T7 Global Berhad · MYX:T7GLOBAL
T7 Global Berhad — Q2 2022 Earnings Presentation
10 slides from T7 Global Berhad's earnings presentation, August 2022
Slide 1: T7 Global Berhad Q2 FYE2022 Results Briefing
T7 GLOBAL BERHAD WITH T7 GLOBAL l August 2022 Q2 FYE2022 Results Briefing Making A Difference T7 Global - All Rights Reserved. ENERGY | AEROSPACE & DEFENCE | CONSTRUCTION
Slide 2: Corporate Snapshot
Corporate Snapshot Integrated Energy Solutions Provider Syariah Compliant Listed on Main Market of WITH Aerospace Metal Surface Treatment > 50% Bumiputra Shareholders Bursa Malaysia T7GLOBAL (7228) | T7GLOBAL-WC (7228WC) Infrastructure Construction Specialist Founded in 1990 Orderbook of RM2.2 billi
Slide 3: Business Overview
Business Overview Energy Aerospace and Defence Infrastructure Construction Oil & Gas Metal Surface Treatment • Infrastructure Construction • Engineering, Procurement and • Surface Enhancement & Cleaning • Specialised Facility Construction Construction • Chemical Processing • Operations & Maintenance
Slide 4: Financial Highlights
Financial Highlights Revenue (RM’mil) 8.0% 2.3% 1H FYE2022 v.s. 1H FYE2021 106.4 114.9 14.6% • The increase in PATAMI was mainly due to the 8.0% revenue growth, coupled with the higher PATAMI margin 54.2 62.0 53.0 achieved during the financial period under review. • The higher PATAMI margin mainly a
Slide 5: Financial Snapshot as at June 2022
Financial Snapshot as at 30 June 2022 RM849.8M RM271.3M RM578.5M Total Assets Total Equity Total Liabilities FYE21: RM829.3M FYE21: RM265.9M FYE21: RM563.4M WITH RM0.37 1.34x 1.53x Net Asset Per Share Current Ratio Net Gearing Ratio FYE21: RM0.35 FYE21: RM1.36x FYE21: 1.26x 5 ENERGY | AEROSPACE & DE
Slide 6: Key Contract
KEY CONTRACT Description Client : Petronas Carigali Sdn Bhd The BAYAN field development is located at Sub-block 4Q-21 of Balingian Province, Location : Bayan-Field, Sarawak about 80km NW of Bintulu MLNG in a water depth of approximately 30m. The WITH Duration : 2020 - 2032 existing hub comprises of
Slide 7: Tender Opportunities from PETRONAS
Tender Opportunities from PETRONAS Hook-up and Commissioning Maintenance, Construction and Number of Man-Hours (Millions): Modification Decommissioning of Wells Number of Man-Hours (Millions): 6.3 6.6 11.5 11.4 11.8 50 5.4 4.7 4.5 40 4.1 8.5 31 WITH 2.9 13 2021 2022E 2023E 2024E 2021 2022E 2023E 202
Slide 8: Growth Areas for Energy Assets
Growth Areas for Energy Assets • Focus efforts in bidding for floater Potential Projects opportunities in Southeast Asia • Target to complete 1 floater project Potential Projects Potential Projects every 2 years Bayan MOPU Potential Projects WITH Potential Projects 8 ENERGY | AEROSPACE & DEFENCE | C
Slide 9: T7 Future Plans
T7 Future Plans Energy Aerospace and Defence ESG Sustainability Framework • Build a sustainable base of • Achieve optimum utilization rate for our MST facility energy assets for long term • Venture into high tech manufacturing of Value Creation recurring income parts for automotive and electrical se
Slide 10: Thank You
C-16-01, Level 16, KL Trillion Corporate Tower, Block THANK YOU C, 338, Jalan Tun Razak, 50400, Kuala Lumpur, Malaysia [email protected] +603 2785 7777 DISCLAIMER: The material that follows is a presentation of information about the activities of T7 Global Berhad (including any other affiliates) as