Naturgy Energy Group, S.A. · BME:NTGY

Naturgy Energy — Gas Natural Fenosa — FY2014 Earnings Presentation

47 slides from Naturgy Energy's earnings presentation, Feb 17, 2015

  1. Slide 1: Fourth Quarter 2014 Results (FY 2014)

    Fourth Quarter 2014 Results (FY 2014) Febr ar 17, February 17 2015

  2. Slide 2: Disclaimer

    Disclaimer This document may contain market assumptions, different sourced information and forward-looking statements with respect to the financial condition, results of operations, business, strategy and the plans of Gas Natural SDG, S.A. and its subsidiaries (GAS NATURAL FENOSA). Such assumptions,

  3. Slide 3: Agenda

    Agenda 1. Highlights 2. Financials 3. Analysis y of operations 4. Conclusions 3

  4. Slide 4: Highlights

    Highlights 4

  5. Slide 5: Key financial indicators

    Key financial indicators Net Income: €1,462 million (+1.2%)1 EBITDA: €4,853 million (+0.1%)1 €1 799 million2 (+23.6%) Investments: €1,799 (+23 6%)1 Net Debt: €16,942 million (+18.9% vs 31/12/13)1 Notes: 1 Changes vs FY13 after restatement of FY13 figures to IFRS 11. 2 Tangible and intangible 5

  6. Slide 6: Shareholder remuneration

    Shareholder remuneration Total dividend1 ((€ million)) +1 2% +1.2% +0.3% 895 898 9094 z 2014 dividend1 resulting in a +8.7% 8233 payout of 62.1% and a yield of 4.4%2 504 505 511 z Interim dividend paid on 8 463 January (€0.397/share in cash) z Final dividend to be p paid in cash (no scrip) 391 393 3

  7. Slide 7: IFRS 11

    IFRS 11 ● As from 1 Januaryy 2014,, IFRS 11 is mandatory, y, so the equity q y method is now used for the accounting of joint ventures ● The following table shows the restatement to IFRS 11 of GNF GNF’s s FY13 figures: FY13 as FY13 Change g (€ million) reported IFRS 11 EBITDA change breakdown Net In

  8. Slide 8: Results of FY14 impairment analysis

    Results of FY14 impairment analysis z Impairment of €485 million after the Egyptian gas provider failed to meet its gas supply commitments z Recorded at UF Gas level (Equity income) z Impairments of €47 million corresponding to other assets (NGS and other minor failed projects) z No need for additio

  9. Slide 9: Regulation in Spain

    Regulation in Spain Gas ● New regulation in effect as of 5 July 2014 brings both higher stability and predictability di t bilit ● Financial stability: rules set to prevent future tariff deficits from arising, and current tariff deficit to be recovered over 15 years ● Predictability: 6-year regulator

  10. Slide 10: Currency exchange translation

    Currency exchange translation Impact on EBITDA By country By quarter (€ million) (€ million) 70 44 Rest Mexico 8 32 3 Moldova 4 28 Brazil 4 (10) 27 Colombia 1Q14 2Q14 3Q14 4Q14 FY14 Negative g impact p limited to 1H14 10

  11. Slide 11: Tax reform in Spain

    Tax reform in Spain z Law 27/2014 of 27 November reduces the corporate tax rate in Spain z 2015: from 30% to 28% in 2015 z 2016 onwards: from 28% to 25% z The subsequent restatement of deferred tax assets and liabilities resulted in a €325 million lower corporate tax expense for 2014 The above accou

  12. Slide 12: Net Income analysis

    Net Income analysis (€ million) +1.2% 218 (61) 1,462 1,445 (532) 252 325 (141) (44) 2013 Impairments Regulatory Currency Deferred Capital gains3 Activity Tax effects 2014 impact in exchange taxes growth and other Spain 1 translation2 Disregarding impairments and deferred tax revaluations net income

  13. Slide 13: 2013-2015 Efficiency plan

    2013-2015 Efficiency plan Key initiatives g on EBITDA1 ((€ million) Cost savings in 2013-2014 300 - Reducing services and 228 discretionary cost - Streamline commercial and operational 108 costs - Cost optimization in corporate areas 2013 2014 2015 E Achieved €228 million at end 2014, in line with t

  14. Slide 14: Acquisition of CGE

    Acquisition of CGE Impact on the Strategic Plan 2013-2015 2013 2015 targets z Completing an investment initially not made explicit, but held as an option, as it fell within the targeted leverage range z Advancing the achievement of aspirations for 2017: z An additional contribution to results which

  15. Slide 15: Other highlights for 2014

    Other highlights for 2014 International power generation z Establishment of GPG z Commissioning in October 2014 of the 234 MW Bii Hioxo wind farm in Mexico z Completing the Torito 50 MW mini hydro plant (Costa Rica) expected to be in operation in 1H15 International gas distribution z Two new concess

  16. Slide 16: Financials

    Financials 16

  17. Slide 17: Consolidated Income Statement

    Consolidated Income Statement (€ million) FY14 FY131 Change % Net sales 24 742 24,742 24,322 24 322 1.7 17 Purchases (17,368) (16,892) 2.8 Gross Margin 7,374 7,430 (0.8) Personnel Net Personnel, (832) (827) 0.6 Taxes (481) (510) (5.7) Other expenses, Net (1,208) (1,244) (2.9) EBITDA 4,853 4,849 0.1

  18. Slide 18: EBITDA breakdown

    EBITDA breakdown Change (€ million) FY14 FY131 €m % Gas Distribution: 1,542 1,671 (129) (7.7) Europe 937 986 (49) (5.0) Latin America 605 685 (80) (11.7) Electricity Distribution: 970 950 20 2.1 Europe 622 610 12 2.0 Latin America 348 340 8 2.4 Gas: 1,190 1,145 45 3.9 Infrastructures 288 258 30 11.6

  19. Slide 19: Investments

    Investments Tangible and intangible Change (€ million) FY14 FY131 €m % Gas Distribution: 708 488 220 45.1 Europe 360 307 53 17.3 Spain Latin America 348 181 167 92.2 Electricity Distribution: 356 357 (1) (0.3) +4.4% Europe 233 229 4 1.7 Latin America 123 128 ((5)) ((3.9)) International Gas 51 40 11

  20. Slide 20: Net Debt evolution

    Net Debt evolution (€ million) +18.9% +17.6% 1 125 1,125 3 587 3,587 16 942 16,942 16 759 16,759 1,353 (183) 14,252 (3 375) (3,375) 2 Net Debt Investments Dividends FFO and other CGE Net Debt Provisional Adjusted Net 31/12/13 1 acquisition and 31/12/14 deviations Debt 31/12/14 associated debt electr

  21. Slide 21: A comfortable debt maturity profile

    A comfortable debt maturity profile A off D As December b 3131, 2014 (€ million) 1 Net Debt: €16.9 billion Gross Debt: €20.5 billion 7,087 2 805 2,805 2 927 2,927 2 913 2,913 7 080 7,080 2,344 2,468 2,917 799 765 2015 2016 2017 2018 2019 2020+ z Average life of Net Debt ~5 years z 74% 4% off N Net D

  22. Slide 22: An efficient Net Debt structure

    An efficient Net Debt structure As of December 31 31, 2014 Majority of debt at fixed rates Conservative currency exposure with very competitive cost policy 22% 20% Euro Fixed 5% US$ Floating 75% 78% Other Diversified financing sources 27% Capital markets 64% Institutional banks 9% Bank loans Efficie

  23. Slide 23: Ample liquidity available

    Ample liquidity available As of December 31, 2014 (€ million) Limit Drawn Undrawn Committed lines of credit 7,405 473 6,932 Uncommitted lines of credit 557 163 394 EIB loan 53 - 53 Cash - - 3,573 TOTAL 8 015 8,015 636 10 952 10,952 z Additional capital market capabilities of ~€5 €5,300 300 million b

  24. Slide 24: A sound capital structure

    A sound capital structure Achieving a strong capital structure… z Positive structural free cash flow generation z Capital structure further strengthened by recent €1,000 million 8-year hybrid (4.125% coupon) z Acquisition of CGE completed for €2,519 million with own funds z Successful issuance of a

  25. Slide 25: Analysis of operations

    Analysis of operations 25

  26. Slide 26: Gas Distribution Europe (I)

    Gas Distribution E Europe (I) Sales Connection p points (GWh) (‘000) -10.1% 5,627 +1.0% 5,683 5 683 194 975 194,975 3,786 175,223 455 457 3,407 191,189 5,172 5,226 171,816 FY13 FY14 31/12/13 31/12/14 Spain Italy Continued expansion p of distribution networks in an unusually warm year 26

  27. Slide 27: Gas Distribution Europe (II)

    Gas Distribution E Europe (II) Investments (€ million) 360 +17 3% +17.3% 307 25 z Capex in network expansion in 28 Spain consistent with new 335 regulation that incentivises 279 growth z 48 new municipalities FY13 FY14 connected in 2014 EBITDA (€ million) 986 937 -5.0% z Lower gas sales in both Spai

  28. Slide 28: Gas Distribution Latin America (I)

    Gas Distribution Latin America (I) () Gas sales (GWh) Connection points (000) 227,377 +9.5% 249,067 6,321 +4.3% 6,593 +0.9% +6 4% +6.4% 46,912 1,434 1,348 46,516 +30.9% 24,522 18,736 +4.6% 2,518 2 635 2,635 +18.8% 88,961 105,682 +4.3% 899 938 1 % -1.7% +1.9% 73,164 71,951 1,556 1,586 FY13 FY14 31/12

  29. Slide 29: Gas Distribution Latin America (II)

    Gas Distribution Latin America (II) ( ) z Growth capex leads to 272,000 new Investments connection points vs end FY13 (€ million) 348 z Brazil: recording in 2014 of part of commitments for 2014-2016 brings 181 rise in capex growth +92 3% +92.3% z Colombia: achieving growth mainly in industrial custo

  30. Slide 30: Electricity Distribution Europe (I)

    Electricity Distribution E Europe (I) Sales TIEPI1 ((Spain) p ) (minutes) (GWh) -1.6% 34,804 34,262 FY13 FY14 2,541 2,621 47 48 32,263 31,641 +2.1% FY13 FY14 Spain Moldova Lower electricity y sales after falling g demand in Spain p due to mild winter weather and weaker markets Note: 1 “Tiempo de int

  31. Slide 31: Electricity Distribution Europe (II)

    Electricity Distribution E Europe (II) Investments (€ million) 229 233 +1.7% 14 15 z Over 4.5 million connection points at end of FY14 215 218 z Recent regulatory measures in FY13 FY14 Spain lead to lower opex and a EBITDA containment in capex (€ million) 610 622 +2.0% 35 37 z Efficiency ypplan with

  32. Slide 32: Electricity Distribution Latin America (I)

    Electricity Distribution Latin America (I) () Electricity sales (GWh)1 Connection points (000)1 +5.8% 2,925 +3.7% 3,032 16,204 17,150 529 +4.3% 552 +5.1% 4,495 4,275 2,396 2,480 +6.1% +3.5% 11,929 12,655 FY13 FY14 31/12/13 31/12/14 Colombia Panama Current operations offer potential for both network

  33. Slide 33: Electricity Distribution Latin America (II)

    Electricity Distribution Latin America (II) ( ) Investments1 (€ million) 126 123 50 59 z Temporary slowdown of investments -2.4% in Colombia while waiting for the 76 64 consolidation of efforts made in the reduction of losses and bad debt FY13 FY14 EBITDA2 z Revenues additionally benefiting (€ milli

  34. Slide 34: Gas and electricity demand in Spain

    Energy Gas and electricity demand in Spain Conventional gas demand Electricity demand (GWh) (GWh) -9.8% -1.2% 246,372 243,431 276,718 249,658 FY13 FY14 FY13 FY14 Source: Enagas S Source: REE Gas demand reduced by y milder winter which also leads to lower electricity demand 34

  35. Slide 35: Gas supply (I)

    Energy G supply Gas l (I) Spain International (GWh) -5.9% 210,506 198,117 +23.6% -12.5% 120,560 19,336 97,504 16,910 30,786 -16.0% 25,851 +16.6% 74,453 63,840 -3.1% 160,384 155,356 +37.0% 3 0% 46,107 33,664 FY13 FY14 FY13 FY14 Industrial and third party supply 1 Europe Rest Residential CCGTs Spanish

  36. Slide 36: Gas supply (II)

    Energy G supply Gas l (II) Wholesale Retail z International sales represent 38% z Expanding in retail liberalized markets of total in FY14 (vs 32% in FY13) in Europe (Spain (Spain, Italy) z Consolidating presence in z Over 12 million active contracts (gas, main international LNG power and services)

  37. Slide 37: An integrated and flexible gas business model

    Energy A iintegrated An t t d and d flexible fl ibl gas business b i model d l P Procurement t I f t Infrastructures t S Supply l Domesttic market Retail Piped gins NG Industrial Op & third party Diverse orig ptionality supply CCGTs LNG Foreign markets k t ● No equity gas exposure ● Flexible managem

  38. Slide 38: Impact on the short term

    Energy I t on the Impact th short h t term t GNF’s Business model hedge z Most of GNF gas sales are to end customers and sales margins are fixed z International LNG sales in 2015: z Hedged with procurement - same index index- and negotiated in 2013 z International LNG sales are in US$; historical co

  39. Slide 39: Long term vision

    Energy L Long t term i i vision LNG demand/supply growth GNF’s business model flexibility z Emerging countries’ economic z Diversified and flexible supply, growth relies on LNG demand strong market position and own growth LNG fleet allow value creation z New LNG projects (investment under most marke

  40. Slide 40: Electricity Spain (I)

    Energy El t i it Spain Electricity S i (I) GNF’s total production (GWh) -7.2% 32 897 32,897 30,542 -11.7% 2,352 -3.6% 2,077 4,434 , 4,275 +3.2% 4,287 4,425 5,430 +3.5% 5,622 -13.7% 16,394 14,143 FY13 FY14 CCGTs Coal Nuclear Hydro Cogen. and Renewables1 Lower production compensated by +5 +5.4% 4% gro

  41. Slide 41: Electricity Spain (II)

    Energy Electricity Spain (II) Electricity sales Average pool price EBITDA (GWh) (€/MWh) (€ million) +5.4% -5.1% +2.6% 32,941 34,718 44.25 782 41.99 762 FY13 FY14 FY13 FY14 FY13 FY14 Source: REE EBITDA impact from new regulatory measures (RDL 9/2013)1 compensated with good performance from liberalize

  42. Slide 42: Cogeneration and renewables

    Energy C Cogeneration ti and bl 1 d renewables Total production (GWh) -11.7% z Commissioning of new small hydro plants leads to a significant growth 2,352 2 352 -75.0% 2,077 i output in t t 348 87 362 +19.9% 434 z Cogeneration impacted by new regulation -5.2% 1,642 1,556 z Low average pool prices fo

  43. Slide 43: GPG International power generation

    GPG International power generation Production z GPG includes electricity generation assets ((formerly y Latin America and (GWh) 18,183 17,740 other) -2.4% 2.4% z Lower generation activity in Central America and Caribbean FY13 FY14 z Lower investments due to higher Investments concentration of capex

  44. Slide 44: CGE Main magnitudes for 2014

    CGE Main magnitudes for f 2014 FY14 FY13 Change % Gas Distribution: Gas sales (GWh) 43,668 39,314 11.1 Distribution network (km) 8,192 8,068 1.5 Connection points (000’s) 593 573 3.5 Electricity Distribution: Electricity sales (GWh) 15,565 15,075 3.3 Connection p points ((000’s)) 2,854 2,777 2.8 Ele

  45. Slide 45: Conclusions

    Conclusions 45

  46. Slide 46: Conclusions

    Conclusions EBITDA +0.1% 0.1% and Net income +1.2% 1.2% showing a resilient business model Recent regulatory developments in electricity and gas in Spain help dispel uncertainty CGE acquisition enhances GNF’s international growth while maintaining a solid business model and risk profile LNG wholesal

  47. Slide 47: Thank you

    Th k you Thank INVESTOR RELATIONS telf 34 934 025 897 telf. 34 912 107 815 e-mail: [email protected] website: www www.gasnaturalfenosa.com gasnaturalfenosa com