Slb Limited · NYSE:SLB

Slb — SIS Global Forum 2019

28 slides from Slb's conference presentation, Sep 18, 2019

  1. Slide 1: Managing Wells with Flow Assurance in the Karachaganak Field using OLGA

    SIS GLOBAL FORUM 2019 Managing Wells with Flow Assurance in the Karachaganak Field for Sustainable Production using OLGA Monaco 18 September 2019

  2. Slide 2: Agenda

    Agenda § Introduction § Objectives § OLGA results § Conclusion and recommendation SIS Global Forum 2019 18 September 2019 2

  3. Slide 3: Introduction

    INTRODUCTION § One of the world’s largest oil & gas RUSSIA Major Pricaspian oil and gas fields condensate fields; Samara Aktobe UKRAINE Orenberg § Discovered in 1979; Uralsk Astana Aksai Karachaganak § Gross reserves – over 2.4 billion barrels of Sea of Azov Novorissiysk PRICASPIAN BASIN Atyrau Zhan

  4. Slide 4: Objectives

    OBJECTIVES § The primary objective is to present the application of transient multiphase flow simulator as an aid to predicting production system performance with solids deposition in tubing and flowline in the Karachaganak field § The secondary objective is to able to provide solutions using modell

  5. Slide 5: Wax, Asphaltenes and Hydrates

    Wax, Asphaltenes and Hydrates § Wax – mainly consists of heavy high molecular weight normal paraffins, varying amounts of cycloparaffins, isoparaffins § Asphaltenes – are complex heavy hydrocarbon molecules defined to be soluble in benzene and insoluble in low molecular weight n-alkanes § Gas Hydrat

  6. Slide 6: Well model

    INPUT DATA Deviation data Vertical wells Well completion Fluid composition Casing, Tubing, (KPO PVT Packer, Perforation database, EoS) data Wax Laboratory Production data Well analysis WAT, WDT, FWHP, Pmanifold, model HTGS, Wax content, SARA Qoil, GOR, analysis e.t.c. Reservoir Flowline profile para

  7. Slide 7: Well D08 - Wax deposition

    Well D08 - Wax deposition § Well background § Model setup § Well performance matching § Wax deposition assessment § Conclusion SIS Global Forum 2019 18 September 2019 7

  8. Slide 8: Well D08 - Model setup

    Well D08 - Wax deposition Model setup § Input data: § Pres=390 bar § Pslot=73 bar § PI=1 sm3/d/bar § GOR ~ 660 sm3/sm3 § PI and GOR were selected to match Average Oil Rate: 180 sm3/d § Uncertainties: § PVT § Where and when Deposition occurs ? SIS Global Forum 2019 18 September 2019 8

  9. Slide 9: Well D08 - Model setup

    Well D08 - Wax deposition Model setup § Fluid model was created and calibrated based with Laboratory data - WAT, WDT, rheology and wax content in Multiflash WAT line 28° C § Blue line shows the wax appearance temperature (WAT) calculated by Wilson model within Multiflash § To the right of the WAT cu

  10. Slide 10: Performance matching - Fluid temperature in flowline

    Well D08 - Wax deposition Well performance matching – Fluid temperature in flowline WAT T (fluid) < WAT ºC Ambient temperature SIS Global Forum 2019 18 September 2019 10

  11. Slide 11: Performance matching - Flowline plug

    Well D08 - Wax deposition Well performance matching – Flowline plug § Prediction of wax deposition in flowline, requires selecting a period of a plug formation for matching § Matzain, RRR, Heatanalogy models at different diffusion and shear coefficients built § RRR model gave the highest wax deposit

  12. Slide 12: Wax deposition assessment in flowline

    Well D08 - Wax deposition Wax deposition assessment in flowline Tam b -25° C Tam b -30° C Tam b -15° C Tam b -15° C Pressure Mass Tam b -25° C Tam b -5° C Tam b -30° C Tam b 0° C Time (d) Time (d) § OLGA predicts plugging of flowline at § Mass of wax deposit at different temperatures different ambie

  13. Slide 13: Wax deposition assessment in flowline

    Well D08 - Wax deposition Wax deposition assessment in flowline SIS Global Forum 2019 18 September 2019 13

  14. Slide 14: Wax deposition assessment with heater

    Well D08 - Wax deposition Wax deposition assessment with heater § Placing heater (Tout=65ºC) near 55°C 60°C 65°C wellhead has a significant impact on a temperature profile § Heating doesn’t eliminate wax deposition completely § However, reduces the amount of wax deposition in flowline § Eliminates p

  15. Slide 15: Production with Reactive vs. Proactive Intervention Strategy

    Well D08 - Wax deposition Well D08 Production with Reactive vs. Proactive Intervention Strategy Proactive Intevention Strategy and Reactive Intervention Strategy Transient Simulation Model Benefits Date Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Cummulative production fore

  16. Slide 16: Conclusion

    Well D08 - Wax deposition Conclusion § Well flowing condition of the model matched to available measured data § Wax deposition in the flow line occurs from -25°C to 0°C § OLGA reproduces flowline plugging behavior § RRR model predicted the highest wax deposit matching plugging behavior of D08 § Heat

  17. Slide 17: D20 - Hydrate

    D20 - HYDRATE § Well background § Model setup § Hydrate formation assessment § Hydrate mitigation § Conclusion SIS Global Forum 2019 18 September 2019 17

  18. Slide 18: D20 - Hydrate model setup

    D20 - HYDRATE Model setup Input data: § Pres=343 bar § Pslot=100 bar § PI=4.4 sm3/d/bar § GOR ~ 1300 sm3/sm3 SIS Global Forum 2019 18 September 2019 18

  19. Slide 19: D20 - Hydrate formation curve

    D20 - HYDRATE Model setup Hydrate formation curve No hydrate zone Hydrate zone SIS Global Forum 2019 18 September 2019 19

  20. Slide 20: D20 - Hydrate DTHYD

    D20 - HYDRATE § OLGA provides the DTHYD which is difference between the prevailing temperature at that point and the Hydrate formation temperature at the local operating conditions (DTHYD=Thyd-Tfluid) § If DTHYD is positive then Hydrate Formation is occur ºC Pipeline length SIS Global Forum 2019 18

  21. Slide 21: Hydrate formation assessment

    D20 - HYDRATE Hydrate formation assessment Fluid temperature DTHYD ºC ºC dThyd<0 dThyd>0 Tubing length Pipeline length § No hydrate inside tubing § Tfluid <Thyd 400 m away from wellhead § Tambient=0ºC § Tambient=0ºC § dThyd=Thyd-Tfluid SIS Global Forum 2019 18 September 2019 21

  22. Slide 22: Batch pumping of methanol

    D20 - HYDRATE Batch pumping of methanol § Batch injection cannot be used as a preventive measurement (MeOH flows out after 1.5-2 hrs) § Calculated optimum continuous MeOH injection rates at different ambient temperature DTHYD Fluid temperature ºC Pipeline Pipeline length SIS Global Forum 2019 18 Sep

  23. Slide 23: Continuous pumping of methanol

    D20 - HYDRATE Continuous pumping of methanol Tambient, MeOH 30 kg/hr 40 kg/hr 50 kg/hr ºC injection rate, kg/hr 0 30 0 40 0 50 ºC Pipeline Pipeline length SIS Global Forum 2019 18 September 2019 23

  24. Slide 24: D20 - Hydrate Conclusion

    D20 - HYDRATE Conclusion § Trace water in hydrocarbon (presence of gas) at the right dP and low temperature can create hydrates § Batch injection of Methanol (MeOH) is not an effective measure to mitigate hydrates irrespective of volumes pumped § Only continuous injection of methanol enables stable

  25. Slide 25: Conclusion

    CONCLUSION § OLGA as a transient multiphase flow simulator has demonstrated the versatility to predict key flow assurance issues, such as hydrate and wax deposition § OLGA enabled a better understanding of flow transients and offered a quantitative management strategy of proactive treatments with ch

  26. Slide 26: Ongoing Work and Future Studies

    ONGOING WORK AND FUTURE STUDIES Continuous injection of solvent/inhibitor to remove wax deposition § Laboratory analysis § Compositional analysis, § Determination WAT at different concentration of solvent in crude oil, § Flow loop testing § OLGA model § Lab results to serve as input into further OLG

  27. Slide 27: Q&A

    Q&A SIS Global Forum 2019 18 September 2019 27

  28. Slide 28: Thank You

    THANK YOU SIS Global Forum 2019 18 September 2019 28

SLB — SIS Global Forum 2019 on 6ix