Petra Diamonds Limited · LSE:PDL

Petra Diamonds — RBC African Mining Conference 2014

38 slides from Petra Diamonds's conference presentation, May 2014

  1. Slide 1: Discover Petra – A Leading Independent Diamond Producer

    The Finsch mine in South Africa Discover Petra – A Leading Independent Diamond Producer May 2014

  2. Slide 2: Important Notice

    Important Notice These Presentation Materials do not constitute or form part of any invitation, offer for sale or subscription or any solicitation for any offer to buy or subscribe for any securities in the Company nor shall they or any part of them form the basis of or be relied upon in any manner

  3. Slide 3: Discover Petra

    Discover Petra LSE: PDL: Constituent of FTSE 250; market capitalisation of ca. £850m / US$1.4bn (as at 30 April 2014) 1. Pure play diamond exposure: uniquely poised to benefit from late cycle credentials and growing middle classes 2. Quality management and assets: consistent strategy, performance an

  4. Slide 4: Organic Growth Path to 5 Million Carats pa

    Organic Growth Path to 5 Million Carats pa • FY 2014 onwards – operating cashflow to cover capital programme FY 2019 production target of ca. 5.0 Mcts; revenue of ca. US$1bn 1000 6.0 FY 2014 production Carat production (million carats) target of ca. 5.0 3.0 Mcts; consensus FY 2013 revenue of product

  5. Slide 5: 1. Pure Play Diamond Exposure

    1. Pure Play Diamond Exposure • Limited supply: only ~30 significant kimberlite mines in production; no major discoveries since 1990’s • Major mines maturing: past production peak; smaller footprints and some moving underground • Late cycle credentials: demand driven by urbanisation, growing middle

  6. Slide 6: 2. Quality Management and Assets

    2. Quality Management and Assets • Diversified portfolio: five producing mines in South Africa, one in Tanzania and exploration in Botswana • World-class resource: +300 million carats (largest outside the majors) worth ~US$55.0 billion¹ (at 30 June 2013), incl. one Tier 1 asset (Cullinan) Africa pro

  7. Slide 7: 2. Quality Management and Assets

    2. Quality Management and Assets • Petra team is highly experienced in managing producing diamond mines in Africa • Consistent delivery of growth – target of 5 Mctpa established in January 2011 Mine Management Project Development • Focus on efficiencies and simplification of • Utilise in-house exper

  8. Slide 8: 2. Quality Management and Assets

    2. Quality Management and Assets • Kimberlite production profile (diamond quality and size ranges) remains highly constant over time, resulting in accuracy for diamond price forecasting • Ever growing volumes across the full diamond spectrum (from lowest to highest value) • Growing trend for mass lu

  9. Slide 9: 2. Quality Management and Assets

    2. Quality Management and Assets • Historic, high value diamonds are a regular feature of Petra’s production portfolio The Greater Star of The Williamson Pink Africa 55ct rough; 24ct polished; Largest polished yield gifted to Princess Elizabeth from the Cullinan at on her engagement 530ct; sits in t

  10. Slide 10: 3. Strong Growth Profile

    3. Strong Growth Profile • Caving is a safe and proven mechanised mining method • Expansion programmes to establish new block/sub level caves in undiluted kimberlite • Grades expected to rise significantly, increasing diamond content per tonne mined: • Finsch ca. 37 cpht to ca. 56 cpht¹ • Cullinan c

  11. Slide 11: 4. Significant Margin Expansion

    4. Significant Margin Expansion Operating margins to gradually rise from +30% to +50% by FY 2019 • ROM grades expected to increase ca. 50% once expansion programmes open up undiluted ore blocks • Higher value ROM carats in production mix expected to increase to ca. 90% • Unit costs to be well manage

  12. Slide 12: 5. Fully Financed

    5. Fully Financed Debt Facilities1 H1 FY 2014: operating cashflow covered capex US$ million • Operating cashflow of US$91.9 million (Percentage utilised in brackets) • Cash capex of US$84.7 million As at 31 December 2013: 48 • Cash: US$28.0 million and diamond inventories of ca. US$49.4 million (18%

  13. Slide 13: Outlook

    Outlook Rising Production Rising Margins Rising Prices? • Organic growth profile to ca. • Group margins expected to • Petra rough diamond prices 5 million carats go from +30% to +50% (FY up ca. 10% Jan to Apr 2014; 2019) firmer market conditions expected to end FY 2014 • Management of unit costs – •

  14. Slide 14: Integrated Approach to Sustainability

    Integrated Approach to Sustainability Safety 1.2 1 Safety of employees is top 0.8 priority for management 0.6 Petra striving for 0.4 zero harm across its operations 0.2 Left: Petra’s LTIFR 0 Rate FY 2010 FY 2011 FY 2012 FY 2013 Q3 FY 2014 Striving for the highest standards Employee and Community Hea

  15. Slide 15: Appendix

    The Cullinan mine in South Africa Appendix

  16. Slide 16: Capital Structure

    Capital Structure High Quality Share Register PDL Share Price (blue) vs FTSE 350 Mining % ISC (as at 30 April 2014) (1 year) Al Rajhi Holdings W.W.L. 13.0% Saad Investments Company Ltd / AWAL Bank 11.9% T. Rowe Price 10.2% JP Morgan Asset Management Holdings Inc. 7.8% Listing LSE: PDL BlackRock Inve

  17. Slide 17: Significant Diamond Producers

    Significant Diamond Producers Majors: Mid cap: LSE: PDL (FTSE 250) TSX: DDC TSX: LUC LSE: GEMD Market cap: US$1,453m¹ Market cap: US$1,061m¹ Market cap: US$645m¹ Market cap: US$378m¹ Assets: five producing mines; Assets: two producing mines Assets: one producing mine; Assets: one producing mine; exp

  18. Slide 18: The Petra Board

    The Petra Board Adonis Pouroulis (43) Johan Dippenaar (56) David Abery (51) Jim Davidson (68) Non-Executive Chairman CEO Finance Director Technical Director Successful mining entrepreneur One of South Africa’s most successful Extensive experience as Chief Financial Acknowledged world authority on Fo

  19. Slide 19: Petra's Growth Path

    Petra’s Growth Path • Petra has acquired five non-core diamond mines from De Beers (four in South Africa, one in Tanzania) • Group resource base of 309.6 million carats² worth ~US$55.0 billion³ (at 30 June 2013) July 2007 July 2008 February 2009 May 2010 September 2011 Koffiefontein Cullinan William

  20. Slide 20: Production and Revenue – FY 2013 vs FY 2019

    Production and Revenue – FY 2013 vs FY 2019 Gross Production Gross Revenue FY 2013 actual: 2.67 million carats FY 2013 actual: US$402.7 million 33% 33% 41% 53% Cullinan Williamson 6% 10% Koffiefontein 4% 1% 8% 4% 3%4% Kimberley Underground Fissure Mines FY 2019: ca. 5 million carats¹ FY 2019: ca. US

  21. Slide 21: FY 2013 – Key Performance Indicators

    FY 2013 – Key Performance Indicators Revenue Profit from Mining Activity¹ Adjusted EBITDA² Adjusted operating cashflow³ US$M US$402.7m US$M US$136.8m US$M US$122.4m US$132.8m +27% +34% +36% US$M +57% 450 160 140 150 400 140 120 130 350 120 100 110 300 100 90 250 80 80 70 200 60 60 50 150 40 40 30 10

  22. Slide 22: Q3 FY 2014 Production and Sales Summary

    Q3 FY 2014 Production and Sales Summary Unit Nine months to Nine months to Variance 31 March 2014 31 March 2013 Production ROM diamonds Carats 1,623,304 1,466,769 +11% Tailings and alluvial diamonds Carats 755,836 427,998 +77% Total diamonds Carats 2,379,140 1,894,767 +26% Sales Diamonds sold Carats

  23. Slide 23: Summary of Financial Results

    Summary of Financial Results H1 FY 2014 FY 2013 FY 2012 (US$m) (US$m) (US$m) Revenue 185.5 402.7 316.9 Adjusted mining and processing costs¹ (114.2) (270.3) (222.6) Other direct income 2.1 6.2 9.0 Profit from mining activity¹ 73.4 138.6 103.3 Exploration expense¹ (1.4) (4.8) (3.0) Corporate overhead

  24. Slide 24: FY 2013 – Operations Results

    FY 2013 – Operations Results Operation Finsch Cullinan Koffiefontein Kimberley UG Williamson (74%¹ Petra; 26% BEE) (74%¹ Petra; 26% BEE) (74%¹ & 2 Petra; 26% BEE) (74%¹ Petra; 26% BEE) (75% Petra; 25% Government of Tanzania) Total Production Tonnes treated (Mt) 5,210,546 3,861,012 4,080,893 3,172,67

  25. Slide 25: Falling Supply

    Falling Supply • Production fell 28% from 2005 (177 Mcts; Zimbabwe 0.2 Mcts) to 2012 (128 Mcts; Zimbabwe: 12.1 Mcts) • Success rate for finding an economic diamondiferous kimberlite is estimated to be <1% (De Beers) • No Tier 1 discoveries for 20 years, despite US$ billions spent on exploration in 1

  26. Slide 26: Growing Demand

    Growing Demand Per capita consumption of key commodities: • Demand growth driven by urbanisation and growing middle China relative to the US “steady state” classes in emerging markets, as well as continued economic recovery in major US market • Additional 1.3bn people to attain middle income status

  27. Slide 27: Current Rough Diamond Market

    Current Rough Diamond Market • Rough diamond market had strong start to calendar 2014 – prices achieved by Petra up ca. 10% • Firm market conditions in H2 further to solid seasonal sales, indicators of increasing global economic confidence, restocking of inventories and cautious optimism from Petra

  28. Slide 28: Consistent Production of Specials

    28 Date of acquisition 2013 2011 2009 2007 2005 2003 2001 1999 1997 1995 1993 +100 and +200 carat stones recovered at Cullinan 1991 1989 1987 1985 1983 1981 1979 1977 1975 1973 1971 Consistent Production of Specials +200 1968 1966 +100 1964 1962 1960 1958 1956 1954 1952 1950 1931 1929 1927 1925 1923

  29. Slide 29: H1 FY 2014 Operating Costs

    H1 FY 2014 Operating Costs • On-mine cash costs decreased by 8% in US$ terms: On-mine cash cost make-up • SA operations costs increased in ZAR terms by ca. 7% 11%, mainly due to increased production and 14% inflationary pressures 40% • Offset by weakening ZAR vs USD (R10.07 average for H1 FY 2014 vs

  30. Slide 30: Finsch – Development Programme

    Finsch – Development Programme Expansion Plan – to take 2,953 metres of SLC tunnels developed to date (out of 10,072 metres in total) production to c.1.8 Mctpa by FY 2016 and c.2.0 Mctpa from FY 2017 Dedicated conveyor ore-handling system • Mining currently taking place in Block 4 at 630m – FY 2014

  31. Slide 31: Cullinan – Development Programme

    Cullinan – Development Programme Expansion Plan – to take 7,068 metres of tunnels developed to date (out of 24,575 metres in total) production to c. 2.2 Mctpa by FY 2019 (2.0 Mctpa ROM & 0.2 Mctpa tailings) • Commenced rehabilitation of Current Infrastructure Men & Material BA5 areas at 645m to crea

  32. Slide 32: Kimberley Underground – Development Programme

    Kimberley Underground – Development Programme Expansion Plan – to Kimberley Underground Kimberlite Pipes Schematic maintain annual production of c. 130,000 ctpa • Construction and commissioning of plants at both Joint Shaft and BULTFONTEIN Wesselton Shaft – completed in FY 2013 • Substantial stockpi

  33. Slide 33: Koffiefontein – Development Programme

    Koffiefontein – Development Programme Expansion Plan – to take Koffiefontein Kimberlite Pipe Schematic production to c. 105,000 ctpa by FY 2017 • ROM production supplemented by ore from Ebenhaezer open pit (~5ha) – FY 2014 to FY 2016 • Installation of SLC from 560m to 580m – FY 2014 to FY 2015 • SLC

  34. Slide 34: Williamson – Development Programme

    Williamson – Development Programme Expansion Plan – to take Williamson Kimberlite Pipe Schematic production to c. 300,000 ctpa by FY 2017 • Production resumed further 1km to the enhanced rebuild of N plant – Q4 FY 2012 • Successful ramp-up of production to 2.7 Mt – FY 2013 LOM Pit Shell • Re-crush c

  35. Slide 35: Debt Facilities

    Debt Facilities • Nov 2012: new debt facilities put in place of ca. US$213 million¹ with Absa, RMB (FNB) and IFC • An increase and optimisation of Petra’s prior debt structures (previously ca. US$138 million ) Lender Type Size Interest Rate Repayment Absa & Amortising term facility US$76.0 JIBAR + 4

  36. Slide 36: Capex Profile

    Capex Profile Financial Year 2013A 2014F 2015F 2016F 2017F 2018F 2019F Operation Finsch ROM tonnes treated (Mt) 2.6 2.8 2.9 3.2 3.2 3.2 3.2 Tailings tonnes treated (Mt) 2.6 2.6 3.0 3.0 3.0 3.0 3.0 Expansion Capex (ZARm) 296.1 512.3 422.2 346.9 467.9 403.0 354.3 Sustaining Capex (ZARm) 93.7 132.7 115

  37. Slide 37: South Africa and Tanzania

    South Africa and Tanzania South Africa Tanzania Corporate tax 28% 30% Diamond royalty Formula based on profitability of 5% of turnover mining operation; 0.5% up to 7% of turnover Rough diamond export levy 5%, certain exemptions apply; n/a Petra sells all SA goods in Joburg State Diamond Trader Petra

  38. Slide 38: Further enquiries: Petra Diamonds

    The Cullinan mine in South Africa Further enquiries: Petra Diamonds Cathy Malins [email protected] +44 20 7494 8203 www.petradiamonds.com

Petra Diamonds — RBC African Mining Conference 2014 on 6ix