  1. Slide 1: Community Reference Group Meeting

    COMMUNITY REFERENCE GROUP MEETING 25 May 2015 Orica Kooragang Island

  2. Slide 2: Welcome and Introductions

    WELCOME AND INTRODUCTIONS Orica • Scott Reid • Nicole Masson • Antony Taylor • Sherree Woodroffe Apologies • Colin Rae • Pat and Geoff Hyde • Terry McCauley Guests • Rebecca Johnston, Port of Newcastle • Robert Mason, Stockton Centre 2 © Orica Limited Group

  3. Slide 3: Agenda

    AGENDA • Guest speaker – Deon van Rensberg, Office of Environment and Heritage • Acceptance of previous meeting notes • Site Status • Project Activities • Review revised CRG Terms of Reference • Key points from Community SHEC Reports in last quarter • Community update • Other business • Summarise di

  4. Slide 4: Environmental Projects

    ENVIRONMENTAL PROJECTS Deon van Rensberg Office of Environment and Heritage 4 © Orica Limited Group

  5. Slide 5: Acceptance of Previous Meeting Notes

    ACCEPTANCE OF PREVIOUS MEETING NOTES Meeting notes were sent by email on 27 March 2015 for 23 February 2015 meeting 5 © Orica Limited Group

  6. Slide 6: Site Update

    SITE UPDATE Scott Reid 6 © Orica Limited Group

  7. Slide 7: Project Activities

    PROJECT ACTIVITIES Antony Taylor 7 © Orica Limited Group

  8. Slide 8: Department of Planning Modification Application (MOD3)

    DEPARTMENT OF PLANNING MODIFICATION APPLICATION (MOD3) Orica recently applied to the NSW Department of Planning to modify the site’s Development Consent (08_029) to increase the allowable annual quantity of ammonia that can be produced at the site from 360ktpa to 385ktpa. The modification applicatio

  9. Slide 9: Project Approval Background

    PROJECT APPROVAL BACKGROUND The Department of Planning and Infrastructure approved the expansion of the site on 1 December 2009, including the uprate of the site’s ammonia plant from 850t/day to 1050t/day. The Environmental Assessment completed to support the project identified the environmental imp

  10. Slide 10: Modification Approval (MOD3) Overview

    MODIFICATION APPROVAL 3 (MOD3) OVERVIEW • The ammonia plant is approved to operate at an average production rate of 1050t/day. • The environmental impact associated with operating the ammonia plant continuously throughout the year was assessed and approved in 2009. • If the ammonia plant was to oper

  11. Slide 11: MOD3 Environmental Assessment Summary

    MOD 3 ENVIRONMENTAL ASSESSMENT SUMMARY The ammonia plant is now operating consistently at its design rate of 1050t/day. To ensure ongoing compliance, this modification application has been submitted. Three key areas were assessed to support the application: • air quality • noise • risk and hazard. •

  12. Slide 12: Ammonia Management Improvement Program Update

    AMMONIA MANAGEMENT IMPROVEMENT PROGRAM UPDATE – New pressurised ammonia storage tank at nitrates has been installed and commissioned – NAP3 was shut down in late April 2015 to enable transition to the new storage tank – NAP2/AN2 transition will occur in late May 2015 – NAP1/AN1 scheduled for late Ju

  13. Slide 13: Ammonia Management Improvement Program Update

    AMMONIA MANAGEMENT IMPROVEMENT PROGRAM UPDATE – Ammonia flares installation approved by Department of Planning and Environment on 17 December 2014 and ordered on 19 December 2014 – Nitrates and ammonia storage flares due to arrive in June 2015 and ammonia plant flare to arrive in August 2015 – Nitra

  14. Slide 14: Terms of Reference Review

    TERMS OF REFERENCE REVIEW Nicole Masson 14 © Orica Limited Group

  15. Slide 15: Community SHEC Report Summary

    COMMUNITY SHEC REPORT SUMMARY Sherree Woodroffe 15 © Orica Limited Group

  16. Slide 16: Community SHEC Report Summary

    COMMUNITY SHEC REPORT SUMMARY Injury • No injuries were recorded during March, April or May 2015. Environmental Compliance • The site discharge effluent exceeded the effluent temperature discharge limit of 43oC for three hours (0.4% of the month). Orica will continue to review the performance of the

  17. Slide 17: Community SHEC Report Summary

    COMMUNITY SHEC REPORT SUMMARY Community Complaints • One complaint was received from a Stockton resident regarding brown smoke from a stack on site. At the time of the complaint an acid plant was starting, which is likely to have been responsible for the plume. • One complaint from an industrial nei

  18. Slide 18: Community SHEC Report Summary

    COMMUNITY SHEC REPORT SUMMARY Arsenic Management Order Update • Work to finalise the design of the cap and contain system to address onsite arsenic contamination of soil and groundwater continued to be undertaken during the previous three months. • Advice from expert contract companies has been obta

  19. Slide 19: Community Update

    COMMUNITY UPDATE Nicole Masson 19 © Orica Limited Group

  20. Slide 20: Community Report

    COMMUNITY REPORT • Orica published its first Community Report summarising activities during 2014 • Report was distributed to the areas that receive the community newsletter and is available on the website (www.orica.com/kooragang) 20 © Orica Limited Group

  21. Slide 21: Community Investment Program

    COMMUNITY INVESTMENT PROGRAM Gadget Gurus • Students from Newcastle High teaching • residents of the Fern Bay Retirement Village how to use technology such as ipads and smart phones • Ongoing through school terms 1 and 2 ClimateCam • First student workshop held at the Wetlands Centre in March • Teac

  22. Slide 22: Community Investment Program

    COMMUNITY INVESTMENT PROGRAM Rush Aspire Mentoring Competition • Competition for senior students to win a day with a person of influence • Mentors include Newcastle Lord Mayor Nuatlia Nelmes, Senior Herald Journo Jason Gordon, Director PRDnationwide Mark Kentwell, radio personality Tanya Wilks and C

  23. Slide 23: Community Investment Program

    COMMUNITY INVESTMENT PROGRAM Round 1 2015 • Stockton 1st Scouts - for kayaking and water safety program • Jesmond early Education Centre – to purchase solar panels as part of centre’s environmental initiatives and educational program • Stockton Tennis Club – to reclad the club house • Merewether Sur

  24. Slide 24: HSC Chemistry Program

    HSC CHEMISTRY PROGRAM • The 2015 program is underway • 15 schools booked in primarily over May and June • Visit includes a presentation by an ammonia engineer followed by a tour of the ammonia plant and lab • KI graduates also answer questions about working in the chemical industry and career pathwa

  25. Slide 25: Institute of Hospital Engineers

    INSTITUTE OF HOSPITAL ENGINEERS Earlier this month, 19 members of the NSW and ACT chapters of the Institute of Hospital Engineers visited the Kooragang Island site as part of their annual conference. The engineers were given a presentation on Orica’s operations both locally and across the globe. The

  26. Slide 26: Harry's House Charity Shield

    HARRY’S HOUSE CHARITY SHIELD On 16 May, Orica supported the fifth annual Harry’s House Charity Shield match at Lynn Oval, Stockton. Despite the rain, the Stockton and broader community turned out to support Harry’s House and watch league and union legends taking part in a challenge between the two c

  27. Slide 27: Other Business

    OTHER BUSINESS All 27 © Orica Limited Group

  28. Slide 28: Other Business

    OTHER BUSINESS 28 © Orica Limited Group

  29. Slide 29: Summarise Meeting Points

    SUMMARISE MEETING POINTS Nicole Masson 29 © Orica Limited Group

  30. Slide 30: Action Review

    ACTION REVIEW Nicole Masson 30 © Orica Limited Group

  31. Slide 31: Actions

    ACTIONS 31 © Orica Limited Group

  32. Slide 32: Actions

    ACTIONS 32 © Orica Limited Group