Slide 1: Automating and Improving Revit Model Quality
Automating and Improving Revit Model Quality with Autodesk Validation Tool Tineshwaran Sellathoroe Head of BIM – Data Center, Exyte @LinkedIn Martin Langolf Principal Technical Account Specialist, Autodesk @LinkedIn © 2024 Autodesk, Inc. All rights reserved.
Slide 2: Speakers
Speakers Hello, I’m Tinesh. I’m the Head of BIM for Data Centers in South East Asia at Exyte. I cover Singapore, Malaysia, Taiwan & Hong Kong. I have over 10 years of experience in the AEC industry, based in Kuala Lumpur, Malaysia. Currently, I lead BIM standardization for high-profile projects, inc
Slide 3: Speakers
Speakers Hello, I’m Martin Langolf, a Technical Account Specialist based in Munich, Germany. I have over 5 years of experience in the architectural and engineering environment, and I’ve successfully completed a variety of projects throughout Northern Europe, both commercial and private. My expertise
Slide 4: Agenda
Agenda Exyte & Project Introduction Issues & Solution Autodesk Validation Tool Checksets & Custom Solution at Exyte Result & Summary Autodesk Confidential & Proprietary Information - Please do not post, copy or distribute without authorization.
Slide 5: Our Company
Our Company © 2024 Autodesk, Inc. All rights reserved.
Slide 6: We Create a Better Future
WE CREATE A BETTER FUTURE by delivering high-tech facilities to enable our clients to provide innovative products and services that enhance the quality of modern life. © 2024 Autodesk, Inc. All rights reserved.
Slide 7: At a glance: Experts for high-tech facilities
At a glance: Experts for high-tech facilities worldwide History of Sales of 100+ € 7.4bn (2022) years Around Client-centric operation in 9,704 20+ countries employees (2023) © 2024 Autodesk, Inc. All rights reserved.
Slide 8: German Engineering Heritage > 100+ years
German Engineering Heritage > 100+ years M+W Group is a leading supplier M+W's semiconductor facility in Set up of new segments, such as In 2018, core activities of M+W Group of HVAC systems, a pioneer in Taiwan marks a milestone for Pharmaceutical & Health, Photovoltaics, have been carved-out and r
Slide 9: Exyte Worldwide
Exyte Worldwide Your Local Partner with Global Expertise Northern Europe & Israel (NEI) Ireland U.K. Denmark Finland Netherlands Israel Northeast Asia (NEA) China Taiwan Continental Europe (COE) Germany Austria USA Switzerland Lead Office - Dallas, TX Italy Durham, NC Belgium Albany, NY France Eng.
Slide 10: Have you been in this situation?
Have you been in this situation? ‘Smart’ Client? – Large number of stringent models and revisions requirement? Numerous Frequent quality issue stakeholders? High with models? number of trade partners involved? © 2024 Autodesk, Inc. All rights reserved.
Slide 11: Project 'Bird'
Project ‘Bird’ © 2024 Autodesk, Inc. All rights reserved.
Slide 12: Project Bird
Project Bird High-tech facility construction First overseas facility for advanced 3D chip packaging. One of the largest chip packaging facility in the world, largest in Malaysia Project value over $USD 7 billion / MYR 30 billion Over 150 trade partners at peak in the project Over 700++ m
Slide 13: Issues
Issues © 2024 Autodesk, Inc. All rights reserved.
Slide 14: Solution
Solution © 2024 Autodesk, Inc. All rights reserved.
Slide 15: Autodesk Validation Tool
Autodesk Validation Tool • Speed up the model error resolution process All validated models and errors can be • Pre-configured and visualized in reports and dashboards to customizable validation checks help identify errors early and speed up the Analyze models for best practices resolution process.
Slide 16: Why Did Implement AVT?
WHY DID IMPLEMENT AVT?
Slide 17: The Why
The Why Repeatable and fully automated workflow in the cloud Scalable Quality control Monitor project metrics Trends over time (historic data) Increase model performance Saving time and money © 2024 Autodesk, Inc. All rights reserved.
Slide 18: Exyte Specific Requirements
Exyte Specific Requirements File naming standard Defined location Project metrics and parameters Large number of subcontractors to monitor © 2024 Autodesk, Inc. All rights reserved.
Slide 19: What Exyte Needed?
What Exyte Needed? Customized to Fixed Frequency Needs Model Reviews Checksets Automated Checks How to Customize? AUTODESK Over 700 models VALIDATION TOOL Centralized Technical Support Reports Autodesk Live Dashboard Consultation Power BI © 2024 Autodesk, Inc. All rights reserved.
Slide 20: AVT in Practice!
AVT in Practice! © 2024 Autodesk, Inc. All rights reserved.
Slide 21: AVT in Practice!
AVT in Practice! Model Checking in BIM 360 Docs / Autodesk Docs No file downloading; Not necessary to have Revit Schedule options (now, later, recurring, on-publish) Exports to data to Excel / HTML or directly to BIM 360 Docs / Autodesk Docs Check sets are interchangeable with the Model Chec
Slide 22: AVT in Practice!
AVT in Practice! Automatically checks Revit models against a set of pre-determined data standards Dozens of pre-built and tested checksets are already included for use or customization (Revit Best Practices, Model Health with Power BI Dashboard, General Model Fidelity, client-specific deliverabl
Slide 23: AVT in Practice!
AVT in Practice! • Export a .AVT file (JSON report) • In the Model Checker, you an open an AVT • These reports can be sent to anyone on file to view the report sent the team working on these models • You can zoom to the issues in Revit that • This way, one person can share reports are listed in an A
Slide 24: AVT in Practice!
AVT in Practice! Selecting a reference element and creating a custom XML checkset in AIT © 2024 Autodesk, Inc. All rights reserved.
Slide 25: AVT in Practice!
AVT in Practice! Reviewing saved reports HTML XLSX © 2024 Autodesk, Inc. All rights reserved.
Slide 26: Autodesk Validation Tool
Autodesk Validation Tool Standard Output Standard (built-in) model check provides a range of valuable information to determine the health and performance of models © 2024 Autodesk, Inc. All rights reserved.
Slide 27: Checksets
Checksets © 2024 Autodesk, Inc. All rights reserved.
Slide 28: Preset Checksets
Preset Checksets © 2024 Autodesk, Inc. All rights reserved.
Slide 29: Revit Best Practices Checkset
Revit Best Practices Checkset © 2024 Autodesk, Inc. All rights reserved.
Slide 30: Creating Custom Checksets
Creating Custom Checksets Using the Wizard © 2024 Autodesk, Inc. All rights reserved.
Slide 31: Creating Custom Checksets
Creating Custom Checksets Using the Advanced Check Builder The Advanced Check Builder allows you to work with Operator’s, Criteria’s, Properties and Conditions to create your check rule. In this example we are validating if a custom 1 parameter e.g. “Catalogue_ItemNr” has a value and that the value
Slide 32: Solution Integration
Solution Integration © 2024 Autodesk, Inc. All rights reserved.
Slide 33: Custom Enterprise Solution for Exyte
Custom Enterprise Solution for Exyte Quality gate Project documentation and guidelines Team member 1 Revit model CDE CUSTOMER DOMAIN CONSTRUCTION ACC Connect recipe Revit Maintaining the Team member 2 schedule model AVT Webhook Access to the latest Revit 3D geometry Team member 3 model Power BI Up-t
Slide 34: Example custom configuration
Example custom configuration Azure environment with SQL database was used for data processing Incoming Excel sheets are stored in a Storage Account Azure Data Studio was used to move this data into SQL Tables Data is presented and published via PowerBI © 2024 Autodesk, Inc. All rights reserved
Slide 35: Example custom configuration
Example custom configuration Azure Data Studio Overview Datasets o Define all Datasets that are needed o Many formats and Types available © 2024 Autodesk, Inc. All rights reserved.
Slide 36: Example custom configuration
Example custom configuration Azure Data Studio Overview Dataflows o Data Manipulation (select, join, split, aggregate) o Modify Schemas © 2024 Autodesk, Inc. All rights reserved.
Slide 37: Example custom configuration
Example custom configuration Azure Data Studio Overview Pipelines o Use Datasets and Dataflows to create a process o Many Actions available o Loops possible o Decisions possible © 2024 Autodesk, Inc. All rights reserved.
Slide 38: Example custom configuration
Example custom configuration Azure Data Studio Overview Trigger o Trigger Pipelines based on Events, Time, Storage Changes o Or when developing just Trigger the Pipeline now © 2024 Autodesk, Inc. All rights reserved.
Slide 39: Example custom configuration
Example custom configuration Azure Data Studio Overview Monitoring o See what's happening when running the pipeline o Easy Analysis if Errors happen © 2024 Autodesk, Inc. All rights reserved.
Slide 40: Dashboard: Result Dashboard
Dashboard Result Dashboard © 2024 Autodesk, Inc. All rights reserved.
Slide 41: Effort Result
Effort Result © 2024 Autodesk, Inc. All rights reserved.
Slide 42: Dashboard: Weekly Results by Supplier
Dashboard Result Dashboard Weekly Results by Supplier © 2024 Autodesk, Inc. All rights reserved.
Slide 43: Dashboard: Weekly Trend by Supplier
Dashboard Result Dashboard Weekly Trend by Supplier © 2024 Autodesk, Inc. All rights reserved.
Slide 44: Dashboard: Detail View
Dashboard Result Dashboard Detail View © 2024 Autodesk, Inc. All rights reserved.
Slide 45: ACC Insight + Power BI Dashboard
ACC Insight + Power BI Dashboard Embeded Dashboard into ACC project page © 2024 Autodesk, Inc. All rights reserved.
Slide 46: What Now? – Transforming Our Workflow
What Now? – Transforming Our Workflow Proactive Issue Resolution • Early Detection Improved Collaboration • Empowered Teams • Streamlined Enhanced Decision- Communication Making • Consistent Standards • Real-time Insights • Data-Driven Approach Scalability and Adaptability • Future-Proofing Our Proc
Slide 47: Models are much improved! Cleaner models for our FM platform
Models are much improved! No unnecessary data. Cleaner models which we can use in our FM platform Project Bird Client © 2024 Autodesk, Inc. All rights reserved.
Slide 48: Solution Summary
Solution Summary AVT / MCX – Manual Report – View online / Automated or Preset Checksets / Model Checker / Scheduled Excel 01 02 03 01 02 03 04 05 AVT / MCX – Manual Preset / Custom Report – View online Power BI Customized Dashboard – / Automated or Checksets / Model Checker / Visualization – ACC Co
Slide 49: Result
Result Challenge Solution Result • Used AVT’s Basic Functions to QC models • Model State Detection • Subpar Revit Models • Discovery & Coaching Sessions with Autodesk • Custom Parameter Validation • Time-Consuming Re-Validation • Automation of Validation Process • Result Visualization • Lack of Para
Slide 50: Future of AVT in Exyte
Future of AVT in Exyte All upcoming projects in the Southeast Asia region will adopt AVT as a standard, with plans for a subsequent global rollout. The AVT system is designed to be scalable, allowing seamless implementation across multiple projects simultaneously. A standardized, well-document