Advantage Energy Ltd · TSX:AAV

Advantage Energy — Advantage Oil & Gas — Investor Presentation (September 2010)

42 slides from Advantage Energy's investor presentation, September 2010

  1. Slide 1: Investor Presentation September 2010

    Investor Presentation September 2010 TSX: AAV NYSE: AAV September 2010 Page 1

  2. Slide 2: Advisory

    Advisory The information in this presentation contains certain forward-looking statements, including within the meaning of the United States Private Securities Litigation Reform Act of 1995. These statements relate to future events or our future intentions or performance. All statements other than s

  3. Slide 3: Advantage Oil & Gas Ltd.

    Advantage Oil & Gas Ltd. • Listed on TSX & NYSE AAV • Market Capitalization at September 2, 2010 $1.1 billion • Shares Outstanding (Basic) 163 million • Estimated Production • Q2 2010 (net of non-core asset sales) ~24,100 boed • Q2 2011 Forecast ~30,000 boed • Credit Facility $525 million • Availabl

  4. Slide 4: Advantage – Corporate Strategy

    Advantage – Corporate Strategy • Focus on Montney Natural Gas Resource Play Development at Glacier, Alberta • Grow Glacier production to a target of 100 mmcfd (16,667 boed) by Q2 2011 (currently at 50 mmcfd) • Continue delineation of our extensive land block and conversion of future reserves/resourc

  5. Slide 5: Q2 2010 Highlights

    Q2 2010 Highlights • Glacier plant inlet volumes increased to an average of 51 mmcfd with total operating costs decreasing from $8.75/boe to $3.00/boe ($1.45/mcf to $0.50/mcf) • Corporate production grew 15% to 24,100 boe/d compared to Q3 2009 (net of dispositions) with corporate operating costs red

  6. Slide 6: Advantage Daily Production, Net of Dispositions

    Advantage Daily Production, Net of Dispositions* Glacier at 100 Daily Production, Boe/d mmcfd 30,000 Corporate production has grown organically and is projected to 28,000 increase by 52% when Glacier reaches 100 mmcfd in Q2 2011 26,000 24,000 22,000 20,000 18,000 16,000 Q3 09 Q4 09 Q1 10 Q2 10 H2 10

  7. Slide 7: Glacier – Thick Montney Siltstone Supports Higher Reserve Recoveries

    Glacier – Thick Montney “Siltstone” Supports Higher Reserve Recoveries Unconventional Marcellus Glacier Shale Horn River Edmonton Shale Barnett Calgary “Shaley” silts Haynesville Arc Silt Shell Birchcliff Most active drilling area in Glacier Montney “Tight” sand Conventional Encana AAV Glacier the M

  8. Slide 8: Recent M&A Activity Around Glacier

    Recent M&A Activity* Around Glacier Recent M&A Activity: CNRL Storm • CNRL / Talisman Monterey (ARC) Monterey (Pengrowth) • ARC / Storm (Pengrowth) • Pengrowth / Monterey ARC CNRL Shell (Talisman) • Apache / BP • Murphy / Cequence Recent Joint Venture Talisman Birchcliff Activity: Encana • Encana /

  9. Slide 9: Top Quartile Initial Production Rates (30 day) at Glacier

    Top Quartile Initial Production Rates (30 day) at Glacier To date results at Glacier prove up a significant amount of undrilled acreage across the land block and IP‟s are comparable to EnCana Swan wells Glacier Production Growth to 50 mmcfd in 20 months EnCana Swan EnCana Swan Advantage Glacier Adva

  10. Slide 10: Montney Horizontal Well Production Range and Type Curve

    Montney Horizontal Well Production Range and Type Curve Data includes Swan, Pouce Coupe, Tupper, Groundbirch & Glacier Glacier well economics based on this type curve at 4.5 mmcfd IP, 5 bcf and $5.5 mm well cost: @$3.00 Cdn flat pricing: >18% ROR BT @$4.00 Cdn flat pricing: >39% ROR BT 25% 30 Day IP

  11. Slide 11: Glacier Upper Montney – Well Test Rates Improved

    Glacier Upper Montney – Well Test Rates Improved 12,000 10,000 Test Rate (mcf/d) 8,000 6,000 4,000 Average Hz well rate increased from 3.6 mmcf/d to 6.5 mmcf/d 2,000 due to improved frac techniques 0 0 500 1,000 1,500 2,000 2,500 Flowing Pressure (psi) First 12 wells Last 21 wells (Updated to the En

  12. Slide 12: Glacier Upper Montney Rate per Frac Improved 1.7x

    Glacier Upper Montney Rate per Frac* Improved 1.7x 1,300 1,200 793 mcf/d Last 21 wells 1,100 1,000 900 465 mcf/d First 12 wells 800 700 mcf/d 600 500 400 300 200 100 0 Completions in chronological order * Due to testing equipment constraints on high rate/high pressure wells, the rate per frac has be

  13. Slide 13: Completion Costs per Frac Reduced

    Completion Costs per Frac Reduced $1,000,000 $900,000 $800,000 Completion costs per frac decreased over 50% due to more $700,000 efficient completion techniques & lower supply costs $600,000 Future completion $500,000 costs are anticipated to increase due to $400,000 higher multi-frac activity level

  14. Slide 14: Drilling and Completion Well Costs Reduced

    Drilling and Completion Well Costs Reduced D+C costs decreased despite $9,000,000 increased # fracs per well 4 to 8 fracs $8,000,000 per hz well 8 to 14 fracs per hz well $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $0 Completion Drilling Wells in chronological order

  15. Slide 15: Glacier - Expand to 100 mmcfd by Q2 2011

    Glacier - Expand to 100 mmcfd (16,667 boe/d) by Q2 2011 Highlights: Targeted Production Growth * Gross plant inlet volume • Project commences immediately and is scheduled for completion Q2 2011 Approved and In-progress • Glacier at 100 mmcfd will comprise approximately 55% of corporate production Co

  16. Slide 16: New Alberta Royalty Incentives Enhance Glacier Economics

    New Alberta Royalty Incentives Enhance Glacier Economics • Significant enhancement for Glacier Montney horizontal wells due to changes in the Natural Gas Deep Drilling Program (“NGDDP”): • Reduced qualifying depth from 2,500 meters to 2,000 meters • Program is now a permanent feature (no expiry date

  17. Slide 17: Glacier – Strong Netbacks & Attractive Recycle Ratios

    Glacier – Strong Netbacks & Attractive Recycle Ratios Based on 100 mmcfd at Glacier Revenue ($ Cdn/mcf) $4.00 $5.00 Royalties $(0.28) $(0.35) Royalty Rate 7.0% 7.0% Operating Costs $(0.29) $(0.29) Operating netbacks Operating Netback ($/mcf) $3.43 $4.36 exceed 85% of revenue Annual Cash Flow ($Milli

  18. Slide 18: Glacier – Potential Plays Stacked above the Montney

    Glacier – Potential Plays “Stacked” above the Montney • Additional resource and conventional plays are “stacked” above the Montney at Glacier • Montney horizontal wells are providing a „free look‟ at all these potential stacked formations • Economics for these plays will be enhanced due to the Montn

  19. Slide 19: Guidance – 12 Months ending June 2011

    Guidance – 12 Months ending June 2011 Guidance H2 2010 H1 2011 12 Months Production Average (boe/d) 23,000 - 23,800 26,600 - 27,200 24,800 - 25,500 Royalty Rate (%) 13% - 15% 13% - 15% 13% - 15% Operating Costs ($/boe) $9.75 - $10.25 $8.50 - $9.00 $9.10 - $9.65 Capital Expenditures ($Millions) $120

  20. Slide 20: Solid Hedging Program to Support Future Cash Flow

    Solid Hedging Program to Support Future Cash Flow % of net Aeco Cdn $ Nymex US $ NATURAL GAS Production Hedged (per mcf) (per mmbtu) * 2010 Q1 81% $7.64 $8.04 Q2 57% $7.53 $7.93 Q3 47% $7.27 $7.67 Q4 48% $7.27 $7.67 2010 Full Year 59% $7.46 $7.86 2011 Q1 40% $6.43 $6.83 Q2 25% $6.24 $6.64 Q3 24% $6.

  21. Slide 21: Advantage - Well Positioned for Growth

    Advantage - Well Positioned for Growth • Montney natural gas resource play at Glacier • Increase production to 100 mmcfd (16,667 boe/d) by Q2 2011 • Cost structure reduced • Growth at Glacier will lower operating cost & capitalize on efficiencies due to AAV’s Glacier gas plant expansion • Dispositio

  22. Slide 22: Contact Information

    Contact Information Investor Relations 1.866.393.0393 [email protected] Andy Mah, P.Eng. Chief Executive Officer Craig Blackwood, C.A. Vice-President, Finance www.advantageog.com TSX:AAV NYSE:AAV Advantage Oil & Gas Ltd. Suite 700, 400 – 3rd Avenue SW Calgary, Alberta T2P 4H2 Main: 403.718.8000 Fac

  23. Slide 23: Appendix

    Appendix Montney and Other Properties September 2010 Page 23

  24. Slide 24: Glacier – Low Well Density Provides Significant Upside Potential

    Glacier – Low Well Density Provides Significant Upside Potential Vast Majority of Land at Glacier Contains No Hz Montney Wells Glacier and Swan Production Chart EnCana Swan Swan Glacier Advantage Glacier 5 + wells 3 - 4 wells Glacier Production Growth to 50 mmcfd in 20 months: 1 - 2 wells No wells B

  25. Slide 25: Montney Horizontal Drilling Density – wells/section

    Montney Horizontal Drilling Density – wells/section BC AB BC AB UPPER MONTNEY LOWER MONTNEY 5 + wells 3 - 4 wells 1 - 2 wells No wells AAV lands • Drilling to June 2010 September 2010 Page 25

  26. Slide 26: Glacier – Results Exceeding Expectations

    Glacier – Results Exceeding Expectations Test Rates Exceeding Expectations Across Land Block 3 Upper Montney Hz 12 mmcf/d @ 1300 psi 2 Upper Montney Hz 8 Upper Montney Hz Avg. 8.1 mmcf/d @ 812 psi Avg 5.1 mmcf/d @ 1404 psi 2 Lower Montney Hz 4.6 mmcf/d @ 917 psi 4.2 mmcfd @ 495 psi 1 Upper Montney H

  27. Slide 27: Increased Drilling Activity & Successful Well Results Surrounding Glacier

    Increased Drilling Activity & Successful Well Results Surrounding Glacier Land Block New Birchcliff Lower Montney HZs Birchcliff Upper Montney/Doig Murphy – 4 L. Montney Hz‟s Tested average of 8.4 MMcf/d Cequence 3.5 Mmcf/d U Montney Devon New Upper Montney HZ Drilling Cequence 5.5 Mmcf/d U Montney

  28. Slide 28: Glacier - Infrastructure Expansion

    Glacier - Infrastructure Expansion AAV Glacier Gas Plant AAV Glacier gas plant to be expanded to 100 TCPL mmcfd Sales lateral to be expanded to 100 mmcfd TCPL Mainline Existing TCPL Lateral • Glacier gas plant expansion to 100 Current mmcfd will further reduce cost structure Gathering System Wembley

  29. Slide 29: Glacier – Reserves and Resource Potential

    Glacier – Reserves and Resource Potential Advantage working interest reserves and contingent sales gas resource in million boe (TCF) Significant Upside Potential Remains 285.0 (1.7 TCF) 2009 Reserves assignment: • 56 of 84 sections @ 3.8 wells/sec Upper Montney 218.3 • 27 of 84 sections @ 2.5 wells/

  30. Slide 30: Montney – Reserves/Well Could Exceed Expectations

    Montney – Reserves/Well Could Exceed Expectations due to Silt/Sand Reservoir Montney type well @ Swan (based on 50 wells that have the longest production history) Barnett Shale type wells by operator Source: Facts are Stubborn Things, Oct. 25, 2009, Arthur E. Berman September 2010 Page 30

  31. Slide 31: Montney Deposition and Paleo - Geography

    Montney Deposition and Paleo - Geography Meters of water 10‟s of meters of water “Conventional”Montney 100‟s of meters of water Doig Upper Montney) Montney (Lower) Modern US Atlantic Long Island shelf for scale Cape Hatteras September 2010 Page 31

  32. Slide 32: Lithological Comparison of Major Unconventional Gas Plays

    Lithological Comparison of Major Unconventional Gas Plays 0% • The Montney and Doig Formations have a 100% predominantly siltstone and sandstone matrix as opposed to the mainly shale matrix common in other major resource plays Shales • Most of the gas in place at Glacier is situated within the silt

  33. Slide 33: Montney Formation Geology

    Montney Formation Geology West East Swan Sunset Groundbirch Tupper Dawson Sturgeon Glacier Ante Ck Upper Doig Phosphate W-E Cross schematic section Note truck for scale of Montney and Doig Thin bedded turbidites and mudstones in Sacramento Formations Valley, California, a modern analog for the Lower

  34. Slide 34: Montney – A Balance of Factors

    Montney – A Balance of Factors Shale Silty shale Silt Silty sand Sand 1,250 1,750 2,250 2,750 3,250 3,750 Depth (meters) 40 60 80 100 120 140 160 180 200 220 Thickness (meters) Utica Woodford MONTNEY Marcellus Horn River Haynesville Fayetteville Barnett 2 3 4 5 6 7 8 9 10 11 12 Porosity (%) Septembe

  35. Slide 35: Doig/Montney Completion Techniques

    Doig/Montney Completion Techniques • Swell Packer Packers Plus Completion • Delta Stim/Packers Plus or Weatherford ARES • Hydra jet (sand plug) Hydra Jet Sand Plugs Delta Stim tool “Frac Door systems” run as integral part of casing Perforate or cut slots to frac through production casing Swell Packe

  36. Slide 36: Enviable Asset Base

    Enviable Asset Base Enviable Asset Base • Glacier (8,000 boe/d)* • Significant Montney natural gas resource play Alberta Saskatchewan • Central Alberta (11,000 boe/d)* Montney natural gas resource play • Conventional & emerging oil & natural Glacier gas resource plays • Foothills Gas Sunset (1,100 b

  37. Slide 37: Nevis - Light Oil and Coal Bed Methane Resource Plays

    Nevis - Light Oil and Coal Bed Methane Resource Plays R23 R.22W4 R22 R.21W4 R21 R20W4 FD F D F F F G T39 F G 1 6 5 4 3 2 1 6 5 4 3 2 1 6 5 K F U FU KF G F C FF K K F F Horseshoe Canyon F CU D CL CBM Gas Pool 35 36 31 32 33 34 35 36 31 32 33 34 35 36 31 F U F G C K U VF L GC F F GD K GC G K IK DK UF

  38. Slide 38: Nevis – Wabamun Light Oil Resource Play

    Nevis – Wabamun Light Oil Resource Play Horizontal Type Well vs Vertical Type Well • Lower permeability light oil carbonate reservoir • High porosity 30% -> Large OOIP • Hz wells enhanced play economics Hz well EUR = 220 mboe • 70 Hz wells drilled to date (estimated ultimate recovery) • Primary rese

  39. Slide 39: Nevis – Horseshoe Canyon Coal Bed Methane

    Nevis – Horseshoe Canyon Coal Bed Methane Nevis CBM Normalized Well Production • Horseshoe Canyon CBM Based on Advantage‟s CBM wells development • Current WI production 11 mmcfd • Property acquired in mcfd/well Less than 5% decline (Sproule‟s forecast uses declines of 14% - 20%) Sept 2007 • 105 well

  40. Slide 40: Sunset A Pool – Montney Light Oil, Drilling & Waterflood Upside

    Sunset A Pool – Montney Light Oil, Drilling & Waterflood Upside Sunset Montney A oil pool R20 R19W5 has significant upside potential • W.I. Production: 618 boe/d • Montney light oil, 32 degree API 2 1 6 5 4 0 T70 • W.I. 70%, 100% operated • Reserve Life Index P+P: 17 years J U E J S E J • OOIP: 46 m

  41. Slide 41: Lookout Butte – Foothills Gas with Multi-zone Drilling Upside

    Lookout Butte – Foothills Gas with Multi-zone Drilling Upside R29 R28 R27W4 1 6 T3 T3 33 34 35 36 Mississipian Rundle – main producing gas zone 31 32 33 34 35 Mannville – uphole light oil 28 27 Cardium – uphole gas 26 25 30 29 28 27 26 R28W4 21 22 23 24 19 20 21 22 23 T2 T2 UA 16 15 14 13 18 17 16 1

  42. Slide 42: Lookout Butte – Example of Rundle Drilling Potential

    U F U Lookout Butte – Example of Rundle Drilling Potential 11 12 7 8 9 10 F C E 11 FC UU G G F E U L U e 2 U 1 6 F 5 4 3 2 U U L E F • Section 16 has produced 79 BCF to U 35 36 31 32 33 34 35 date from 3 wells: C U L U • 14-16 49 Bcf L • 7-16 26 Bcf 26 25 U • 30 29 28 27 26 K A 2-16 4 Bcf (drilled 2

Advantage Oil & Gas — Investor Presentation (September 2010) on 6ix