Slide 3: Highlights since April 2015 update
Highlights since April 2015 update Advanced the Solwara 1 Project Contract awarded by MAC/Shipyard to Siemens* for the supply of the entire electrical installation for the PSV** Contract awarded to the DRA Group for the vessel dewatering plant detailed design Progressed g our exploration p p
Slide 4: Current status of the Seafloor Production Tools
Current status of the Seafloor Production Tools Seafloor Production Tools (SPTs) – BC, CM and AC undergoing commissioning – Delivery expected by Q4 2015 – Wet testing planned H1 2016 Umbilical winches for the 3 SPTs – FAT completed CM – Installation of the umbilical cable currently tl underway d
Slide 5: Current status of the Riser and Lifting System
Current status of the Riser and Lifting g System y Riser and Ancillary Equipment – >50% complete – Welding of connectors commenced January 2015 – Delivery expected by Q4 2015 Subsea Slurry y and Lift Pumpp Main riser TIG welding SSLP – > 50% complete – GE Oil and GAS has advised assembly bl off
Slide 6: Current status of the Production Support Vessel
Current status of the Production Support pp Vessel Marine Assets Corporation – Vessel Owner Fujian F ji Mawei M i Shipbuilding Shi b ildi Ltd Ltd. – Building B ildi ththe P Production d ti S Supportt V Vessell (PSV) Key y vessel contracts awarded Package To Whom Comments Integrated vessel Kong
Slide 7: Exploration Programs
Exploration p Programs g Measured low cost programs Solomon Islands (SI) – Hull mounted multibeam echo sounder and plume hunting techniques – Purpose: enables first screening of our SI tenement package CCZ – Sampling, seabed photography, acoustic survey and environmental studies – Purpose: upg
Slide 8: Earth Economics Report
Earth Economics Report p Nautilus Minerals commissioned an independent Environmental and Social Benchmarking Analysis by Earth Economics* Goal: to measure the environmental and social impacts of the proposed S l Solwara 1 Project P j t in i comparison i with ith three terrestrial mines Result:
Slide 9: Key milestones to Production
Keyy milestones to Production Milestones to Production Expected date of completion Delivery of AC,BC and CM Q4 2015 Delivery of Riser and Ancillary Equipment Q4 2015 First 5% option for additional interest in the Solwara 1 Project by the State December 2015* Vessel basic design completed H2 2015 Ves
Slide 10: Mike Johnston, President and CEO
Mike Johnston President and CEO [email protected] www.nautilusminerals.com www.cares.nautilusminerals.com Month 2013 10