  1. Slide 1: Revised Presentation cover letter to stock exchanges

    July 16, 2020 The DC CS - CRD BSE Liimited Natiional Stock k Exchangee of India Ltd. L Corporaate Relationnship Deparrtment Exch hange Plazaa, C-1, Blocck G, 1st Flooor, New Tradding Ring, Bandra Kurla Complex, C Rotunda Building, P. J. Towerrs, Bandra (East), Mumbai M – 4400 051 Dalal Street, Mumbb

  2. Slide 2: Borosil Renewables Limited

    Gujarat Borosil Ltd. Borosil Renewables Limited. 1

  3. Slide 3: Borosil Renewables Limited

    Borosil Renewables Limited • Part of the Borosil Group - pioneers in glass manufacturing in India • India’s sole manufacturer of Low Iron Textured Solar Glass • World’s first manufacturer of 2mm fully tempered solar glass • Manufacturing facility at Bharuch, Gujarat 2

  4. Slide 4: Developments in FY20

    Developments in FY20 • The Board had earlier approved a composite scheme of amalgamation and arrangement involving the company, Erstwhile Gujarat Borosil Ltd., Fennel Investments, Vyline Glass Works Ltd. and Borosil Limited. • The National Company Law Tribunal, Mumbai Bench (NCLT) approved the schem

  5. Slide 5: New Brown field Solar Glass Plant with Capacity 240 TPD

    New Brown field Solar Glass Plant with Capacity 240 TPD (1.2 GW annual Capacity) • Work on SG-2 project had started on 19th April 2018 and was completed by the team in record time. • The team was able to light the furnace on 6th June 2019, in less than 14 months, ahead of plan. • Glass was first dra

  6. Slide 6: Rebuild of Existing Solar Glass Plant with enhanced Capacity of 210 TPD

    Rebuild of Existing Solar Glass Plant with enhanced Capacity of 210 TPD • The Rebuild was started on 18th August 2019 and was completed by the team in record time. • The Commercial production of SG # 1 Rebuild was started 2nd December 2019. The furnace was light up on 1st November 2019. The glass wa

  7. Slide 7: Impact of the COVID-19 pandemic on the business

    Impact of the COVID-19 pandemic on the business • The business of the Company has been severely impacted by Covid-19 pandemic. At the start of the lockdown, the Company was forced to shut down production from both the furnaces and put the same on soak at high temperature till 23rd April 2020. • In t

  8. Slide 8: Financial Highlights –Q4 FY 20 & FY20

    Borosil Renewables Limited (BRL) Financial Highlights –Q4 FY 20 & FY20 Particulars Q4 Q4 QoQ FY 20 FY 19 Growth FY 20 FY 19 Growth in % in % Revenue From Operations (Rs. In Crore) 94.26 62.13 51.7% 271.16 216.76 25.1% EBITDA (Rs. In Crore) 21.19 9.49 123.3% 40.04 41.80 -4.2% Interest (Rs. In Crore)

  9. Slide 9: Key Financial Data

    Borosil Renewables Limited (BRL) Key Financial Data Rs. In Lakhs Particulars As at 31st March 2020 Non-current Assets 37,175 Current Assets 12,797 TOTAL ASSETS 49,972 Equity 32,644 Non-current Liabilities 9,069 Current Liabilities 8,259 Total Equity & Liabilities 49,972 8

  10. Slide 10: Sunny Outlook for Indian Solar Energy - Strong Govt. initiatives for demand

    Sunny Outlook for Indian Solar Energy - Strong Govt. initiatives for demand • Strong Govt. impetus targeting 100 GW installed capacity by 2022 under National Solar Mission. • Substantial capacity added after 2014. The total installed capacity as on 31.3.2020 stands at 37 GW. • Govt providing push an

  11. Slide 11: Sunny Outlook for Indian Solar Energy - Policy Boost to local production

    Sunny Outlook for Indian Solar Energy- Policy Boost to local production • India has imposed anti-dumping duty in August 2017 against solar tempered glass imports from China. Unfortunately, no ADD was imposed by Authority despite ascertaining injury to domestic industry. • Govt trying to develop an e

  12. Slide 12: BRL- Strong Growth Prospects

    BRL- Strong Growth Prospects • Net Sales growth 12.6% CAGR FY14-20 in Solar Business. • New products-thinner glass in 2.5 and 2.8 mm becoming popular and helping customers reduce cost. Sale of these thicknesses now comprise of 20% of the Company’s sales in 2019-20. In export markets, 2mm fully tempe

  13. Slide 13: BRL’s competitive advantage

    BRL’s competitive advantage • Market Leadership in Indian Solar Glass Market – Cost competitive with supplies from China /Malaysia except for subsidies in inputs/costs in those countries and incentives on exports. • State of the art manufacturing with strong testing and R&D infrastructure – High deg

  14. Slide 14: BRL offers world’s first 2 mm fully tempered glass

    BRL offers world’s first 2 mm fully tempered glass. New generation Photovoltaics First in the world ! APPLICATIONS Solar windows Solar car parks Solar rooftops Solar curtain walls

  15. Slide 15: Innovation led - Engineering and R&D Capabilities

    Innovation led -Engineering and R&D Capabilities Results Achieved through Passion for Innovation and R&D Antimony free Low  Developed technology to manufacture world’s first antimony free low iron textured Solar Glass Iron Solar Glass  Prevented use of 250 MT of toxic element antimony per annum 

  16. Slide 16: Disclaimer

    Disclaimer “This investor presentation has been prepared by Borosil Renewables Limited (“Borosil”) on a strictly confidential basis. Certain statements in this presentation may be ‘forward looking statements’ within the meaning of applicable laws and regulations. These forward looking statements ref

  17. Slide 17: Thank you

    Thank you 16