    2018 Customer Forum May 9, 2018 5/9/2018

  2. Slide 2: Agenda

    Slide 2: Agenda

    Agenda • Introductions • Antitrust Disclaimer • High OFO Review • Low OFO Review • System Reliability Support Activity Results • Post Forum Report / Next Steps 2

  3. Slide 3: Antitrust Disclaimer

    Slide 3: Antitrust Disclaimer

    Antitrust Disclaimer ti SoCalGas A B sempra Energy utility 3 Glad to be of service.”

  4. Slide 4: American Gas Association Antitrust Compliance Guidelines

    Slide 4: American Gas Association Antitrust Compliance Guidelines

    AMERICAN GAS ASSOCIATION ANTITRUST COMPLIANCE GUIDELINES Introduction ‘The American Gas Association and its member companies are committed to full compliance with all laws and regulations, and to maintaining the highest ethical standards in the way we conduct Responsibility for Antitrust Compliance

  5. Slide 5: Recording of this Customer Forum is prohibited

    Slide 5: Recording of this Customer Forum is prohibited

    Recording of this Customer Forum is prohibited 5

  6. Slide 6: High OFO Review

    Slide 6: High OFO Review

    High OFO Review ti SoCalGas A B sempra Energy utility 6 Glad to be of service.”

  7. Slide 7: High Operational Flow Order (High OFO)

    Slide 7: High Operational Flow Order (High OFO)

    High Operational Flow Order (High OFO) • A High OFO is declared when SoCalGas determines that expected receipts will exceed total forecasted system capacity (including storage injection capacity and latest off‐system scheduled quantities) for a pending flow day. • SoCalGas uses the on‐system schedul

  8. Slide 8: Scheduled Quantities Used for High OFO

    Slide 8: Scheduled Quantities Used for High OFO

    Scheduled Quantities Used for High OFO Scheduled Quantity • On High OFO days, SoCalGas will Used for High OFO confirm nominations up to the total net Cycle Calculation system capacity for Intraday 1 (Cycle Prior Day, 3), Intraday 2 (Cycle 4), and Intraday 3 Timely Evening Cycle (Cycle 5); [and durin

  9. Slide 9: High OFO Review: April 2017 – March 2018

    Slide 9: High OFO Review: April 2017 – March 2018

    High OFO Review: April 2017 – March 2018 • 112 High OFO events during Report Period. • 14% increase compared to previous reporting period. • High OFO procedures will change after the Aliso Canyon Turbine Replacement Project goes into service. • TCAP Phase 1 Settlement condition. • See SoCalGas Advic

  10. Slide 10: High OFO Comparison

    Slide 10: High OFO Comparison

    High OFO Comparison 2017 Forum Report 2018 Forum Report Cycle 1 52 Cycle 1 27 Cycle 2 14 Cycle 2 28 Cycle 3 24 Cycle 3 37 Cycle 4 08 Cycle 4 20 Total 98 Total 112 10

  11. Slide 11: Low OFO Review

    Slide 11: Low OFO Review

    Low OFO Review ti SoCalGas A B sempra Energy utility rr Glad to be of service.”

  12. Slide 12: Low Operational Flow Order (Low OFO)

    Slide 12: Low Operational Flow Order (Low OFO)

    Low Operational Flow Order (Low OFO) • A Low OFO is declared if, on a day prior to this Gas Day, in the sole judgment of Gas Control, the system forecast of storage withdrawal used for balancing exceeds the withdrawal capacity allocated to the balancing function. 12

  13. Slide 13: Low OFO Review: April 2017 – March 2018

    Slide 13: Low OFO Review: April 2017 – March 2018

    Low OFO Review: April 2017 – March 2018 Stages Declared • Stage 1 37 • Stage 2 47 • Stage 3 17 • Stage 4 2 Total 103 Tolerance Percentages Declared • All Low OFOs were declared with a -5% Daily Imbalance Tolerance. 13

  14. Slide 14: Low OFO Comparison

    Slide 14: Low OFO Comparison

    Low OFO Comparison 2017 Forum Report 2018 Forum Report Cycle 1 ‐‐‐ Cycle 1 ‐‐‐ Cycle 2 67 Cycle 2 72 Cycle 3 39 Cycle 3 31 Cycle 4 ‐‐‐ Cycle 4 ‐‐‐ Total 106 Total 103* *The Ninth Annual Report of System Reliability Issues (2018 Customer Forum Report) stated an incorrect count of 102. 14

  15. Slide 15: OFO Day Scheduled Quantity Adjustments

    Slide 15: OFO Day Scheduled Quantity Adjustments

    OFO Day Scheduled Quantity Adjustments • Scheduled quantities can be traded from one Balancing Agent to another Balancing Agent for any OFO day. • California Producer pools can trade scheduled quantities with other California Producer pools. • A scheduled quantity adjustment (SQA) is not an imbalanc

  16. Slide 16: Number of SQAs Processed

    Slide 16: Number of SQAs Processed

    OFO Day Scheduled Quantity Adjustments (Number of SQAs Processed) 300 250 Number of SQAs Processed 200 150 100 50 ‐ 16

  17. Slide 17: Total Scheduled Quantities Processed (dth)

    Slide 17: Total Scheduled Quantities Processed (dth)

    OFO Day Scheduled Quantity Adjustments (Total Scheduled Quantities Processed) 1,000,000 900,000 800,000 Total Scheduled Quantities Processed (dth) 700,000 600,000 500,000 400,000 300,000 200,000 100,000 ‐ 17

  18. Slide 18: OFO Day Scheduled Quantity Adjustments

    Slide 18: OFO Day Scheduled Quantity Adjustments

    OFO Day Scheduled Quantity Adjustments • The OFO day SQAs are a time consuming, manual process. • SQA requests for a given gas day must be submitted by both counterparties no later than 9 PM Pacific Time the next business day. • Each Balancing Agent involved in an SQA must have a scheduled quantity

  19. Slide 19: System Reliability Support Activity Results

    Slide 19: System Reliability Support Activity Results

    System Reliability Support Activity Results 19

  20. Slide 20: Southern System Reliability Purchases and Interruptible BTS Discounts

    Slide 20: Southern System Reliability Purchases and Interruptible BTS Discounts

    Southern System Reliability (SSR) Purchases and Interruptible BTS Discounts 2010‐ 2011‐ 2012‐ 2013‐ 2014‐ 2015‐ 2016‐ 2017‐ 2011 2012 2013 2014 2015 2016 2017 2018 Purchases (MDth) 1,045 3,015 16,989 42,879 31,311 33,309 45,349 13,354 Net Cost ($/Dth) 3.63 0.36 0.37 0.36 0.13 0.10 0.20 0.07 SRMA Cos

  21. Slide 21: April 2017 - March 2018 Southern System Deliveries

    Slide 21: April 2017 - March 2018 Southern System Deliveries

    April 2017 - March 2018 Southern System Deliveries MM Hub Baseload Purchases WB Hub Spot Purchases Total Deliveries — Minimum Flow Requirement 1,400,000 1,200,000 1,000,000 800,000 Dth 600,000 400,000 200,000 Glad to be of service.” So Ca IGas A B sempra Energy utility 21

  22. Slide 22: Post-Forum Report / Next Steps

    Slide 22: Post-Forum Report / Next Steps

    Post-Forum Report / Next Steps 22

  23. Slide 23: Post-Forum Report / Next Steps

    Slide 23: Post-Forum Report / Next Steps

    Post-Forum Report / Next Steps • The Post-Forum Report will summarize the matters discussed here; identify action items, tariff changes, and procedural modifications that we agree are necessary; include descriptions of proposals presented by meeting participants. • Any proposals made that are reject

  24. Slide 24: Storage Injection Enhancement Plan

    Slide 24: Storage Injection Enhancement Plan

    Storage Injection Enhancement Plan • Beginning on Gas Day April 9, 2018, portions of the storage injection capacity allocated to the system balancing function have been available for nomination on Timely Cycle. • The Net Storage Injection capacity will vary throughout the day based on the System Ope

  25. Slide 25: Summer 2018 Outlook Summary

    Slide 25: Summer 2018 Outlook Summary

    Summer 2018 Outlook Summary • SoCalGas expects its current pipeline outages to extend through at least the peak EG summer demand period. • With these pipeline outages, SoCalGas will be challenged to fill storage inventory for the upcoming winter season. • Insufficient receipt capacity to both serve

  26. Slide 26: 2018 Summer Peak Demand Forecast

    Slide 26: 2018 Summer Peak Demand Forecast

    2018 Summer “Peak” Demand Forecast CUSTOMER TYPE SUMMER DEMAND (BCFD) Core 0.770 Noncore, Non‐Electric Generation 0.770 Noncore Electric Generation (EG) 1.971 Total 3.511 • Average core/non-EG noncore summer demand. • SoCalGas EG demand forecast derived from 2017 peak summer demand. • CAISO/LADWP te

  27. Slide 27: SoCalGas Summer Receipt Capacity

    Slide 27: SoCalGas Summer Receipt Capacity

    SoCalGas Summer Receipt Capacity Receipt Point “Best Case” Supply “Worst Case” Supply (MMcfd) (MMcfd) Blythe 1,010 800 Otay Mesa 200 150 North Needles 270 0 Topock 0 0 Kramer Junction 600 700 Wheeler Ridge / Kern River 765 765 Station California Production 60 60 Total Pipeline Receipts 2,905 2,475 A

  28. Slide 28: SoCalGas Current System Outages

    Slide 28: SoCalGas Current System Outages

    SoCalGas Current System Outages 28

  29. Slide 29: Summer Storage Assessment (Non-Aliso)

    Slide 29: Summer Storage Assessment (Non-Aliso)

    Summer Storage Assessment (Non-Aliso) 45 1400 1300 40 1200 1100 35 Withdrawal Rate (MMCFD) 1000 30 Inventory (BCF) 900 800 25 700 20 600 500 15 400 300 10 200 5 100 0 0 6/1/2018 7/1/2018 8/1/2018 9/1/2018 10/1/2018 11/1/2018 Best INV Worst INV Best WD Worst WD IEP WD REQ • “Best Case” pipeline suppl

  30. Slide 30: Maintaining Summer Energy Reliability

    Slide 30: Maintaining Summer Energy Reliability

    Maintaining Summer Energy Reliability • SoCalGas remains focused on increasing its storage inventory. • Advice Letter 5275-A filed April 20, 2018 to further enhance storage injection capability to increase inventory. • SoCalGas will continue to coordinate operations with CAISO and LADWP. • SoCalGas

  31. Slide 31: SoCalGas

    Slide 31: SoCalGas

    ( SoCalGas NY Sempra Energy utility Glad to be of service.°