Vendetta Mining Corp. · TSXV:VTT

Vendetta Mining — Investor Presentation (November 2022)

29 slides from Vendetta Mining's investor presentation, November 2022

  1. Slide 1: Advanced Lead-Zinc Resource Development in Australia

    Advanced Lead-Zinc Resource TSX-V : VTT Development in Australia November 2022

  2. Slide 2: Important Information

    Important Information Cautionary Statement on Forward Looking Information This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publ

  3. Slide 3: Investment Highlights

    Investment Highlights • 100% Ownership of Pegmont Lead-Zinc Project • Queensland Australia - top rated mining jurisdiction • To date +3 x increase in resource, 5.8 million tonnes Indicated & 8.3 Mt Inferred, driven by strong geological understanding • Multiple exploration targets • 2019 PEA a 10 yea

  4. Slide 4: The Premier Base Metals Address in Australia

    The Premier Base Metals Address in Australia Mt Isa – McArthur River Proterozoic Inliers are one of the worlds premier mineral provinces with several world class Zinc / Lead & Silver deposits and significant Copper and Copper-Gold deposits. World Class Lead - Zinc - Silver Deposits / Mines McArthur

  5. Slide 5: 2022/2023 Planned Programs

    2022/2023 Planned Programs • Drilling to obtain fresh core samples for pilot scale XRT material sorting from Zone 1 transition, Zone 2-3 sulphide and Bridge Zone sulphide. • Conduct locked cycle metallurgical flotation tests on the sorted products. • Exploration drilling testing identified near proj

  6. Slide 6: Mineral Resources (Million Tonnes)

    Mineral Resource July 31, 2018 Area Classification Material type Tonnes (kt) Pb % Zn % Ag g/t Resource Growth 16 Sulphide-Inferred Transition 1,111 4.9 2.3 8 Sulphide-Indicated Indicated Sulphide 4,003 6.5 2.6 11 Transition-Indicated Open Pit TOTAL 5,114 6.2 2.6 11 14 Transition-Inferred Mineral Res

  7. Slide 7: Resource Expansion

    Resource Expansion Select High Grade Intersections NOT in Current Mineral Resource Zone 3 Sulphide  PVRD170 5.00 m @ 9.78% Pb, 3.31% Zn, 13 g/t Ag  PVRD194 9.02 m @ 9.05% Pb, 3.80% Zn, 14 g/t Ag Zone 5 Sulphide  PVRD194 9.02 m @ 9.05% Pb, 3.80% Zn, 14 g/t Ag  PVRD196 8.42 m @ 7.07% Pb, 5.98% Zn,

  8. Slide 8: PEA - Significant Value Levers Identified

    PEA - Significant Value Levers Identified • Tax Cuts : Australian Federal Announced Corporate Tax Reduction – a phased reduction from Diamond Core VS RC 30% to 25%, will be captured in future study updates, improving after tax NPV & IRR • Ore sorting test work : the potential to reduce CAPEX, and OP

  9. Slide 9: Metal Prices – Robust & Sustained

    Metal Prices – Robust & Sustained $2.20 LME Zn US$/lb Cash LME Pb US$/lb Cash $2.00 $1.20 PEA Base Case $1.09 PEA Base Case $0.95 $1.80 $1.60 $1.00 $1.40 $1.20 $0.80 $1.00 $0.80 $0.60 $0.60 • PEA Base Case significantly lower than current metal prices • Zinc prices near decade highs, Lead consistent

  10. Slide 10: Material Sorting – 2020 Test Work

    Material Sorting – 2020 Test Work • Three highly successful preliminary Material Sorting tests completed on Zone 2 (1) and Zone 5 (2) sulphide intersections at TOMRA, Sydney. Test work results on page 23 • The tests indicated that the XRT material sorter is capable of removing external dilution, sep

  11. Slide 11: Exploration – Pegmont

    Exploration – Pegmont Bridge Zone Extensions The highest grade zone, was a structural target discovered by Vendetta. Test possible folded or faulted down thrown block to south east block. Wills Zone The “unfolded” position would place the Wills Zone as a down dip extension of Zone 5, supported by Pb

  12. Slide 12: Exploration – Killer Bore High Grade Zinc

    Exploration – Killer Bore High Grade Zinc • Option to acquire 100% by spending A$602,000 over 3 years, Sandfire to retain 2% NSR Royalty • Same style of mineralisation seen at Pegmont, interpreted to be a distal portion of the same system, closer to the vent as witnessed by high Zn, Cu and in most c

  13. Slide 13: Pegmont PEA - A Sound Basis to Enhance & Optimise

    Pegmont PEA - A Sound Basis to Enhance & Optimise 3D view of the PEA production areas, looking towards the North West • 10 year mine life @ 3,000 tpa (1.1 Mtpa) • 10.6 Mt Mining inventory 84% Open Pit, 16% Underground Inclined Room & Pillar • BHZ, Main 1 & Main 2-3 used for tails storage to reduce f

  14. Slide 14: Corporate Structure

    Corporate Structure Shares Issued and Outstanding* 300,964,083 Warrants ($0.06 | exp. May & June 2023) 19,388,188 Warrants ($0.09 | exp. Nov. & Dec. 2023) 7,541,772 Warrants ($0.09 | exp. Feb. 2024) 5,216,667 Warrants ($0.07 | exp. Aug. & Oct. 2024) 9,282,720 Fully Diluted 342,393,430 Shareholders (

  15. Slide 15: Senior Management and Board of Directors

    Senior Management and Board of Directors Michael Williams - President, CEO, Director Capital markets and communications. Raised significant capital funds for advanced exploration and development projects. Peter Voulgaris - Director, Qualified Person B.Eng.(Hons), MEngSci. MAusIMM, MAIG Geology & Min

  16. Slide 16: APPENDICES

    APPENDICES • Project Comparisons • Pegmont Geology • Metallurgy & Material Mt Isa, Concentrate Rail Cars Mapping at Pegmont Sorting Test Work • PEA Details Pegmont Lead Flotation Test Townsville Deepsea Port www.vendettaminingcorp.com | TSXv : VTT 16

  17. Slide 17: Clear Rerating Potential – ASX listed Peers

    Clear Rerating Potential – ASX listed Peers Vendetta Mining Corp. Boab Metals Ltd. Galena Mining Ltd. Project: 100% of Pegmont Lead-Zinc Project Project: 75% of Sorby Hills Lead Project Project: 60% of Abra Lead Project Market Capitalization: C$13.5M Market Capitalization: A$33.8M Market Capitalizat

  18. Slide 18: Pegmont Geology

    Pegmont Geology • Broken Hill Type Deposit : Mid Proterozoic stratiform, banded iron formation and Coarse Sphalerite – garnet rich quartzite host, lead zinc metal zonation Zone 2 Sulphide • Galena and Sphalerite mineralisation, banded semi massive to massive • Country rock is a high grade metamorphi

  19. Slide 19: Pegmont Geology

    Pegmont Geology Simplified Geology Map of Pegmont Bridge Zone Cross Section Looking South East, see map page 23 for location www.vendettaminingcorp.com | TSXv : VTT 19

  20. Slide 20: Pegmont Geology

    Pegmont Geology Zones 1,2 & 3 Cross Section Looking North East, see map page 22 for location www.vendettaminingcorp.com | TSXv : VTT 20

  21. Slide 21: Metallurgy Test Work

    Metallurgy Test Work ALS Metallurgy Flotation Test Work Material Sorting Preliminary Test Work Bond Ball Head Grades Lead Circuit Zinc Circuit Mill Work (diluted) Area Test Type Index Pb Recovery Pb Con. Zn Recovery Zn Con. • Two holes from Zone 5, one hole from kWh/t Pb % Zn % Zone 2 % Grade % % Gr

  22. Slide 22: PEA Infrastructure

    PEA Infrastructure • Use of Osborne Mine Camp during construction of 300 person camp at Pegmont • Use of Osborne Mine Air Strip for Life of Operations • Concentrate transported in half height containers, Lead to Mt Isa by road and Zinc by road to Malbon where it is loaded onto train to Townsville •

  23. Slide 23: PEA Process flowsheet

    PEA Process flowsheet • GR Engineering Services design • Conventional sulphide base metal flotation flowsheet www.vendettaminingcorp.com | TSXv : VTT * 23

  24. Slide 24: PEA Results – A Sound Basis to Enhance & Optimise

    PEA Results – A Sound Basis to Enhance & Optimise Base Case Spot Case Pb US$0.94/lb, Zn US$1.09/lb, Pb US$0.91/lb, Zn US$1.18/lb, Ag US$16.50/oz, AUD:USD $0.75 Ag US$15.31/oz, AUD:USD $0.71 Pre-Tax Post Tax Pre-Tax Post Tax NPV at 8% $201M $124M $249M $158M IRR 31% 24% 37% 27% Payback Period (years)

  25. Slide 25: PEA After Tax Sensitivities

    PEA After Tax Sensitivities Net Present Value ($ million) at 8% Discount Lead Price Zinc Price ($ / lb) ($ / lb) 0.85 0.95 1.09 1.15 1.25 0.75 (24) (7) 16 26 43 0.85 32 49 72 82 99 0.94 84 101 124 134 151 1.05 147 164 187 197 213 1.15 204 221 244 254 270 Base Case Net Present Value Discount Rate Sen

  26. Slide 26: PEA Capital Expenditure & Cost

    PEA Capital Expenditure & Cost CAPITAL EXPENDITURE LIFE OF MINE OPERATING COST ESTIMATE Initial Sustaining Total Area Units Cost Area ($M) ($M) ($M) Open Pit Mining $/tonne mined $3.08 Site Infrastructure 39.6 1.2 40.8 (on and off site) Underground Mining $/tonne mined $50.00 Mineral Processing 69.9

  27. Slide 27: PEA Production Summary

    PEA Production Summary Tonnes Milled Zinc - Zn % Lead - Pb % Silver - Ag g/t 1,200,000 12.00 1,000,000 10.00 Diluted Feed Grade Tonnes Milled 800,000 8.00 600,000 6.00 400,000 4.00 200,000 2.00 - - 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 180,000,000 450,000 160,000,000 Zinc (lb) Lead (lb)

  28. Slide 28: PEA Proposed Pegmont Site Layout at Closure

    PEA Proposed Pegmont Site Layout at Closure ROM Pad Mine Office, Workshops & Fuel BHZ Pit & In-pit Tails Covered by Waste Dump Processing Plant Site & Natural Gas Power Station Pit Stages Main 4 to 7 Pit Stage Main 1 In-pit Waste Dump In-Pit Tails Storage Pit Stages Main 2 & 3 In-Pit Tails Storage R

  29. Slide 29: TSX-V : VTT

    Advanced Lead-Zinc Resource TSX-V : VTT Development in Australia www.vendettaminingcorp.com Phone : +1 604 484 7855

Vendetta Mining — Investor Presentation (November 2022) on 6ix