  1. Slide 1: Powering the transition to a cleaner future

    Powering the transition to a cleaner future CORPORATE PRESENTATION - SUMMARY E-Tech Resources are exploring for the rare earth elements necessary to drive the global transition to clean energy TSXV: REE |}: FSE: K2i

  2. Slide 2: Forward-looking statements

    Statements in this Presentation or otherwise regarding the Company’s or its management’s intentions, believes or expectations, or that otherwise speak to future events, are “forward-looking statements”. Forward-looking statements may be identified by terminology including “could”, “may”, “will”, “sh

  3. Slide 3: Why neodymium?

    High-Strength Neodymium Magnets (NdFeB) 01 Neodymium (Nd) is used to make high strength & high- are used in: • Electric Vehicles (Full electric and hybrids) performance neodymium magnets • Wind Turbine generators • Consumer Electronics 02 Smart solutions to clean energy sourcing, and efficient • • •

  4. Slide 4: NdPr price increase and supply deficit drivers

    (aie! The REE magnet materials Nd and Pr have experienced more than 150% price increase over the last 2 years. Anticipated deficit Increasing domestic for REE magnet demand in China supply Expected deficit of REE Complex and disruptable magnet material supply supply chains an 4 Monopolistic & opaque

  5. Slide 5: Forecast NdFeB magnet consumption and projected demand

    Forecast NdFeB Magnet Consumption 2030 Projected demand of NdFeB 120,000 for EV & Wind Turbines alone equals equals 60,000 300,000 NdPr Oxide TREO (@ 0.5kg NdPr Oxide / 1kg (@ 20% NdPr Oxide) NdFeB metal) equals Consumer Electronics Speakers Conventional Vehicles 6,000 + 30m HEV, PHEV, EV PMSG Wind

  6. Slide 6: Global deficit and rare earth oxide demand by element

    Rare earth oxide demand by element (volume & value), 2030 0% 1% 2% 2% 0% 0% Volume 0% 0% 7% Value 2% 9% 31% 34% 38% Cerium Lanthanum Neodymium Praseodymium Dysprosium Global deficit equals Terbium 26% 50,000 25,000 22% Source: Argus Media 0% 17% 9% 0% NdFeB PM NdPr Oxide material by 2030 (from new m

  7. Slide 7: Management team and partnerships

    01 CEO Canada CFO Canada Dan whittaker Rob randall Prof frances wall Ken Marshall GEOLOGY, Uk ENERGY, Canada Mr. Whittaker is the CEO A contract CFO for a of Antler Gold Inc. (TSX.V: number of public ANTL) and has held companies including senior positions in the Torrent Capital, Antler mineral indus

  8. Slide 8: One of the simplest rare earth element projects globally

    Collaborate on process development for Rare Earth Cracking and Separation One of the simplest Read more rare earth element (REE) projects globally

  9. Slide 9: A Simple NdPr Project

    A Simple NdPr Project + High grade TREO is predominantly contained in coarse grained monazite, hosted within numerous carbonatite dykes. + In-situ average grade 4.8% TREO, as stated in maiden Inferred resource (NI43-101, Aug 2021). + Additional exploration underway to assess overall footprint of the

  10. Slide 10: Results & MRE

    Results & MRE Exploration Highlights All assay results of 1st campaign received ✓ MONAZITE IN HOST ✓ ROCK GRAVITATIONAL CONCENTRATION MAGNETIC SEPARATION >65% >60% One of the simplest rare earthafter element (REE) 1 pass using st projects Gravity &globally Magnetic Process (Further optimisation can

  11. Slide 11: Exploration Potential

    EXPLORATION POTENTIAL • Inset map of immediate exploration potential. Zones 1, 2, 3 & 4 in the south. • Purple areas represent surface expression of carbonatitic dykes. • The current mineral resource estimate from 2017 programme is marked by red collars to a max depth of 60m. • Between Q4 2020 & Q2

  12. Slide 12: Exploration potential: planned surveys

    EXPLORATION POTENITAL What has the company planned moving forward? Currently conducting a Simultaneously conducting widespread ground a wide-spread ground magnetic survey program radiometric survey totalling 1060 line-km’s totalling 1224 line-km’s

  13. Slide 13: E-Tech Resources planned activities

    E-Tech Resources planned activities 2021 2022 Onwards Interpreting exploration results & Updated Mineral Resource Estimate (MRE) Q3 2021 Q4 2021 – Q2 2022 Q3-Q4 2022 Drilling Drilling Program Radiometric Program Campaign 2 Geophysical Campaign 1 Survey to define new areas & drill targets

  14. Slide 14: Funding, listing and capital structure

    How is the project funded? By 100% Equity Capital Where are you listed? We are dual listed: primarily on the TSX-V & co-listed on the Frankfurt Stock Exchange Capital Structure Issued & Outstanding | 82,971,530 Options | 3,175,000 Warrants | 1,400,000 Market Capitalization Share Price | C$ 0.15 Mark

  15. Slide 15: Committed to highest standards of environmental, social & corporate governance

    • EIA by ASEC Namibia • Follow board approved Corporate Codes, Policies, Charts, Guidelines • Own Sustainability Advisory Board with ESG experts installed Committed to highest standards of • Adhere to relevant United Nations SDG environmental, social & corporate governance • Adhere to Project Readin

  16. Slide 16: Factors for sustainable project value

    Factors for sustainable project value geography, infrastructure & technical processing conditions project conditions are market positioning & high resource characteristics & production standards actively managed growth market development

  17. Slide 17: Thank you

    Thank you www.etech-resources.com