Slide 1: Kingsgate Consolidated Limited December Quarter 2012
Kingsgate Consolidated Limited December Quarter 2012
Slide 2: Disclaimer
Disclaimer Forward Looking Statements: These materials include forward looking statements. Forward looking statements inherently involve subjective judgment & analysis & are subject to significant uncertainties, risks & contingencies, many of which are outside of the control of, & may be unknown to,
Slide 3: December Quarter - Key Points
December Quarter - Key Points • Group gold production of 46,149oz at total cash cost of US$975/oz. • Chatree Plant 2 offline until met. licence granted in early October and continued development focus at Challenger. • Record quarterly development at Challenger of 1,833 metres shows initiatives are w
Slide 4: Chatree
Chatree Plant 2 offline until 10 October for Reduced finalisation of met. licence. Operational 1,562Kt @ 0.81g/t for 30,391oz. Performance Recovery of 78.3% being addressed. Total cash costs US$843/oz (incl. US$162/oz royalty). Total Cash Costs Lower grade and reduced recoveries. Continu
Slide 5: Deeper High Grade Targets
Deeper High Grade Targets Visual representation of the total gold accumulation at Chatree from the resource modelling (gram metres) Section through M01 lode at A Pit
Slide 6: Challenger
Challenger 117Kt @ 4.37g/t for 15,758oz Production Reflects Focus on u/g development to Development Focus establish new mining fronts and campaign milling. Total cash costs US$1,229/oz (incl. US$60/oz royalty). Total cash Costs Costs reflect the low production and development bias. Record
Slide 7: Challenger
Challenger Operation turning around and upside potential Visible gold in core (BQ) from Challenger West
Slide 8: Nueva Esperanza
Nueva Esperanza Feasibility study extended to include Feasibility Study on-site power options and heap leach Conducted in parallel to milling study Metallurgical testwork is underway. On-site column leach testing facilities Metallurgical under construction. Testwork Results received progre
Slide 9: Bowdens Resource Growth
Bowdens Resource Growth Resources grow by 40% to 182Moz AgEq* Pit optimisation delivers low strip ratio (~1:1) and high grade starter pit. Metallurgical testing delivers 9% improvement in recovery over earlier work. Application for Director General’s Requirements for EIS lodged with NSW Govt.
Slide 10: Outlook
Outlook • Group gold production guidance for FY13 maintained at 200,000 to 220,000oz, with higher second half. • Chatree gold production between 120,000 to 130,000oz. • Challenger gold production between 80,000 and 90,000oz. • Nueva Esperanza feasibility to incorporate heap leach and on-site power s
Slide 11: Kingsgate Consolidated Limited
Kingsgate Consolidated Limited Shares: 151 Million Market Cap: ~A$750 Million ASX: KCN www.kingsgate.com.au
Slide 12: Appendix
Appendix General Disclaimer: The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue securities or other financial products. The information contained in this presentation is not investment or financial product
Slide 13: Chatree
Chatree Chatree Ore Reserves as at 30 June 2012 (>0.3g/t gold cut-off grade) Gold Silver Gold Silver Grade Tonnes Grade Contained Contained AuEq Source Category (millions) (g/t) (g/t) (Moz) (Moz) (Moz) From Pits Proven 46.2 0.79 7.9 1.17 11.7 1.30 Probable 16.7 0.72 5.9 0.39 3.2 0.42 Stockpiles 8.4
Slide 14: Challenger
Challenger Challenger Ore Reserves as at 30 June 2012 Tonnes Gold Gold Source Category Grade Contained (million) (g/t) (‘000 oz) From Mine Proven 0.64 4.32 90 Probable 2.61 6.61 550 Challenger Total Total 3.25 6.16 640 Challenger Mineral Resources as at 30 June 2012 Tonnes Gold Gold Source Category
Slide 15: Nueva Esperanza
Nueva Esperanza Nueva Esperanza Mineral Resources as at 30 June 2012 (0.5g/t AuEq cut-off grade) Gold Silver Gold Silver AgEq AuEq Tonnes Grade Grade Contained Contained Contained Contained Category (millions) (g/t) (g/t) (Moz) (Moz) (Moz) (Moz) Measured 1.8 0.01 90 0.00 5.1 5.2 0.12 Indicated 20.2
Slide 16: Bowdens
Bowdens Bowdens Mineral Resources as at 30 June 2012 (30g/t AgEq cut-off grade) Grade Contained Metal Category Tonnes (t) Silver Lead Zinc AgEq Silver AgEq AuEq g/t % % g/t (Moz) (Moz) (Moz) Indicated 31.2 60.6 0.30 0.40 77.5 60.8 77.8 1.73 Inferred 27.0 44.0 0.30 0.40 61.0 38.2 53.0 1.18 Indicated