  1. Slide 1: Resources Rising Stars - Bauxite Hills Project – Deliberate Focus

    For personal use only Resources Rising Stars September 2015 Bauxite Hills Project – Deliberate Focus ASX : MMI

  2. Slide 2: Corporate Snapshot

    CORPORATE SNAPSHOT For personal use only Shareholders MMI Share Price (A$) NetWealth Investments DADI 5% 17% 0.140 Mr Gregory Other Willims 0.120 47% 6% 0.100 Balanced Property 0.080 XINFA Group 19% 6% 0.060 0.040 Capital Structure 9 Sept 2015 0.020 Share Price 7.9c - Shares on Issue 358.5m Market C

  3. Slide 3: Bauxite Hills Overview

    Bauxite Hills Overview For personal use only Well Located in Leading Bauxite Province of Cape York, in Queensland, Australia  Reserves of 48.2Mt*  50.2% total Al2O3  38.4% THA  6.4% RxSi  Product quality comparable to Weipa  Nearby existing infrastructure  Positive community engagement * ASX

  4. Slide 4: Simple Operation

    Simple Operation Mining For personal use only clear vegetation & remove overburden return overburden & replace topsoil - then revegetate strip mine bauxite Overburden (~0.5m) DSO Bauxite Horizon (~1.75m) Ironstone Mottled Zone Transportation Haul ore 5-10km to stockpile & barge loading Barge ore 10k

  5. Slide 5: Bauxite Hills – Ticking all the Boxes

    Bauxite Hills – Ticking all the Boxes For personal use only High Margin Development Opportunity  Simple Construction and operation  Low CAPEX and OPEX  PFS demonstrates robust economics with post-tax NPV 15% of A$197 M and 88% IRR**  27 years* mine life following recent Reserve increase  Up to

  6. Slide 6: Pre-Feasibility Study – Key Outcomes

    Pre-Feasibility Study – Key Outcomes For personal use only Completed in February 2015 – Simple Operation & Robust Economics Operational Metrics Financial Metrics** (Real) Production Rate Up 2 Mtpa* DSO NPV (15%) after tax A$197m Strip Ratio (waste to ore) 1:10 IRR (100% Equity) 88% Mine Life 27 year

  7. Slide 7: Pre-Feasibility Study – CAPEX & OPEX

    Pre-Feasibility Study – CAPEX & OPEX For personal use only Low CAPEX & Competitive OPEX* Capital Expenditure (A$m) Operational Expenditure (A$/t) Mine Access (Haul Road) 2.8 Mining Cost to ROM stockpile 3.0 Mine & Barge Loading Infrastructure 10.6 Crush, Load and Barge costs 10.5 Mine Camp & Airport

  8. Slide 8: Demand Driven Price Growth

    Demand Driven Price Growth For personal use only  Bauxite has experienced strong price growth in the past decade, growing at ~8% pa  Price growth has been further supported by the Indonesian ban on raw material export in early 2014, resulting in demand outstripping supply $70 Average price of Chin

  9. Slide 9: Price Outlook

    Price Outlook  Global growth in aluminium consumption led by China  Will be updated in Definitive Feasibility Study Latest For personal use only is forecasted to drive bauxite prices  CBIX update shows pricing is increasing again  Metro Mining’s bauxite price forecasts are based on independent r

  10. Slide 10: Forecast of China Bauxite Imports

    Forecast of China Bauxite Imports For personal use only 120.0  China imported 22.7 Mt of bauxite in first half of 2015. 100.0 Approx 75% of imports are low temp Shanxi bauxite 80.0 Inner Mongolia  Indonesian bauxite ban still in place Million Tonne Henan 60.0 Guizhou  Malaysia could export up to

  11. Slide 11: Location | Location | Location

    Location| Location | Location  Cape York’s high quality export grade bauxite with high alumina content and its characteristics For personal use only are well known to Chinese and other international alumina refineries  Located close to international shipping routes with low relative freight costs

  12. Slide 12: Permitting Pathway

    Permitting Pathway For personal use only  Continued positive local community engagement  DEHP confirmed an EIS is required. The absolute cost is and support being evaluated and a 6 month delay is anticipated.  Preferred Right to Negotiate process with Native  Metro will now maximise the opportun

  13. Slide 13: Right Schedule

    Right Schedule For personal use only Completed Resource Estimate: 47Mt Latest DEHP advice will cause Completed PFS Feb 2015 and Resource increased to 61.5 Mt 6 month delay Lodge Documents Draft EA Approval Fully Funded First Shipment DFS Results Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Definitive Feasibility Study (

  14. Slide 14: Product Quality & Marketing

    Product Quality & Marketing For personal use only Off-take Discussions and Marketing Strategy Progressing Well  Marketability study undertaken by industry consultants CM Group  Bauxite Hills is product suitable for low temperature refining process used in over 80% of China’s current refining capac

  15. Slide 15: Future Opportunities

    Future Opportunities For personal use only Bauxite Tenements in Cape York 1,300sq kilometres of exploration permits in a region well known for its high-quality, export grade bauxite. Comprehensive Exploration programme planned for H2 2015 Opportunity to Increase production by replicating the Bauxite

  16. Slide 16: Summary

    Summary For personal use only Attractive  Global growth in aluminium consumption Fundamentals  Increasing demand for bauxite in China   Strong price growth forecasted  Focus on DSO quality bauxite Favourable  Western Cape York is known for high-quality export grade bauxite Location  Proposed

  17. Slide 17: Disclaimer

    DISCLAIMER Statements and material contained in this Presentation, particularly those regarding possible or assumed future performance, production levels or rates, commodity prices, resources or potential growth of Metro Mining Limited, industry growth or other trend projections are, or may be, forw