Impala Platinum Holdings Limited · JSE:IMP
Impala Platinum — Fact Sheet (January 2024)
8 slides from Impala Platinum's fact sheet, January 2024
Slide 1: Mimosa
< DY oe z =. RESPECT, wee | AND DELIVER
Slide 2: Geology
FACT SHEET Mimosa is jointly held by Implats (50%) In FY2023 and Sibanye-Stillwater (50%). Mimosa produced Its operations are located on the Wedza Geological Complex on the Zimbabwean 245 000 Great Dyke, 150 kilometres east of ounces 6E in concentrate Bulawayo. The operation comprises a shallow unde
Slide 3: Mimosa locality map
MIMOSA Mimosa locality map 29°50’ E 29°45’ E Shurugwi 20°14’ S Zvishavane North Hill Wedza West TSF Wedza South Blore TSF Hill 20°21’ S Far South Hill South Ridge Legend Town River Mining right boundary Dam Public road Portal Railway line MSZ outline 0 5 Tailings storage Tailings storage Scale (km)
Slide 4: Mining and life of mine
FACT SHEET MINING Mimosa holds contiguous mining rights amounting to 7 691 hectares on the North Hill, the South Hill, Mtshingwe Block and Far South Hill orebody areas. The orebody is shallow and the current average depth is 180m. The bord and pillar mining method is employed and stoping widths aver
Slide 5: Metallurgy and sustainable development
MIMOSA METALLURGY Mimosa has a concentrator plant on site where initial processing is done. Concentrate is transported by road to Impala’s Mineral Processes facility in South Africa in a life-of-mine offtake agreement with Impala Refining Services (IRS). Discussions continue with the Government of Z
Slide 6: History
FACT SHEET HISTORY Mimosa was acquired by Zimasco from Union Carbide in 1993. Zimasco piloted platinum mining in Zimbabwe by resuscitating the operation and steadily increasing production to 1 000 tonnes per day by 1998. In July 2001, Implats acquired a 35% stake in Mimosa for R246 million. With a f
Slide 7: Mimosa – Key statistics
MIMOSA MIMOSA – KEY STATISTICS FY2023 FY2022 FY2021 Production Tonnes milled ex mine (000t) 2 735 2 816 2 861 Headgrade (6E) (g/t) 3.77 3.82 3.87 6E in concentrate (000oz) 245 246 261 Labour efficiency Tonnes milled per employee (t/man/annum) 733 750 757 costed* Cost Mining cost of sales (Rm) (5 503
Slide 8: Contact details
CONTACT DETAILS HEAD OFFICE 2 Fricker Road, Illovo, 2196 Private Bag X18, Northlands, 2116 Tel: +27 (11) 731 9000 E-mail: [email protected] www.implats.co.za Group Executive: Corporate Affairs Johan Theron Tel: +27 (11) 731 9013 E-mail: [email protected] Executive: Corporate Affairs Em