GCM Corp., Ltd. · ASX:GCM
GCM — TopTung — Shareholder Meeting (October 2018)
25 slides from GCM's shareholder meeting presentation, Oct 3, 2018
Slide 1: AGM Presentation 3 October 2018
AGM PRESENTATION 3 OCTOBER 2018 Class 1 Nickel-Copper Sulphides + Co + PGE Quebec, Canada & Torrington Topaz -Tungsten Project NSW
Slide 2: Disclaimer
Disclaimer Disclaimer: TopTung Limited has taken all reasonable care in compiling and producing the information contained on this presentation. The Company will not be responsible for any loss or damage arising from the use of the information contained in this presentation. The contents of this pres
Slide 3: Corporate Team
Corporate Team Dr Leon Pretorius – Executive Chairman Martin Kavanagh – Non Executive Director Charles Thomas – Non Executive Director Marnus Bothma* – Geologist Suzanne Yeates – Company Secretary / CFO GTT Ventures – Corporate Advisors *Marnus will join the TopTung Board as a non execut
Slide 4: Investment Overview
Investment Overview TopTung Ltd Corporate Overview Cash at Bank ~$4,250,000 Dr Leon Pretorius (Chairman) - 6.76% GTT Global - 5.52% Hustler Investments - 4.83% Major and Significant Shareholders Southern Reaches - 4.61% Kitara Investments Pty Ltd - 2.28% Steven Scott Day - 2.28% Mounts Bay Investmen
Slide 5: Zeus Minerals - Canada Regional Location Map
ZEUS MINERALS - CANADA Regional Location Map
Slide 6: Project Locality Map
Project Locality Map Bi Metallic Mineral Deposit Gre —_ | — Ni CusPGEssco = AU. » ll _ & y ke =. a. Cut Nis PGES
Slide 7: Zeus Project: 2018 Alotta NQ Diamond Drilling
Zeus Project 2018 Alotta NQ Diamond Drilling (Subject to access constraints) The 7-hole programme will comprise: • Three twin holes: - Historical Hole BT-01-32 with intercepts of 13.10m @ 1.59% Ni, 1.03% Cu, 0.22% Co from 54.25m; and 29.30m @ 1.87% Ni, 2.16% Cu, 0.10% Co from 73.0m. - Historical Hol
Slide 8: Zeus Project: Drilling Logistics and Objectives
Zeus Project 2018 Alotta NQ Diamond Drilling (Subject to access constraints) Drilling Logistics: • Drilling to commence ~4th October, 2018 • 24/7 drilling ~ 10 days • Core logging, cutting and assaying ~6 - 8 weeks Drilling Objectives: • Confirm historical intercepts through twinning holes. • Extend
Slide 9: Zeus Projects Prospect Localities
Zeus Projects Prospect Localities
Slide 10: Alotta Project Planned Drill Hole Locations
Alotta Project Planned Drill Hole Locations
Slide 11: Alotta Project 2018 Drilling Programme
Alotta Project 2018 Alotta NQ Diamond Drilling Programme
Slide 12: Alotta - Delphi - Zullo 3D Inversion
Alotta - Delphi - Zullo 3D Inversion
Slide 13: Project Locality Belleterre-Angliers Greenstone Belt
Project Locality Belleterre – Angliers Greenstone Belt (BAGB)
Slide 14: Zeus Project 2018-2019 Program
Zeus Project 2018 - 2019 Program Baby Project Area ORIX / TTW commence review of historical work ~ 70 core holes; CORE Geophysics to re- process recent aeromagnetic survey data; evaluate historic downhole and surface EM-survey data; consider additional downhole and surface EM surveys. Objective –
Slide 15: Lorraine Project (Lac Des Bois)
Lorraine Project (Lac Des Bois) Outcropping Gabbro – Blue/Grey TMI 1VD Aeromagnetics Lorraine Ni-Cu Mine • Historically produced 14.28 Mlbs of Copper and 6.34 Mlbs of Nickel. • Over AUD $100,000,000 of metal in less than 24months, from the 600kt ore.
Slide 16: Zeus Prospectivity - Upside
ZEUS PROSPECTIVITY - UPSIDE Belleterre – Angliers Greenstone Belt (BAGB) • BAGB – District wide Nickel-Copper Sulphide mineralisation associated with gabbroic bodies within a dominantly mafic volcanic terrane. • The gabbros have a magnetic signature which may help with geophysical target delineation
Slide 17: Zeus Prospectivity - Upside (Gold Wildcard)
ZEUS PROSPECTIVITY - UPSIDE Belleterre – Angliers Greenstone Belt (BAGB) The Company’s geological consultants ORIX Geoscience will compile a GIS database from historic reports acquired by Zeus. Key to this will be first time digitising of historic drillhole geology and mineralisation producing 2D
Slide 18: Torrington Topaz-Tungsten Project, NSW
Topaz-Tungsten TORRINGTON TOPAZ – TUNGSTEN PROJECT, NSW
Slide 19: Project Location
PROJECT LOCATION • Tenterfield – nearest large town (40 min by road) • WORDS • Excellent road • WORDS infrastructure • WORDS • 22 kV Powerline and • WORDS power available on site • 353km to the Port of Brisbane • Local earth moving and mining contractors • Numerous small scale mines and a local mini
Slide 20: Project History and Overview
PROJECT HISTORY AND OVERVIEW • >100 years small to medium size tungsten mining activity within the area including BHP from 1911 to 1919 • Contained largest single wolfram (WO3) mass (12.5t) recorded in Australia • Pacific Copper tungsten and topaz production from mid 1970’s to early 1980’s • 2,540 t
Slide 21: Distribution of Silexite and Tungsten Mineralisation
DISTRIBUTION OF SILEXITE AND TUNGSTEN MINERALISATION
Slide 22: Wild Kate Silexite Body
WILD KATE SILEXITE BODY SCHEMATIC GEOLOGY SECTIONS WILD KATE PROSPECT SILEXITE BODY OUTLINE
Slide 23: Topaz Research Projects
TOPAZ RESEARCH PROJECTS • Federally co-funded 3-year Australian Research Council (ARC) project at UNSW into single oriented mullite fibre produced from topaz (left below) • Recent results include the production of pure aluminium platelets (right below) • Refer ASX 25 July 2018 • Bulk potential marke
Slide 24: Contact
Contact Dr Leon Pretorius - 0419 702 616 [email protected] Martin Kavanagh – 0419 429 974 [email protected]
Slide 25: Competent Persons
Competent Persons Competent Person Statement Information in this ASX announcement that relates to Exploration Results is based on information compiled by Dr Leon Pretorius. Dr Pretorius is the Executive Chairman of TopTung Ltd and is a Fellow of the Australasian Institute of Mining and Metallurgy (F