Elia Group SA/NV · EURONEXT:ELI
Elia Group SA/NV — Technical Presentation (May 2021)
32 slides from Elia Group SA/NV's technical presentation, May 12, 2021
Slide 1: CRM Prequalification Process
CRM Prequalification Process 12/05/2021
Slide 2: Disclaimer
Disclaimer This document constitutes a presentation for the Belgian Capacity Remuneration Mechanism (CRM) and is to be considered as an educational document facilitating understanding of all other CRM documents, which together form the official legal and operational framework. As an introduction to
Slide 3: Agenda
Agenda • Introduction to the CRM • Prequalification Process • Different Prequalification Processes • The Fast Track Prequalification Process • The Standard Prequalification Process • The Specific Prequalification Process • CRM Auction • Capacity Contract 3 CRM elements may change, are presented for
Slide 4: Introduction to the CRM
ia Introduction to the CRM Oy HE”
Slide 5: Introduction to the Capacity Remuneration Mechanism (‘CRM’)
Introduction to the Capacity Remuneration Mechanism (‘CRM’) The CRM sequence (2021 perspective): • Before The CRM is a new financial supporting mechanism of the Who & What May ‘21 Belgian Authorities to support the national Adequacy - For the capacity holder of Eligible Capacities Prequalificati
Slide 6: Introduction to the Capacity Remuneration Mechanism (‘CRM’)
Introduction to the Capacity Remuneration Mechanism (‘CRM’) Who & What • Before May ‘21 A successful Prequalification Process is required to No Contractual access to the Auction. commitment • May ‘21 – Also, for some Capacity Holders, it is a mandatory phase Prequalification process with a possibili
Slide 7: General overview
General overview The main objective of the presentation is to highlight the customer obligations and possibilities in the Capacity Remuneration Mechanism (hereafter ‘CRM’) Prequalification Process foreseen in 2021. The two first phases of 2021 are composed of the: - Prequalification Process allowing
Slide 8: Prequalification Process
ia Prequalification Process 0 FB
Slide 9: CRM Prequalification Process objectives
Who? CRM Prequalification Process objectives Prequalifica tion Auction Capacity Contract The Prequalification Process aims to Pre- The objectives of the Prequalification delivery ensure, for the Capacity Holder, its process(es) are the following Delivery compliancy with Functioning Rules requirement
Slide 10: Who is prequalifying in the CRM?
Who? Who is prequalifying in the CRM? Prequalifica tion Auction Capacity Contract Pre- delivery The CRM Candidate is: Delivery The capacity is connected at The Capacity Holder, by Optional: default: GUD In this case: TSO - level The Grid User 1) All rights and (*) obligations in the CRM are transfer
Slide 11: Prequalification Process terminology: derating factors (Y-4 2021)
Prequalification Process terminology: derating factors (Y-4 2021) All technologies are allowed to participate to the CRM (‘market- wide’) However are subject to a derating factor (*) representing the technology enhancement of the security of supply https://economie.fgov.be/sites /default/files/Files
Slide 12: Prequalification Process terminology: derating factors
Prequalification Process terminology: derating factors Here are some examples : A production unit 1: CHP of 27 MW, connected on the TSO (Elia) is under an individual schedule MW obligation (=TSO & > 25MW) (‘with daily schedule’ obligation) The Derating Factor applicable to the unit is therefore unde
Slide 13: Prequalification Process terminology: Delivery Points
Prequalification Process terminology: Delivery Points “A (future) point on an electricity grid The Delivery Point (‘DP’) is the smallest granularity of or within electrical installations of a the CMU (‘Capacity Market Unit’) which is the generic Grid User where the Service is or will unit of the CRM
Slide 14: Prequalification Process terminology: CMU
Prequalification Process terminology: CMU A CMU (‘Capacity Market Unit’) is the CRM participation unit DP1 DP2 Composition Status Constraints • Individual CMU • The CMU is Existing if it • The CMU has to be > 1MW contains solely Existing derated • = One capacity (DP) delivery points • A CMU with a D
Slide 15: Different Prequalification Processes
Different Prequalification Processes
Slide 16: CRM Prequalification Process: possibilities
CRM Prequalification Process: possibilities SCN1. Fast Track Prequalification Process No (CRM exit-door) Plan to participate to the Auction? Yes Capacity Yes / Mandatory Prequalification Maybe SCN 2. Standard / SCN3. Specific Process Prequalification Process(es) participation? Yes / Maybe No Maybe:
Slide 17: Prequalification Process: Application Form & Prequalification Files
Prequalification Process: Application Form & Prequalification Files SCN1 Fast Track SCN2 Standard Prequal. SCN3 Specific Prequal. Capacity Holder 1. Application Form (1/Actor): To be approved by ELIA - Set of information related to the Capacity Holder (or mandate counterparty) - To be provided by th
Slide 18: Fast Track Prequalification Process
Fast Track Prequalification Process
Slide 19: SCN1. Fast Track Prequalification File
SCN1. Fast Track Prequalification File In this Framework, the CRM actor has no plan to offer volume in the Auction: the operational effort is limited. One Prequalification File for each Delivery Point under a Fast Track Prequalification Process • List of required information related to a Delivery Po
Slide 20: SCN1. Fast Track Prequalification File
SCN1. Fast Track Prequalification File 20 CRM elements may change, are presented for information purposes only, and are based on Elia understanding on 10/05/2021 (see Disclaimer)
Slide 21: Standard Prequalification Process
Standard Prequalification Process
Slide 22: SCN 2. Standard Prequalification Process
SCN 2. Standard Prequalification Process In this Framework, the CRM actor plans to offer volume in the Auction with determined Delivery Points: operational effort in function of CMU The Prequalification File (1/CMU) of a Standard Prequalification Process = flow for a CMU having Delivery Points (Exis
Slide 23: Specific Prequalification Process
Specific Prequalification Process
Slide 24: SCN3. Specific Prequalification Process for VIRTUAL CMU
SCN3. Specific Prequalification Process for VIRTUAL CMU In this Framework, the CRM actor plans to offer volume in the Auction with No Delivery Points (yet): operational effort is very limited The Prequalification File (1/Actor) of a Specific Prequalification Process is to be followed for the A maxim
Slide 25: SCN 3. Specific Prequalification Process for VIRTUAL CMU
SCN 3. Specific Prequalification Process for VIRTUAL CMU 25 CRM elements may change, are presented for information purposes only, and are based on Elia understanding on 10/05/2021 (see Disclaimer)
Slide 26: CRM Auction
ia CRM Auction Oy EE
Slide 27: CRM Auction
CRM Auction The access to the Auction is granted to the CRM Prequalified Candidates CMUs The CRM actor enters one or more offers related to each prequalified CMUs to bid in the Eligible Volume as determined in the Prequalification Process Each offer consists of a volume, a chosen price and a c
Slide 28: Capacity Contract
ia Capacity Contract Oy EE
Slide 29: Capacity Contract with Elia for the Service
Who? Capacity Contract with Elia for the Service Prequalificat ion Auction Service is related to the Pre-Delivery and the Delivery Period Capacity Contract Pre-delivery Payments Transaction(s) after the month M of Delivery Period 2025 (settlement in M+1 and invoicing in M+3 (*)) Delivery (*) Settl
Slide 30: Thank you !
ia Thank you ! Oy EE
Slide 31: Back-up slides
ia Back-up slides Oy EE
Slide 32: Opt-out: a lower participation in the CRM
Opt-out: a lower participation in the CRM All technologies are allowed to participate to the CRM However are subject to a derating factor (*) In some cases, it is possible to submit a self-reduced capacity for the Auction ( ‘Opt-Out’) Opt-Out IN = volume remains in the market Opt-Out OUT = volume n