Elia Group SA/NV — Technical Presentation (April 2018)

4 slides from Elia Group SA/NV's technical presentation, Apr 27, 2018

  1. Slide 1: ARP contract

    ARP contract WG Belgian Grid – 27.04.2018

  2. Slide 2: BRP Contract timeline and ARP contract versions

    201 201 8 9 Mar Today May Jul Sep Nov 2019 Mar BRP Contract 15/3 – 15/5 Submission V1.1 Submission V 1.2 6/18 Public cons. T&C BRP V1.1 Public cons. T&C BRP V1.2 Expected EIF • No content changes compared to version last • Imposed by E&R: related to Market T&C BRP of ARP contract suspension/restorat

  3. Slide 3: Changes in the ARP contract

    Changes in the ARP contract New GB-BE border with go New ARP Status ToE + SDR live of Nemo Link “ARP Offshore Interconnector” Interconnector Import/Export on the BE-GB Balancing Obligation for Nemo Link: Transfer of Energy: border  Symmetrical set-up: balancing obligation  ToE for Reserved mFRR fo

  4. Slide 4: Many thanks for your attention!

    Many thanks for your attention! ELIA SYSTEM OPERATOR Boulevard de l'Empereur 20 1000 Brussels +32 2 546 70 11 info@ elia.be www.elia.be An Elia Group company