894 6.0 3,817 2 16,390 6.9 3,658 3 14,182 7.6 3,482 4 11,283 8.7 3,154 5 9,052 9.7 2,836

  66. Slide 66: Resources (June 2008)

    Resources (June 2008) 66 • 34 zones within the three mineralized corridors were interpreted using minimum true thickness of 3.0 meters • 0.5 and 1 meter length composites (capped before interpolation) • Only composite within same zones are used (hard boundary) • Method = inverse distance square tech

  67. Slide 67: Resources (June 2008): Warrenmac

    Resources (June 2008) 67  Warrenmac (West of Bousquet fault)  Accessible by ramp  Currently in mine plan for years 14 and 15 but will be accelerated should zinc-copper prices improve sooner  Requires mill modifications that would take about 14 months and $12 million Indicated Resources and Proba

  68. Slide 68: Resources (June 2008)

    68 Resources (June 2008) Inferred Resources - Lens WW25 (Cut-off = 4 g Au/t or NSR = $80/tonne) Au Ag Zn Cu Tonnes Lens Corridor Cut-off (000's) Ounces Ounces g/t g/t % Tonnes % Tonnes (000's) (000's) 4 g Au/t 856 6.0 164 WW25 Westwood $80 NSR 1,294 5.0 207 25.0 1,039 1.98 25,639 0.12 1,567 Diff. 43

  69. Slide 69: Ore Continuity

    69 Ore Continuity SILL ZONE 2-30 Average Grade (g Au/t) Surface Ore stockpile 6.4 Muck sampling 7.5 Chip sampling 5.1 Drill Holes (over 3m) 5.5 Average grade 6.1 Tonnes Ore Stockpile 5,695 SILL ZONE 2-62

  70. Slide 70: Budget 2009 – Exploration ($4.7M)

    70 Budget 2009 – Exploration ($4.7M)

  71. Slide 71: Budget 2009 – Valuation + Definition Drilling ($4.0M)

    71 Budget 2009 – Valuation + Definition Drilling ($4.0M)

  72. Slide 72: Mining

    MINING CORPORATION

  73. Slide 73: Resources Used in Scoping Study

    73 Resources Used in Scoping Study  Inferred and indicated resources were used for the study  Mining resources (includes > 4.0 g Au/t grade and > 80$/t NSR)  Resources affected by bousquet fault were taken out  Resources calculated to a minimum width of 3 meters were recalculated on 2.5meters To

  74. Slide 74: Operating Costs

    OPERATING COSTS # IAMGOLD

  75. Slide 75: Operating Costs (C$000)

    75 Operating Costs (C$000) Operating Costs (C$000) $/t milled Total 2009 2010 2011 2012 2013 2014 2015 2016 2017 + Exploitation Definition Drilling 2.50 29,824 375 0 0 1,750 2,000 2,000 2,000 2,000 19,699 Stope Preparation 14.41 171,872 0 609 2,332 10,358 11,989 11,708 14,512 24,317 96,047 Extractio

  76. Slide 76: Construction and Capital Expenditures

    CONSTRUCTION AND CAPITAL EXPENDITURES

  77. Slide 77: Site Plan

    Site Plan PERMANENT ‘SUB STATION \ t # IAMGOLD

  78. Slide 78: Capital Cost Summary (C$000)

    78 Capital Cost Summary (C$000) Capital Cost Summary (C$000) Capital Sustaining Exploration phase II 7,000 Valuation Drilling 17,900 Deferred Development 108,989 195,277 Construction Surface 84,551 15,541 Studies 1,440 Shaft 62,760 Stationary Equipment 2,887 4,120 Constructions 5,820 3,110 Surface M

  79. Slide 79: Construction Site Overview

    79 Construction Site Overview

  80. Slide 80: Project Economics

    =-CONOMICS iO) CORPORATION

  81. Slide 81: Global Assumptions

    81 Global Assumptions Prices  Gold (US$/oz) 700  Silver (US$/oz) 8.00  Copper (US$/lb) 2.50  Zinc (US$/lb) 1.00  Exchange (US$/C$) 1.25

  82. Slide 82: Economic Evaluation (C$000)

    82 Economic Evaluation (C$000) Tonnes Mined 11,929,742 Tonnes Milled 11,929,742 Gold Production (oz) 2,809,289 Copper Production (000 lb) 2,476 Zinc Production (000 lb) 43,118 Gold Revenues (C$000) 2,512,185 $/t milled (C$000) Mining 62.46 745,133 Processing 19.12 228,081 Administration 6.19 73,815

  83. Slide 83: Westwood Project Sensitivity

    83 Westwood Project Sensitivity (C$ 000) NCF Sensitivity BEFORE TAX vs GOLD PRICE 1,600,000 1,400,000 Base Case Gold Price : $700/oz. 1,200,000 0.0% 5.0% 1,000,000 7.5% 10.0% 800,000 600,000 400,000 200,000 0 -200,000 $500 $550 $600 $650 $700 $750 $800 $850 $900 BASE GOLD $500 $550 $600 $650 $700 $7

  84. Slide 84: Doyon vs Westwood

    DOYON vs WESTWOOD # IAMGOLD

  85. Slide 85: Cost Difference Doyon - Westwood

    85 Cost Difference Doyon - Westwood  Annual Tonnage  Equipment  Performance  Pillar recovery  Strike length  Simpler geological comprehension  Automation  Start on new bases  Dilution

  86. Slide 86: Impact of Annual Tonnage (C$/t)

    86 Impact of Annual Tonnage (C$/t) 000 tonnes/year 1200 Doyon Westwood 1000 $57.46 $60.34 $87.77 800 600 $76.16 $81.73 400 $107.25 $136.23 200 000 2003 2004 2005 2006 2007 2008

  87. Slide 87: Equipment

    87 Equipment Westwood vs Doyon  New equipment compared to 20 years old equipment  Standardization  Reliability / Availability  Operating costs per hour  Performance

  88. Slide 88: Performance

    88 Performance Westwood vs Doyon  Introduction of Automation: » Development and production drilling » Hoisting » Tramming » Ventilation on demand  Next generation communication system: » Fleet tracking devices » Personnel tracking and communication device

  89. Slide 89: Doyon 9th Level

    89 Doyon 9th Level • Significant development at Doyon was needed due to more complex orebody than Westwood 900m 630m

  90. Slide 90: Westwood Project – Level 1320

    90 Westwood Project – Level 1320 Less development required at Westwood as compared with Doyon

  91. Slide 91: Pillar Recovery

    91 Pillar Recovery Achieved 2008 Doyon mine plan 1,570 m Depth (1,022m)

  92. Slide 92: Westwood Longitudinal Section

    92 Westwood Longitudinal Section 1.6km

  93. Slide 93: Production: Expected Dilution

    93 Production: Expected Dilution Innovative Design for an Inclined Drift to allow 2.5 metre mining width Common Proposed method method Expected Dilution Expected Dilution

  94. Slide 94: Ore Development: Quantity vs Quality

    94 Ore Development: Quantity vs Quality TEST REAL CONDITIONS  Narrow feature of the deposit: Minimum thickness Doyon (4.0m) Westwood (2.5m)

  95. Slide 95: Doyon Mill Complex: Modifications Required

    Doyon Mill Complex 95 Modifications Required for Westwood • Increase the copper flotation circuit capacity • Relocate and add more capacity to the cyanide destruction process (detox) • Add a desulphuration circuit (reclaiming of Doyon tailings) • Relocate the existing paste backfill plant near the W

  96. Slide 96: Doyon Mill Complex

    Doyon Mill Complex 96 Two kilometres west of Westwood

  97. Slide 97: Milestones

    97 Milestones  Production begins in first quarter 2013 Schedule 2009 2010 2011 2012 2013 2014 2015 Doyon Mine Exploration Program Studies Surface Work Shaft Phase I (above 1,080m) Shaft Phase II (below 1,080m) Development above 1,080m Production above 1,080m Development below 1,080m Production belo

  98. Slide 98: Strengths

    Strengths 98 • Well established mining camp with several multi-million ounce gold deposits • Skilled and experienced manpower in the Abitibi area • Low-cost power • Low/no-risk mining jurisdiction and well defined regulations • Simple relatively predictable geology • Robust grades at 8 g Au/t • Doyo

  99. Slide 99: Questions

    RPORA #/IAMGOLD ep) Cc 2 —_ Y) ®o =) Oo

  100. Slide 100: Thank you!

    z ° bE < a ° a as ° jas) Thank you!

IAMGOLD — Investor Presentation (March 2009) on 6ix