Newfield Exploration Company

Newfield Exploration — FY2017 Earnings Presentation

49 slides from Newfield Exploration's earnings presentation, Feb 23, 2018

  1. Slide 1: Forward Looking Statements and Related Matters

    Forward Looking Statements and Related Matters This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. The words “may,” “forecast,” “outlook,” “could,” “budg

  2. Slide 2: Forward Looking Statements and Related Matters (continued)

    Forward Looking Statements and Related Matters (continued) 3 This presentation has been prepared by Newfield and includes market data and other statistical information from sources believed by Newfield to be reliable, including independent industry publications, government publications or other publ

  3. Slide 3: 3YR Plan Objectives – Our Focus is Clear

    3YR Plan Objectives – Our Focus is Clear NFX Strong Margins, Returns and Debt Adjusted Growth2 Improved well IRR (>50% pre-tax) across development regions Reduced LOE per boe by ~20% by end of plan 20-30% CAGR in est. cash flow per debt adjusted share Strong Balance Sheet and Capital Structure Maint

  4. Slide 4: Strong 3YR Plan Driven By High-Graded STACK Development Drilling

    Strong 3YR Plan Driven By High-Graded STACK Development Drilling Investing: ~$4.2 billion of capital investments thru 2020E1 ~90% allocated to D&C (drill and complete) investments > 400 operated STACK wells placed on production during 3YR Plan Growing (Estimated CAGR): 14-18% in domestic production

  5. Slide 5: Strong Domestic Production Profile and Debt Adjusted Growth

    Strong Domestic Production Profile and Debt Adjusted Growth Sustained growth within cash flow Projecting >16 MMBOE increase in production relative to original 3YR Plan 14-18% Annual Production Growth (10-15% Annual Growth in Prior Plan) 15-20% Annualized Production per Debt Adjusted Share Growth 6 1

  6. Slide 6: Anadarko Basin Growth Driven By High-Graded Drilling Program

    Anadarko Basin Growth Driven By High-Graded Drilling Program 20-25% Anadarko Basin Production Growth Per Year 7 Nearly 550 operated wells will be placed on production during 3YR Plan Potential to grow production 75-100 MBOEPD over next three years Oil volume annualized growth estimated at 25-30% thr

  7. Slide 7: STACK To Drive Anadarko Basin Production Growth

    STACK To Drive Anadarko Basin Production Growth 8 51 48 65-70 51-58 55-65 90-100 120-135 55-65 STACK Annualized Production Growth Estimated to be >30% STACK Oil Annualized Growth Estimated to be 30-40% STACK now accounts for >50% of total Anadarko Basin production Anadarko Basin growth driven by STA

  8. Slide 8: Strong Cash Flow Profile and Debt Adjusted Growth

    Strong Cash Flow Profile and Debt Adjusted Growth $300-$1,000 mm Cumulative Free Cash Generating Potential 20-30% Estimated Annualized Growth In Cash Flow per Debt Adjusted Share FCF FCF 9 $1,155 $1,300 $1,400 $1,500 ($2,000) ($1,500) ($1,000) ($500) $0 $500 $1,000 $1,500 $2,000 $2,500 2017A 2018E 2

  9. Slide 9: Improving Debt Profile

    Net debt / adj EBITDA5 Long-Term Debt Maturities $ millions No maturities until 1/30/2022 Leverage Decreases Throughout 3YR Plan Expect to lower net debt to adjusted EBITDA throughout 3YR Plan Maintain significant liquidity throughout 3YR Plan Optionality to address long-term debt maturities No matu

  10. Slide 10: Amending 2018 Annual Incentive Pay Metrics

    11 Amending 2018 Annual Incentive Pay Metrics 2017 AIP Metrics 2018 AIP Metrics Weight Definition Weight Definition 15% Domestic Production 12.5% Debt Adjusted Production Growth Per Diluted Share 15% Domestic 1P Reserve Replacement 12.5% Proved Reserve Replacement Ratio 15% Domestic Proved Developed

  11. Slide 11: 2018 Capital Investment Program

    2018 Capital Investment Program Anadarko Basin D&C Capital 140-160 operated wells ~80% of D&C 20-25% estimated production growth YOY 25-30% estimated oil growth YOY Rockies: Williston Basin 20-25 operated wells $90-$100 million free cash flow (2018E) 10% estimated oil growth YOY Uinta – Central Basi

  12. Slide 12: 2018 Capital Investment Program

    2018 Capital Investment Program Anadarko Basin D&C Capital = 140-160 operated wells ~$920 MM = ~80% of D&C = 20-25% estimated production growth YOY m= 25-30% estimated oil growth YOY Rockies: ~$245 MM Williston Basin = 20-25 operated wells = $90-$100 million free cash flow (2018E) $1.3 Billion = 10%

  13. Slide 13: Anadarko Basin is a World-Class Resource Play

    Anadarko Basin is a World-Class Resource Play STACK infill pilots drilled to date (78 wells) provide high confidence in 3YR Plan Early encouraging results from 12-well Velta June pilot and Jackson/Florene Black Oil pilot SCORE program expands total net effective reservoir acres in Anadarko Basin to

  14. Slide 14: Cumulative Infill Test Results Provide Confidence in 3YR Plan

    Cumulative Infill Test Results Provide Confidence in 3YR Plan Existing infill developments 78 producing infill wells completed across acreage position Meramec infill density tested from three wells in a single layer to 12 wells in a DSU Infill production results to date in-line with 3YR Plan type cu

  15. Slide 15: Well Density Tests Helping Unlock Upside (Velta June)

    Well Density Tests Helping Unlock Upside (Velta June) 16 Most “technically comprehensive” spacing pilot Key learnings focused on completion cluster efficiency, intra-well communication, cost/benefit analysis of components of well design, fracture geometry and flowback practices Peak pad production >

  16. Slide 16: Eastern Infill Test Pushes Extent of Play Across NFX Position

    Eastern Infill Test Pushes Extent of Play Across NFX Position Jackson / Florene 4- well test Lateral Length: 10,146’ AVG. IP120: 996 BOEPD (77% Oil) Eastern STACK Jackson / Florene test Four-well single-layer test in Meramec Estimated ~90% IRR at $55 oil and $2.85 gas Spacing test with original HBP

  17. Slide 17: Significant Activity Progressing SCORE Program

    CHARLES 1H-19 (MRMC) GPI: 4,892’ IP30: 931 BOEPD (49% Oil) Significant Activity Progressing SCORE Program 18 NFX operated wells OBO wells Industry wells CURRY 21X 1VH (WDFD) GPI: 10,460’ IP30: 1,730 BOEPD (85% Oil) LYNDA 26-23-1XH (SCMR) GPI: 7,605’ IP30: 3,281 BOEPD (23% Oil) PUDGE 1-7-6XH (SCMR) G

  18. Slide 18: Newfield's Expansive Anadarko Basin Resource & Inventory

    3YR PLAN ADDITIONAL RISKED8 ADDITIONAL UNRISKED8 TOTAL Gross Locations 700-800 >5,900 >7,850 >14,500 Newfield’s Expansive Anadarko Basin Resource & Inventory STACK Age Formation Depth Thickness Acreage Penn Oswego Limestone 6,500’-8,500’ 75’-125’ ~45,000 Atoka / Morrow Mississippian Chester (Seal) M

  19. Slide 19: Driving STACK Efficiencies Through Operational Leadership

    Driving STACK Efficiencies Through Operational Leadership NFX has a proven track record of improving margins by lowering costs and driving operational efficiencies 20 Completion Cost ($/bbl)* Drilling Cost ($/GPI) Sample includes 49 wells, data pulled from actual AFEs with NFX WI. Peers include CHK,

  20. Slide 20: Company Leveraging Strong Williston Basin Performance

    Company Leveraging Strong Williston Basin Performance Utilized learnings from on-anticline activity over the last 200+ wells drilled to show expanded type curve and further push development to off-anticline infills Over 200 additional future locations to develop (drilling >65 wells in the 3YR Plan)

  21. Slide 21: Uinta Basin Provides Deep Inventory of Stacked Horizons

    Uinta Basin Provides Deep Inventory of Stacked Horizons Targeted drilling program in 2018 to HBP and further delineate additional horizons ~4,000 feet of oil-saturated reservoir rock across entirety of Newfield’s >225,000 acres Recent wells demonstrate prolific nature of stacked horizons throughout

  22. Slide 22: Strong Recent Horizontal Uinta Basin Results

    Strong Recent Horizontal Uinta Basin Results Knoll 7H (UB) GPI: 4,430’ IP30: 1,088 BOEPD (92% Oil) Ute Tribal 4-23-3-1W-H1(WST) GPI: ~5,000’ IP30: 1,730 BOEPD Hicken Tribal 15-9-4-3-1E-H1 (U-CP) GPI: ~10,000 IP30: 1,010 BOEPD Powvitch (U-CP) GPI: 8,766’ IP30: 1,313 BOEPD (91% Oil) BB 32-144H-22 (WST

  23. Slide 23: Strong Recent Horizontal Uinta Basin Results

    Strong Recent Horizontal Uinta Basin Results Dallas 2-Well Pad (UB) 186 32-144H-21 (UB) GPi:9,4ay’ GPI:3,47" Avg. 1P30: 1,399 BOEPD (91% 011) | |1P30: 1,252 BOEPDI (91% O1L) P9832" 1P30: 1,369 BOEPD1 (90% OIL) ‘BB 34-34EWH-23 (UB). ‘6P:~10,000 j 1P30: 1,253 BOEPD (89% OIL) MURRAY 3-WELL PAD (UB & WS

  24. Slide 24: 2017 Highlights

    2017 Highlights Operational Beat domestic production guidance by delivering 10% growth vs. original guidance of 3-5% Grew proved reserves 33% to ~680 MMBOE 59% proved developed / 58% liquids Further advanced STACK development learnings Consistent infill results from 78 wells Improved well results th

  25. Slide 25: Operational Performance Drives Strong Reserve Growth

    Proved reserves up 33% YOY ~400% proved reserve replacement ratio 58% of proved reserves are liquids 59% of proved reserves are proved developed Anadarko Basin proved reserves up 44% and represent 70% of total company reserves ~60% of Anadarko Basin proved reserves are liquids 680 MMBOE >2.5x Reserv

  26. Slide 26: 4Q17 Domestic Results

    4Q17 Domestic Results 4Q DOMESTIC RESULTS 3Q ACTUAL 4Q GUIDANCE 4Q ACTUAL PRODUCTION Oil (mbopd) 65.5 63.2 - 67.9 67.1 NGL (mbopd) 35.6 35.6 - 38.3 36.3 Gas (mmcfpd) 347.5 379.2 - 407.4 398.3 Total (mboepd) 159.1 162.0 - 174.0 169.8 EXPENSES ($/BOE) LOE $3.35 $3.20 $3.18 Transportation* $5.47 $5.58

  27. Slide 27: 4Q17 Basin Results

    4Q17 Basin Results 4Q BASIN RESULTS ANADARKO WILLISTON UINTA ARKOMA PRODUCTION Oil (mbopd) 39.2 13.3 14.6 0.0 NGL (mbopd) 32.4 3.3 0.4 0.2 Gas (mmcfpd) 274.3 22.0 19.4 80.7 Total (mboepd) 117.3 20.3 18.2 13.7 EXPENSES ($/BOE) LOE $1.58 $3.91 $10.89 $3.11 Transportation* $3.88 $5.68 $0.35 $4.20 Produ

  28. Slide 28: 2017 Domestic Results

    NOTE: Pro forma 2016 adjusted for the completed sale of Eagle Ford and S. Texas assets. * 2016A transportation fees include $53 million and $16 million of firm gas transportation in the Arkoma Basin and shortfall fees in the Uinta Basin, respectively. 2017A transportation fees include $54 million an

  29. Slide 29: 2017 Basin Results

    2017 Basin Results 2017 BASIN RESULTS ANADARKO WILLISTON UINTA ARKOMA PRODUCTION Oil (mbopd) 33.8 13.3 13.9 0.1 NGL (mbopd) 27.7 3.4 0.4 0.2 Gas (mmcfpd) 229.4 21.9 18.6 83.6 Total (mboepd) 99.7 20.3 17.4 14.2 EXPENSES ($/BOE) LOE $1.76 $4.77 $11.51 $3.15 Transportation* $4.07 $5.70 $0.79 $4.18 Prod

  30. Slide 30: 2017 Basin Results

    2017 Basin Results PRODUCTION il (mbopd) 33.8 13.3 13.9 01 NGL (mbopd) 27 3.4 0.4 02 Gas (mmcfpd) 229.4 21.9 18.6 83.6 Total (mboepd) 99.7 20.3 17.4 142 EXPENSES ($/BOE) LOE $1.76 $4.77 $11.51 $3.15 Transportation” $4.07 $5.70 $0.79 $4.18 Production & other taxes $0.69 $3.00 $1.91 $0.80 Total Expens

  31. Slide 31: 2018 Annual Guidance

    2018 Annual Guidance DOMESTIC GUIDANCE 2017 ACTUAL 2018 ESTIMATES PRODUCTION Oil (mbopd) 61.2 74 NGL (mbopd) 31.7 35 Gas (mmcfpd) 356.5 408 Total (mboepd) 152.2 170 - 183 EXPENSES ($/BOE) LOE $3.47 $3.43 Transportation* $5.40 $5.09 Production & other taxes 3.5% 4.2% General & administrative, net $3.

  32. Slide 32: 2018 Basin Annual Guidance

    2018 Basin Annual Guidance 2018 BASIN GUIDANCE ANADARKO WILLISTON UINTA ARKOMA PRODUCTION Oil (mbopd) 42 14 16 0 NGL (mbopd) 31 4 0 0 Gas (mmcfpd) 291 20 16 79 Total (mboepd) 116 - 128 20 - 23 18 - 21 12 - 14 EXPENSES ($/BOE) LOE $1.89 $4.81 $10.97 $3.55 Transportation* $4.48 $5.60 $1.03 $4.32 Produ

  33. Slide 33: 2018 Domestic & Anadarko Quarterly Guidance

    2018 Domestic & Anadarko Quarterly Guidance DOMESTIC GUIDANCE 4Q’17A 1Q’18E 2Q’18E 3Q’18E 4Q’18E PRODUCTION Oil (mbopd) 67.1 71 72 77 75 NGL (mbopd) 36.3 33 34 36 39 Gas (mmcfpd) 398.3 394 402 412 424 Total (mboepd) 169.8 167 – 173** 169 – 177 176 – 186 179 – 191 CAPEX ($MM)* $306 $340 $355 $300 $30

  34. Slide 34: STACK 3YR Plan Modeling Assumptions

    STACK 3YR Plan Modeling Assumptions MODELING ASSUMPTIONS STACK PRODUCTION Avg. IP30 (BOEPD) 1,300 Avg. IP30 (% oil / % liquids) 59% / 79% Avg. EUR (Mboe) 1,300 Avg. EUR (oil Mbo / liquids Mboe) 455 / 860 First Five Year Cum (Mboe) 675 First Five Year Cum (Mbo) 275 EXPENSES ($/BOE) LOE $1.80 Oil tran

  35. Slide 35: SCOOP 3YR Plan Modeling Assumptions

    MODELING ASSUMPTIONS SCOOP Oil SCOOP Wet Gas PRODUCTION Avg. IP30 (BOEPD) 1,035 1,750 Avg. IP30 (Mbo oil / Mboe liquids) 695 / 870 420 / 1,100 Avg. EUR (Mboe) 1,695 2,700 Avg. EUR (oil Mbo / liquids Mboe) 610 / 1,170 270 / 1,500 First Five Year Cum (Mboe) 722 1,357 First Five Year Cum (Mbo) 298 179

  36. Slide 36: Williston Basin 3YR Plan Modeling Assumptions

    MODELING ASSUMPTIONS Williston PRODUCTION Avg. IP30 (BOEPD) 2,121 Avg. IP30 (% oil / % liquids) 65% / 83% Avg. EUR (Mboe) ~1,050 Avg. EUR (oil Mbo / liquids Mboe) 686 / 884 First Five Year Cum (Mboe) 642 First Five Year Cum (Mbo) 416 EXPENSES ($/BOE) LOE $4.70 Oil transportation $1.90 Gas/NGL transp

  37. Slide 37: Oil Hedging Details as of 02/15/18

    Oil Hedging Details as of 02/15/18 Weighted-Average Price Period Volume (bbl/d) Swaps Swaps w/ Short Puts10 Collars11 Collars w/ Short Puts12 1Q 2018 9,000 -- -- 51,000 $52.56 -- -- -- -- -- -- -- -- -- -- -- -- -- -- $39.76/$48.84-$56.33 2Q 2018 44,000 -- 14,000 -- $54.62 -- -- -- -- -- -- -- -- --

  38. Slide 38: Oil Hedging Details as of 02/15/18

    Oil Hedging Details as of 02/15/18 Weighted-Average Price Period Volume (bbl/d) Swaps Swaps w/ Short Puts Collars Collars w/ Short Puts13 1Q 2019 -- -- -- 36,500 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- $40.47/$50.53-$57.02 2Q 2019 -- -- -- 33,500 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- $40

  39. Slide 39: Oil Hedging Details as of 02/15/18

    Oil Hedging Details as of 02/15/18 The following table details the expected impact to pre-tax income (in millions, except prices) from the settlement of our derivative contracts, outlined on the previous slide, at various NYMEX oil prices. Oil Prices Period $20 $30 $40 $50 $60 $70 $80 1Q 2018 $68 $6

  40. Slide 40: Gas Hedging Details as of 02/15/18

    Gas Hedging Details as of 02/15/18 Weighted-Average Price Period Volume (mmbtu/d) Swaps Swaps w/ Short Puts14 Collars Collars w/ Short Puts15 1Q 2018 30,000 13,800 200,000 -- $3.01 -- -- -- -- $2.60/$2.97 -- -- -- -- $3.14-$3.72 -- -- -- -- -- 2Q 2018 160,000 40,000 10,000 30,000 $2.99 -- -- -- -- $

  41. Slide 41: Gas Hedging Details as of 02/15/18

    Gas Hedging Details as of 02/15/18 Weighted-Average Price Period Volume (mmbtu/d) Swaps Collars 1Q 2019 10,000 100,000 $2.91 -- -- $3.00-$3.47 2Q 2019 10,000 -- $2.91 -- -- -- 3Q 2019 10,000 -- $2.91 -- -- -- 4Q 2019 10,000 -- $2.91 -- -- -- 42

  42. Slide 42: Gas Hedging Details as of 02/15/18

    Gas Hedging Details as of 02/15/18 The following table details the expected impact to pre-tax income (in millions, except prices) from the settlement of our derivative contracts, outlined on the previous slide, at various NYMEX gas prices. Gas Prices Period $2.00 $2.50 $3.00 $3.50 $4.00 $4.50 $5.00

  43. Slide 43: Propane Hedging Details as of 02/15/18

    Propane Hedging Details as of 02/15/18 Weighted-Average Price Period Volume (bbl/d) Swaps ($/gal) 1Q 2018 4,700 $.818 2Q 2018 5,000 $.819 3Q 2018 4,000 $.811 4Q 2018 3,000 $.807 44

  44. Slide 44: Propane Hedging Details as of 02/15/18

    Propane Hedging Details as of 02/15/18 The following table details the expected impact to pre-tax income (in millions, except prices) from the settlement of our derivative contracts, outlined on the previous slide, at various Mont Belvieu non-tet propane. Propane Prices Period $.50 $.60 $.70 $.80 $.

  45. Slide 45: Endnotes

    Endnotes 1) Capital Budgets for 2019 and 2020 have not been finalized or approved by the Company’s Board of Directors, which has ultimate authority and discretion over future annual capital budgets. 2) Assumes $55/bbl and $2.85/mmbtu. 3) Based on production guidance issued on February 21, 2017 for f

  46. Slide 46: Endnotes (continued)

    Endnotes (continued) 8) Risked locations are defined as gross locations having a reasonable potential for commercial development. Unrisked locations are defined as gross locations prior to applying a chance for commercial success. Such amounts do not meet SEC rules and guidelines, may not be reflect

  47. Slide 47: Key Definitions

    Key Definitions Adjusted EBITDA – Newfield defines EBITDA as net income/loss before income tax expense/benefit, interest expense and depreciation, depletion and amortization. Adjusted EBITDA, as presented herein, is EBITDA before ceiling test impairments, gains/losses on asset sales, non-cash compen

  48. Slide 48: Key Definitions

    Key Definitions GPI – Gross Perforated Interval, which reflects the total feet completed in each horizontal wellbore. IRR – Internal rate of return is a metric used by Company management for capital budgeting and measuring the profitability of potential investments. All IRR’s presented herein were c

  49. Slide 49: Key Definitions

    Key Definitions GPI— Gross Perforated Interval, which reflects the total feet completed in each horizontal wellbore. IRR ~ Internal rate of return is a metric used by Company management for capital budgeting and measuring the profitability of potential investments. All IRR’s presented herein were ca

Newfield Exploration — FY2017 Earnings Presentation on 6ix