Slide 1: Stavely and Ararat Copper-Gold Projects, Western Victoria
Stavely and Ararat Copper-Gold Projects, Western Victoria Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 2: Who is Stavely Minerals?
Who is Stavely Minerals? Owned and managed by the ex-Integra Mining management team: Chris Cairns - Director Peter Ironside - Director Jennifer Murphy - Director Michelle Skinner The private company used to acquire The Stavely and Ararat Projects from BCD Resources (formerly Beaconsfield Gold Mines
Slide 3: Project Location
Project Location The Mount Stavely Volcanic Complex is considered a northern extension of the Mt Read Volcanics in Tasmania Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 4: Project Location
Project Location Total area owned and applied for tenure of 770 square kilometres Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 5: Mineral Resources
Mineral Resources (ready to be reported in compliance with JORC 2012) At the Ararat Project, hosted in Besshi-style VMS: 1.2Mt at 2.0% copper, 0.5 g/t gold, 0.4% zinc and 6 g/t silver for 30kt of contained copper At the Stavely Project hosted in a secondary chalcocite enriched blanket: 28Mt at 0.4%
Slide 6: What did BCD sell?
What did BCD sell? Two near production copper projects with a Scoping Study completed. Envisaged a crusher / sulphide concentrator at Stavely High-grade copper-gold feed from Mt Ararat VMS blended with low-grade feed from Thursday’s Gossan chalcocite Rail to port through the project area 62Mw wind f
Slide 7: Scoping Study Update
Scoping Study Update Stavely Minerals plan to update the previous Scoping Study: Previous Scoping Study identified an opportunity to beneficiate the mineralisation in the chalcocite enriched blanket by washing out kaolin clays prior to sulphide concentration Drill twin holes at the Thursday’s Gossan
Slide 8: Scoping Study Update
Scoping Study Update Chalcocite enriched sample after washing to remove kaolin clay fraction (red arrows point to chalcocite / covelite, other sulphides are pyrite and chalcopyrite – remainder is mostly quartz grains Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 9: Ararat Project
Ararat Project Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 10: Ararat Project
Ararat Project Hosts the Mt Ararat Besshi-style copper-gold VMS and the Langi Logan Stawell Gold Mine look- alike target Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 11: Ararat Project
Ararat Project Mt Ararat Besshi-style VMS – 1.2Mt at 2.0% copper, 0.5 g/t gold, 0.4% zinc and 6 g/t silver Open at depth and along strike Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 12: Ararat Project
Ararat Project Mt Ararat existing Mineral Resource is over 350m strike extent at the southern end of a 4 kilometre long airborne VTEM conductor and coincident soil copper-zinc anomalism Ground EM confirms significant undrilled extensions to the north of the existing resource Copyright © 2013 www.sta
Slide 13: Stawell Gold Mine
Stawell Gold Mine Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 14: Stawell Gold Mine
Stawell Gold Mine Not a nuggety Bendigo / Ballarat ‘ladder reef’ type mine A much more continuous style of contact mineralisation = very consistent production = far more desirable! Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 15: Langi Logan
Langi Logan Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 16: Proposed work programmes for the Ararat Project
Proposed work programmes for the Ararat Project At the Mt Ararat VMS prospect, drill ground EM conductors 3.5 kilometres along strike to the north of the existing resources 5,000 metres of RC drilling 2,000 metres of diamond drilling At the Langi Logan gold prospect Three lines of IP to confirm loca
Slide 17: Ararat Project
Ararat Project Other targets Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 18: Stavely Project
Stavely Project Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 19: Stavely Project
Stavely Project Thursday’s Gossan chalcocite enriched blanket - 28Mt at 0.4% copper Thursday’s Gossan porphyry Junction 1 porphyry Newly interpreted Mt Stavely porphyry Fairview Gold prospect Wickliffe VMS prospect Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 20: Stavely Project
Stavely Project Mt Stavely Volcanic Complex considered the northern extension of the Mt Read Volcanics in Tasmania MRV hosts the Mount Lyell, Rosebery, and Henty copper- gold deposits In the Thursday’s Gossan area a very major intersection of N-S and NW oriented structures Copyright © 2013 www.stave
Slide 21: Stavely Project
Stavely Project Thursday’s Gossan Chalcocite blanket and location of porphyry intrusion at depth controlled by long-lived structures Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 22: Stavely Project
Stavely Project Thursday’s Gossan Chalcocite - less than 1:1 strip ratio Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 23: Stavely Project
Stavely Project Porphyry intrusions at depth appear as lows in the gravity images Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 24: Stavely Project
Stavely Project Junction 1 porphyry target – lightly drilled to shallow depth yet 35 metres at 3.9% copper hard to ignore Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 25: Stavely Project
Stavely Project Note the low beneath Mt Stavely – a newly inferred porphyry at depth The 5 kilometre long Fairview gold prospect is associated with pale yellow sphalerite and adularia K- spar alteration indicating a peripheral low-sulphidation epithermal style Copyright © 2013 www.stavely.com.au All
Slide 26: Stavely Project
Stavely Project Stavely Minerals bought these projects primarily for the exploration upside A significant factor was that previous explorers had failed to recognise the high- level of exposure – ie. The porphyry was down deeper than existing drilling Copyright © 2013 www.stavely.com.au All Rights Re
Slide 27: Stavely Project
Stavely Project Significant drill intercepts into ‘leakage’ structures ‘D’ veins in the porphyry terminology of Gustafson and Hunt, 1975 7.7 metres at 4.14% copper, 1.08 g/t gold and 77g/t silver 9.5 metres at 2.93% copper, 0.44g/t gold and 42 g/t silver Copyright © 2013 www.stavely.com.au All Right
Slide 28: Stavely Project
Stavely Project La Trobe University Honours thesis uncovered Completed in 1996 PIMA analysis of existing aircore drill chips and diamond drill core Demonstrated a high-level of exposure for the Thursday’s Gossan porphyry with a vertically preserved and classically concentric zoned alteration pattern
Slide 29: Stavely Project
Stavely Project CSIRO developed HyLogger for quantitative mapping of alteration minerals in drill core HyLogger data collected for 11 diamond drill holes in 2009 but never processed Data provided to Scott Halley of Mineral Mapping Pty Ltd for processing and analysis Copyright © 2013 www.stavely.com.
Slide 30: Stavely Project
Stavely Project “The HyLogger data certainly supports the hypothesis that the level of exposure tested by previous drilling is analogous to the top of a Prince Lyell system. This system should be drilled to a depth of 200 to 300 meters below the zones of shortest wavelength white mica recorded from
Slide 31: Stavely Project
Stavely Project Porphyry experts Corbett and Menzies Consulting engaged to review all available drill core for the Stavely Project Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 32: Level of exposure of Thursday's Gossan
Level of exposure of Thursday’s Gossan “The multi-phase intrusions, multi- generations of quartz veins and strong hydrothermal alteration zonation apparent at the Thursdays Gossan project are indicative of the mineralisation and alteration recognised above many large SW Pacific rim porphyry copper-g
Slide 33: Evidence of untested porphyry Cu-Au mineralisation at depth
“Therefore there is strong evidence indicating that there is untested porphyry Cu- Au style mineralisation at depth below the Thursday Gossan project area.” Corbett and Menzies Consulting 2013 Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 34: The Cadia-Ridgeway Discovery History
The Cadia-Ridgeway Discovery History1 1Discovery of the Cadia Ridgeway Gold-Copper Porphyry Deposit, Holliday, J. et al., SMEDG, 1999 Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 35: The Cadia-Ridgeway Discovery History
The Cadia-Ridgeway Discovery History1 1Discovery of the Cadia Ridgeway Gold-Copper Porphyry Deposit, Holliday, J. et al., SMEDG, 1999 Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 36: The Cadia-Ridgeway Discovery History
The Cadia-Ridgeway Discovery History1 1Discovery of the Cadia Ridgeway Gold-Copper Porphyry Deposit, Holliday, J. et al., SMEDG, 1999 Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 37: The Cadia-Ridgeway Discovery History
The Cadia-Ridgeway Discovery History1 1Discovery of the Cadia Ridgeway Gold-Copper Porphyry Deposit, Holliday, J. et al., SMEDG, 1999 Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 38: The Cadia-Ridgeway Discovery History
The Cadia-Ridgeway Discovery History1 Approximate depth of drilling at Thursday’s Gossan 1Discovery of the Cadia Ridgeway Gold-Copper Porphyry Deposit, Holliday, J. et al., SMEDG, 1999 Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 39: The Cadia-Ridgeway Discovery History
The Cadia-Ridgeway Discovery History1 1Discovery of the Cadia Ridgeway Gold-Copper Porphyry Deposit, Holliday, J. et al., SMEDG, 1999 Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 40: Our View
Our View The primary contention is that previous explorers failed to recognise the high level of exposure of the Thursday’s Gossan porphyry complex and that the potential for well-mineralised copper-gold porphyry(s) at depth is excellent. The Stavely area is compared to the Cadia Valley and Goonumbl
Slide 41: Thursday's Gossan Long Section (looking west)
Thursday’s Gossan Long Section (looking west) 8m @ 2.4% Cu, 1.1 g/t Au 69m @ 0.17% Cu 180m @ 0.16% Cu 7.7m @ 4.1% Cu, 1.0 g/t Au 96m @ 0.14% Cu 10m @ 0.74% Cu 9.5m @ 3.0% Cu, 0.4g/t Au 1.75km 35m 110kt copper @ 0.23% Cu Thursda 235m @depth Approximate 0.21% Cu to date of drilling 28m @Depth 0.24% an
Slide 42: Proposed work programmes for the Stavely Project
Proposed work programmes for the Stavely Project Almost all diamond drilling to date (except 2 holes) is to a maximum true depth of ~250m – not deep enough to discover Cadia Ridgeway or Cadia East At the Thursday’s Gossan area (including Drysdale, Junction 1 and Junction 3), propose drilling: 15 x 7
Slide 43: Stavely Project
Stavely Project Other targets: Patanga porphyry target – drill intercept of 10 metres at 0.32% copper and 0.4 g/t gold Wickliffe VMS target – drill intercept of 3.15 metres at 2.27 g/t gold, 4.9% zinc, 0.2% copper and 7 g/t silver Copyright © 2013 www.stavely.com.au All Rights Reserved
Slide 44: What do we want to do with these projects?
What do we want to do with these projects? Public listing on the ASX: Seeking an industry cornerstone investor to take an equity position Seeking an institutional cornerstone investor to take an equity position Plan to vend Stavely Minerals into a listed shell for script – no cost recovery Looking t
Slide 45: Work Programmes
Work Programmes Metallurgical testwork on beneficiating chalcocite blanket mineralisation by washing out clays Twin drilling of chalcocite blanket drill holes to validate sampling and assays Immediate drill testing of EM conductors north of existing resource at Mt Ararat – Carroll’s Cutting and Sout
Slide 46: Thank You
Thank You Contact Us: Stavely Minerals Pty Ltd Level 1, 168 Stirling Highway Nedlands WA 6009 www.stavely.com.au Ph: 08 9287 7630 Copyright © 2013 www.stavely.com.au All Rights Reserved