Sundance Energy Inc

Sundance Energy — Sundance Energy Australia — Investor Presentation (August 2018)

22 slides from Sundance Energy's investor presentation, Aug 2, 2018

  1. Slide 1: Disclaimers: Important Notice and Disclaimer

    Disclaimers Important Notice and Disclaimer IMPORTANT: You are advised to read the following carefully before making any use of the information contained in this presentation. Except as required by law, no representation or warranty, express or implied, is made by Sundance or any of the Sundance Rel

  2. Slide 2: Disclaimers: Industry data, past performance, forward-looking statements

    Disclaimers Industry data Certain market and industry data used in connection with this presentation, including in relation to other companies in Sundance’s peer group, may have been obtained from public filings, research, surveys or studies conducted by third parties, including industry or general

  3. Slide 3: Disclaimers: Proved and probable reserves

    Disclaimers Proved and probable reserves Ryder Scott Company, L.P. (Ryder Scott) has prepared an independent estimate of the proved and probable reserves, future production and income attributable to leasehold interests within the recently closed acquisition of 21,900 net acres for sale by Pioneer N

  4. Slide 4: A Leading Pure Play Eagle Ford Producer

    A Leading Pure Play Eagle Ford Producer Premier Asset Base ~56,500 net acres primarily in the Eagle Ford’s Oil and Volatile Oil Window 461 undrilled Tier-1 Eagle Ford locations represent 12+ years drilling inventory Proximity to Gulf Coast provides exposure to export market Brent/LLS pricing Aggress

  5. Slide 5: High Quality Asset Base with Material Inventory

    High Quality Asset Base with Material Inventory 12+ years of Tier-1 drilling inventory(2) with $963.6 MM of 2P PV10 as at year end 2017(1) 1P & 2P reserves PV-10 values increase by $262 MM and $367 MM respectively at current strip prices(2) Highly attractive single well economics (65%+ IRR or higher

  6. Slide 6: 2018 and 2019 Summary Guidance

    2018 and 2019 Summary Guidance(1) Delivering Substantial Operational and Financial Growth Over the Next 18 Months Sundance exceeded second quarter 2018 production guidance and met top end of guidance range for the first half of the year Development plan is on track, with 12 wells spudded and 3 wells

  7. Slide 7: Successfully Executing Development Plan

    Successfully Executing Development Plan Fixed-Price Service Contracts All contracts at fixed rates in-line with previously announced capital budget Executed one year and three month contracts for two built-to-suit 1500 horsepower Patterson walking rigs Contract being finalized for dedicated frac cre

  8. Slide 8: Year to Date 2018 Development – Legacy Acreage

    Year to Date 2018 Development – Legacy Acreage 3 1 2 Atascosa McMullen La Salle McMullen AREA 41 AREA 11 AREA 21 Paloma Ranch Single Well Pad Paloma Ranch 7H 1 Peeler Ranch Two Well Pad Peeler Ranch 8HC & 9HC 2 Allen MCM Two Well Pad Allen MCM 1HA & 2HA 3 Legacy Acreage Development Detail Five wells

  9. Slide 9: Year to Date 2018 Development – Newly Acquired Acreage

    La Salle McMullen AREA 41 AREA 11 AREA 21 Year to Date 2018 Development – Newly Acquired Acreage 5 7 6 4 8 Atascosa Live Oak Harlan Bethune Three Well Pad Harlan Bethune 25H, 26H & 27H 4 Harlan Bethune Two Well Pad Harlan Bethune 34H & 35H 6 James Keith Esse Four Well Pad James Keith Esse 06H, 07H,

  10. Slide 10: Year to Date 2018 Development – Results vs Type Curve

    Year to Date 2018 Development – Results vs Type Curve Paloma Ranch 7H Actual Performance vs Type Curve(1) Peeler Ranch 8H & 9H Actual Performance vs Type Curve(1) Actual initial production results as compared to internal Company planning Type Curve.

  11. Slide 11: Year to Date 2018 Development – Guided vs Estimated Well Costs

    Year to Date 2018 Development – Guided vs Estimated Well Costs(1) Guided D&C Costs vs Estimated D&C Costs ($US Millions) Year to date estimated well drilling & completion costs have been in line with Sundance guidance on both a well-by-well and total basis More recent wells have been drilled with mo

  12. Slide 12: Premier Asset Base & Drilling Inventory

    Premier Asset Base & Drilling Inventory ~56,500 net acres primarily in the Eagle Ford’s Oil and Volatile Oil Windows Highly attractive single well economics (65% IRR or higher) across assets at existing commodity prices(1) Area 41 Live Oak locations have IP-30’s >580 bbl/d with greater than 80% % li

  13. Slide 13: Highly Attractive Returns Across Asset Base

    Highly Attractive Returns Across Asset Base Atascosa County Live Oak County La Salle County 25% McMullen County 25% Well level returns withstand stress-testing under different commodity pricing and capital cost scenarios 25% 25%

  14. Slide 14: Current Fracturing Design & Evolution

    Current Fracturing Design & Evolution Evolution of Sundance’s “Gen-5” Frac Design Testing improved performance and cost reduction through greater use of 100 Mesh sand frac treatment (up to 100%) Substantial cost savings potential through self sourcing of local sand, diesel and select frac chemicals

  15. Slide 15: Crude Hedge Contracts

    Crude Hedge Contracts(1) Weighted-Avg. Pricing Year Bbl Bbl/d Floor Ceiling 2018 960,000 5,217 $64.75 $68.76 2019 1,937,000 5,307 $59.74 $65.91 2020 1,266,000 3,468 $53.36 $59.09 2021 612,000 1,677 $48.49 $59.23 2022 528,000 1,447 $45.68 $60.83 2023 160,000 438 $40.00 $63.10 Total 5,463,000 $55.95 $

  16. Slide 16: Pathway to Value

    Pathway to Value 12+ years of highly attractive Tier 1 drilling inventory with $963.6 MM of 2P PV10 as at year end 2017(1) 1P & 2P reserves PV-10 values increase by $262 MM and $367 MM respectively at current strip prices(2) Sundance is successfully executing 2018 development plan according to timel

  17. Slide 17: Appendix I Reserve Estimate Assumptions

    Appendix I Reserve Estimate Assumptions

  18. Slide 18: Underlying Assumptions for Reserve PV(10) estimates

    Underlying Assumptions for Reserve PV(10) estimates Unless otherwise noted, the PV(10) values provided in this presentation were based on Ryder Scott’s evaluations effective 1 January 2018, and are subject to the following underlying assumptions: NYMEX Strip (Varying) Prices Oil Pricing: WTI pricing

  19. Slide 19: Underlying Assumptions for Reserve PV(10) estimates

    Underlying Assumptions for Reserve PV(10) estimates Unless otherwise noted, the PV(10) values provided in this presentation were based on Ryder Scott’s evaluations effective 1 January 2018, and are subject to the folowing Lnderiying assumptions: 1. NYMEXStrip (Varying) Prices = Oil Pricing: WTI pric

  20. Slide 20: Glossary

    Glossary Term Meaning 1P Or "proved reserves" are those reserves that should have at least a 90% probability that the quantities actually recovered will meet or exceed the estimate 2P Or the “Sum of Proved Reserves plus Probable Reserves” are those considered as the best estimate of quantities to be

  21. Slide 21: Glossary

    Glossary Term Meaning GPI Gross perforated interval Held By Production “Held By Production” or HBP provisions extend the leasing energy company’s right to develop and operate the property beyond the initial lease term as long as it is economically producing a minimum amount of oil or gas. Initial Pl

  22. Slide 22: Glossary

    Glossary PI Held By Production Initial Placement 130 Lateral Length Mtboe MR NetLocatons NowmiP30 eakiP30 Pioneer Production Months Proppant Proppant Concentration Pvio) Rate-Time Profile Reliance sellers Share sinc Slickwater Completion Sundance or Company Volatile oil Volatile Ol Window Weilspacin

Sundance Energy Australia — Investor Presentation (August 2018) on 6ix