Beacon Minerals Limited · ASX:BCN
Beacon Minerals — Investor Presentation (August 2007)
21 slides from Beacon Minerals's investor presentation, August 2007
Slide 1: Company Update
MINERACS LTD Company Update August 2007
Slide 2: Disclaimer
Disclaimer This This presentation presentation includes includes predictive predictive information information that that is is intended intend ed to intended to be be made made as as ““forward-looking” forward- forward-looking” looking” within within the the safe safe harbor harbor protections prote
Slide 3: Company Overview
Company Overview ASX Codes: BCN, BCNO Shares on Issue : 34,200,000 Escrowed: 10,800,000 Listed Options: 16,600,000 Unlisted Options: 6,000,000 Market Capital (32c): $11,200,000 (Undiluted) $18,700,000 (Fully Diluted) Cash at Hand: $2,800,000 Share Price Range: 17.5 - 67.5c
Slide 4: Management Team
Management Team Lyle Thorne – Managing Director (age 37) Geologist, 16 years experience Paul Lloyd – Executive Director (age 43) Chartered Accountant, 20 years exp. Director - Target Energy (TEX) Matthew Egan – Non-Executive Director (age 42) 20 years Industry Experience, Owner, ‘Egan Drilling Servi
Slide 5: Beacon Projects
Beacon Projects Greenvale Project Copper-gold-moly Gold Zinc Barlee Project Gold Nickel Uranium Pioneer Project Gold
Slide 6: Greenvale Project Area
Greenvale Project Greenvale Greenvale Project Project Area Area
Slide 7: Greenvale Project
Greenvale Project • Over 400 sq km of tenure, either 100% or 80% (earning- (earning-Lucky Creek JV) • Close to existing mines and infrastructure • Minimal systematic exploration • Three major targets; Cu- Cu-Au- Au-Mo- Mo-Ag (porphyry) COCKIE PROSPECT Au- Au-Zn- Zn-Cu (Balcooma- (Balcooma-type VMS)
Slide 8: Cockie Prospect: Porphyry Cu-Au-Ag-Mo intercepts
Greenvale Project - Cockie Prospect (BCN 100%) • Copper-Gold-Silver-Molybdenum, Porphyry–related • Mineralisation at surface – oxide potential, Cockie East, Cockie West • Large exploration target – Cockie Trend – look for more mineralisation Significant shallow RC intercepts (BCN & Historical) Cocki
Slide 9: Greenvale Project - Cockie Prospect (BCN 100%)
Greenvale Project - Cockie Prospect (BCN 100%)
Slide 10: Greenvale Project - Cockie Prospect (BCN 100%)
Greenvale Project - Cockie Prospect (BCN 100%)
Slide 11: Steam Engine Gold Prospect
Greenvale Project Steam Engine Gold Prospect LUCKY CREEK JV • BCN Drill Results 6m @ 5.5g/t (inc. 2m @ 15.6g/t) 12m @ 3.5 g/t 5m @ 4.5g/t 5m @ 4.3 g/t • Over 5 km of old workings +/- soil anomalies • Gold mineralisation at surface • Priority drill targets • Define shallow resources
Slide 12: Greenvale Project - Steam Engine Gold Prospect
Greenvale Project - Steam Engine Gold Prospect
Slide 13: Greenvale Project Proposed Exploration Drilling
Greenvale Project Proposed Exploration 59g/t Ag rock Drilling (Cu-Au-Ag-Mo) • Cockie East & West 16m @ 4.5% Zn, 1.1g/t Au, 0.5% Cu, 13g/t Ag Define shallow mineralisation (inc. 5m @ 8.5% Zn) Historical Drilling • Cockie Trend Explore for more mineralisation (Au) • Steam Engine Define resource potent
Slide 14: Barlee Project Gold
Barlee Project Gold • Well endowed mineralised belt • Over 340 km2 of Greenstone is under-explored • Numerous prospects/targets • New exploration model • Recent drilling returned significant results • Shallow resource potential • Prospective for Au, Ni & U Sources: Bulcina/Lord Nelso/Henry – Troy Re
Slide 15: Barlee Project: Gold, Uranium, Nickel
Barlee Project GOLD • BCN - ~8000m of Aircore • Numerous prospects/targets • New exploration model • Recent drilling returned significant results URANIUM • Large 16 km long calcrete paleo- Halleys East drainage with several U anomalies, untested NICKEL • Ultramafics - untested
Slide 16: Beacon Exploration Model
BEACON EXPLORATION MODEL SW NE
Slide 17: Barlee Gold Project New Exploration Model
Barlee Gold Project New exploration model BCN RESULTS • 28m @ 4.1 g/t (inc. 8m @ 10.6g/t) • 32m @ 3.7 g/t (inc. 8m @ 7.8 g/t*) g/t*) • 12m @ 2.6 g/t & 4m @ 13.3 g/t • 4m @ 9.3 g/t • 12m @ 2.1 g/t • 8m @ 2.7 g/t inc. 4m @ 5g/t • 8m @ 2.5 g/t Exploration to be accelerated Further Drilling Planned *- H
Slide 18: Barlee Project - Halleys East Prospect
ome | 703500 mE - w £ 3 3 72 3 as 8 78 r = ‘ S | 1 J J Mondie Shear Zone 12/15 inc. 1/12.2 6737500 mN 6737500 mN + BEACON MINERALS LTD ° © : : BARLEE PROJECT- HALLEYS EAST PROSPECT Beacon Aircore (July 07) RES! AWAITED Result available Beacon Aircore (July 07) Results awaited @,/e @ ® ®@ Beacon Airc
Slide 19: Barlee Project Halleys East Cross Section
703125mE BRB145 BRB144 BRB143 BRB141 BRB142 6737525mN 4 12m @1.5 git Au ~ 7 “ 7 3tm 1 ‘y | NX k me, \ 16m @ 0.4 git Au Sara \ “SON Shear \ YY” eee es Se emcee 53m naib Base of Oxidation = Laterite (transported) \ “Sy, Mineralized Intercept(+0.2gt) [/_ | Porphyry OPEN OPEN “~~ Zone of Mineralization
Slide 20: Barlee Project Proposed Exploration
Barlee Project Proposed Exploration • Accelerate exploration • Aircore drilling to outline more potential RC targets • Initial RC at advanced prospects to outline resource potential • Test regional targets • Ascertain Potential for Ni and U
Slide 21: Beacon Minerals Ltd Contact
BEACON MINERALS LTD Level 2, 46 Ord St West Perth, WA, 6005. Ph: 08-9476 9200 Fax: 08-9476 9099 Lyle Thorne (Managing Director) Paul Lloyd (Chairman) website: www.beaconminerals.com
Beacon Minerals — Investor Presentation (August 2007) on 6ix