  1. Slide 1: Power Supply Outlook

    POWER SUPPLY OUTLOOK Dir. Mario C. Marasigan, CESO III Officer-in-Charge, EPIMB MPower Partners Event 07 April 2022

  2. Slide 2: Contents

    Contents 1 Philippine Power Situation 2 2022 Luzon Power Outlook 3 Luzon Committed and Indicative Power Projects

  3. Slide 3: Philippine Power Situation

    Philippine Power Situation Fa ee

  4. Slide 4: System Peak Demand

    SYSTEM PEAK DEMAND Peak Demand in MW Growth Difference 15,282 Grid Rate in in MW Philippines 2021 2020 Percent 16,036 Philippines 16,036 15,282 754 4.9% 11,103 Luzon 11,640 11,103 537 4.8% Luzon 11,640 Visayas 2,252 2,201 51 2.3% 2,201 Mindanao 2,144 1,978 166 8.4% Visayas 2,252 1,978 Mindanao 2,144

  5. Slide 5: Capacity Mix

    CAPACITY MIX PHILIPPINES (GRID AND OFF-GRID) PH Total Installed Capacity, MW FUEL TYPE INSTALLED CAPACITY, MW DEPENDABLE CAPACITY, MW 1,250 MW (4.8%) Dec 2021 % Share Dec 2020 % Share Dec 2021 % Share Dec 2020 % Share 27,500 MW 26,250 MW Coal 11,669 42.4% 10,943.9 41.7% 10,913 44.6% 10,245.3 43.8% O

  6. Slide 6: 2022 Luzon Power Outlook

    2022 Luzon Power Outlook Fa ee

  7. Slide 7: Luzon Grid

    LUZON GRID Summer / 2nd Quarter Source: NGCP

  8. Slide 8: Luzon Grid

    LUZON GRID Summer / 2nd Quarter Source: NGCP

  9. Slide 9: Luzon Committed and Indicative Power Projects

    Luzon Committed and Indicative Power Projects

  10. Slide 10: Luzon Committed Power Projects

    LUZON COMMITTED POWER PROJECTS 3,000.00 TOTAL COMMITTED CAPACITY = 2,500.00 8,303.09 MW 2,000.00 Plus 1,490 MW BESS CAPACITY Installed Capacity, in MW 1,500.00 1,000.00 500.00 - 2021 2022 2023 2024 2025 2026 2027 TBD COAL OIL-BASED NATURAL GAS GEOTHERMAL HYDROPOWER BIOMASS SOLAR WIND BESS Plant Type

  11. Slide 11: Luzon Indicative Power Projects

    LUZON INDICATIVE POWER PROJECTS 10,000.00 9,000.00 TOTAL INDICATIVE CAPACITY = 8,000.00 29,608.81 MW 7,000.00 Plus 440 MW BESS CAPACITY 6,000.00 Installed Capacity, in MW 5,000.00 4,000.00 3,000.00 2,000.00 1,000.00 - 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 TBD COAL OIL-BASED NAT

  12. Slide 12: End of Presentation: Power Supply Outlook

    END OF PRESENTATION POWER SUPPLY OUTLOOK Dir. Mario C. Marasigan, CESO III Officer-in-Charge, EPIMB MERALCO Webinar on the Power Supply Situation and ILP 01 April 2022