Edison International · NYSE:EIX

Edison International — 41st EEI Financial Conference 2006

35 slides from Edison International's conference presentation, Nov 6, 2006

  1. Slide 1: Business Update, 41st EEI Financial Conference

    Exhibit 99.1 Business 41st Handout November EEI Financial Update 2006 Conference, Las Vegas

  2. Slide 2: Forward-Looking Statements

    Forward-Looking This expectations does “will,” necessarily to regulations of •access; Additional Commission. reports speak 1 decisions market access governmental, risks effects supply transmission the general weather changes differ, spare presentation availability outcome cost ability risk extent di

  3. Slide 3: Edison International - Value Drivers

    Edison International - Value Drivers Integrated Platform EIX SCE EMG Value Drivers Value Drivers • Strong customer and load growth • Low-cost coal generation portfolio • Tight reserve margins keep focus on reliability • EBITDA exceeds $1 billion annually1 • $12 billion, 5-year capital investment pro

  4. Slide 4: Southern California Edison (SCE) System Growth

    System Growth Southern California Edison (SCE) 3 Capital Investment Execution Regulatory Framework Dependable Earnings

  5. Slide 5: SCE Value Driver – System Growth

    System Strong expand SCE New 90,000 88,321 77,437 80,000 70,000 60,000 63,021 – 50,000 Peak 22,000 21,934 26,000 MW 18,821 20,136 22,889 •18,000 14,000 10,000 2001 1. 2. 3. 4 New 4.4% Expect 360,000 2006 LA, Moreno 17,890 Value Growth Meter Demand 2002 Meter Riverside, customer growth –83,979 73,204

  6. Slide 6: SCE Value Driver – Peakers

    System SCE •Peakers 5 To Initiated Each “Black Capital Expected be Value toof installed install Growth to Start” investment 5in Enhance to Driver units August increase be 5Capable Capital “black at in-service capable –existing Grid System 2006 approximately available start” Investment - Reliability

  7. Slide 7: SCE Renewable Contracts

    SCE System Renewable 10-, In – SCE September 2005, 15-, Value estimates Growth SCE or Driver Contracts 20-year 2006, purchased Capital that – contract SCE System more New Investment and received than Generation Growth proposals delivered 16% proposals Execution ofContracts were tothe customers power

  8. Slide 8: SCE Advanced Metering Initiative

    System “SCE Arshad SCE Utility 7 AMI Value cited has Planning Mansoor, Growth taken Phase as Driver industry Capital an Network IV.P. selected –industry Capital leader ofInvestment Power and asleadership Investment in“2005-2006 Automatic advanced Delivery Execution position Meter & metering Best Mar

  9. Slide 9: SCE AMI Highlights

    System SCE Value Growth Driver – Capital Investment Highlights Design Field – Full Conceptual AMI Advanced 8 Meter deployment Initiative Supports testing phase testing meters of capital planned SCE’s ahead Ahead Next and planned and investment vendor of Generation Advanced to of related schedule occ

  10. Slide 10: Benefits of SCE's AMI Initiative

    SCE Value System Growth Driver – Capital Investment Capital Investment Execution Regulatory Framework Dependable Earnings SCE Benefits of SCE’s AMI Initiative Supports SCE’s strategy of modernizing its Customers infrastructure Empowers customers to manage their energy use and cost, and provides new

  11. Slide 11: SCE Five-Year Capital Investment Forecast

    System SCE Value Growth Driver – Capital Investment • .4 2.8 Peakers 2 AMI Current 1.2 100 12.0 Total 1.6 58 7.0 Distribution 2.0 Transmission 12 1.5 Generation 2.1 2.3 2.4 $ CPUC 0.8 FERC 0.4 67 8.0 Project 21 2.5 2006 In 10Five-year 2006 Billions %addition 72.62007 Rate CPUC Rate 2.6 Specific Fore

  12. Slide 12: SCE Rate Base Growth

    System SCE Value Growth Driver – Capital Investment • Expected $ Rate 16.0 12.0 10.9 11.7 12.9 4.0 8.0 CPUC 2005 0.0 GRC Growth AMI 1. (2009-2010) 11Capital 2009-2010 Plan Billions Includes 2003 14.4 10.2 Base and 2006 to Approved Rate file investment 2006 Peakers 16.3 2007 increase impact increase

  13. Slide 13: Transmission Projects Execution

    System SCE Value Growth Driver – Execution Existing Future In Project Date DPV1 NEVADA Las CALIFORNIA SCE Tehachapi Midway Antelope (PG&E) Palmdale Pardee Sylmar Rancho Loma Palm Los Santa Valley Ana San Verde 12 Service Vegas Angeles Diego Palo has Eldorado (Millions) Phoenix Total Clarita Reliabil

  14. Slide 14: Mountainview and San Onofre Steam Generator Replacement

    System SCE Value Growth Driver – Execution Mountainview •San $0.6 1 13Mountainview CPUC 969 $Began 2,150 Pending 0.6 Onofre billion MW billion MW commercial approved regulatory inNuclear -total the SGR investment placed heart (SCE SONGS project Generation operation approval ofin share SCE’s (on-time

  15. Slide 15: Regulatory Framework

    System SCE Value Growth Driver – Regulatory Framework California’s Rate Investors’ •Procurement 14 Approved General 2006 48% 11.6% Received Energy January Base common GRC Cost return Resources 2006 Rate Return and final 97% 95% of regulatory Decision Cost Operations Capital on Case ERRA equity CPUC

  16. Slide 16: Edison Mission Group (EMG) Competitive Power Business

    Low-Cost Coal Edison A 15Competitive MissionPower GroupGeneration (EMG) Business Operational/Marketing/ Trading Capabilities Cash Position Growth Opportunities

  17. Slide 17: EMG – Low-Cost Coal Generation Portfolio

    Low-Cost EMG – Generation Coal Portfolio Small Midwest March Projects Storm 70 109 50 Hardin/ Jeffers 36 Crosswinds à7,537 Homer à1,884 Ambit 40 9,637 Big Sunrise 964 San Mesa 90 95 Strong 1. 2. 16608 Includes MW 4, MW Juan Sleeping 2Total MW Wind Lake 9Point operating Coal City Wind & 305 MW Bear B

  18. Slide 18: EMG – Value Drivers

    Low-Cost EMG – Value CoalDrivers • Expansion – 1. EMG 2. 17Low-cost Strong Illinois Several Balance Thermal/IGCC $1.18 Effective Match Forward RPM $1 Intend Investment Expanded Contracted Nationwide Seebillion Cashguidance appendix Settlement: billion and operational to duration BGS bilateral use Po

  19. Slide 19: EMG – Wind Portfolio Development

    Development EMG – Wind Portfolio Expertise Wind No. Projects In-service supported Under •– Purchased Optioned credits Total 1. 2. 18Projects 29 Late-stage Development of MW Turbines 14 Project construction turbines and Size 608 Turbines in have by 9Turbines depreciation 266 late-stage –development:

  20. Slide 20: EMG – California Thermal Generation Opportunities

    EMG – California Thermal Generation Opportunities Projects Recontracting • Big 4 projects contract extension (602 MW) -Kern River - 5-year market-rate contract approved by CPUC in May 2006 -Other Big 4 contracts expire: December 2007 Natural Gas-Fired (Sycamore); April 2008 (Watson); May 2009 (Midwa

  21. Slide 21: EMG/BP Carson Hydrogen Power Project Overview

    -•EMG/BP 20 Petroleum Hydrogen Captured Provides–up Captures 4CO2 Carson gas coke million to used 500 transported converted Hydrogen tons MW to fuel of ofto CO gas by new, Power hydrogen pipeline turbines 2 clean perProject year generating to and tooilfields generate Overview CO2 –capacity and about

  22. Slide 22: EMG Planned Growth Capital Expenditures

    EMG Planned $ 200.0 300.0 295 400.0 500.0 600.0 31 100.0 2006 0.0 Growth Plant Environmental •Potential 21 Wind Thermal Environmental Millions 252007 Capex –Environmental Growth investments Capital $Expenditures Additional 281 investments 614 2008 11$343 Expenditures 559 2009 expenditures 1222 (2008

  23. Slide 23: EMG Environmental Compliance

    EMG Environmental Clean •standard• units The 22Useoptimal to of -Air Coal reduce lower Regional Mercury Environmental Fleet sulfur NOx• Rules Environmental Rule HazeCarbon coal• Baghouses Possible (CAMR)Clean Activated Compliance Options Control? toCompliance reduce Carbon Air plan Particulate Inter

  24. Slide 24: Performance: Year to Date through September 30, 2006

    Performance Balance 30, Year to Date Performance through September 23 Sheet Strength 2006 Growth Dividends Shareholder Returns

  25. Slide 25: Edison International - Earnings Performance

    Edison International - Earnings Performance Core Earnings (Loss) (in millions) (Unaudited) Year-to-Date September 30, Southern California Edison Company 2006 2005 Change Edison Mission Group $513 $507 $6 Mission Energy Holding Company Edison Capital 265 233 32 Edison Mission Group Total 44 77 (33) E

  26. Slide 26: EMG Operating Performance Update

    Edison International – EMG Operating Performance Update Sep 30,months ended Three Sep 30, Nine months ended Midwest Generation 2006 2005 Change % 2006 2005 Change % Generation (in TWh) Equivalent Availability 8.4 8.1 0.3 3.7% 21.2 22.4 (1.2) (5.4%) Forced Outage Rate (EFOR) 89.6% 87.9% 1.7% 80.9% 76

  27. Slide 27: EMG – Hedge Program

    Performance EMG – Hedge Program Guidance as of November 3, 2006 26 Balance Sheet Strength Growth Dividends Shareholder Returns

  28. Slide 28: EMG – Hedge Program Status

    Performance EMG – Hedge Program Balance Hedge Program status at September 30, 2006 Sheet Strength Growth Dividends Shareholder Returns Remainder of Midwest Generation 2006 2007 2008 2009 Electricity Hedge Contracts (in TWhs) Energy Only Contracts Load requirements service contracts (estimated) 5.1 1

  29. Slide 29: Edison International - Earnings Guidance

    Edison International - Earnings Guidance Performance Balance Sheet Strength Growth Dividends Shareholder Returns Core EPS: Guidance Effective as of November 3, 2006 • SCE 2006 2007 • EMG $1.88 $1.97 – $2.07 • EIX Holding Co. 1.14 1.21 – 1.51 Core (0.11) (0.13) $2.91 $3.05 - $3.45 Non-Core Items 1: •

  30. Slide 30: Edison International – Strategic Plan

    Performance Edison International – Strategic Plan Foundation Organic •Produces 29 Strong Growth Competitive Significant Business Upside utility earnings flexibility long-term power operating potential generation forearnings future in from a large growthBalance business and competitive and cash rapid

  31. Slide 31: Appendix

    Appendix ote ALIVONAL*

  32. Slide 32: Appendix – Non-GAAP Reconciliation Core Earnings Per Share

    Appendix – Non-GAAP Reconciliation Core Earnings (Loss) Per Common Share 31, December Ending Year Southern California Edison Company 2005 2006 2007 EMG $1.82 $1.88 -$2.07 $1.97 EIX parent company and other 1.42 1.14 -1.51 1.21 EIX Consolidated Core Earnings (0.11) (0.11) (0.13) Non-core items $3.13

  33. Slide 33: Appendix – EBITDA Edison Mission Group

    Appendix – EBITDA Edison Mission Group ($ millions) 2005 2006 2007 Net income Actual Outlook Forecast Add-back (Deduct): $442.4 $364.2 $444.51 Cumulative effect of change in accounting Discontinued operations 1.2 (0.4) - Income (Loss) from continued operations (29.5) (75.5) - Interest expense 414.1

  34. Slide 34: Assumptions

    Assumptions regulations, under inventory directly •the 33Actual Average The NAPP, Fuel NAPP Homer amount certain Costs in Coal future “Northern costs. hedge Units City contractual include Detail agreements. is ofFuel afacilities. coal price 1proxy and Appalachian”; Costs coal under reflects 2,Btu fo

  35. Slide 35: EMG – Liquidity

    EMG – Liquidity Available Liquidity ($Profile millions) Collateral Sources EME Revolver 12/31/05 9/30/06 MWG Revolver $98 $494 Cash & Short term investments¹ 325 465 1,869 2,309 • /30/06 Credit 1,200 $ 800 1,000 9 0 $217 200 400 $550 600 Potential 1. 2. 3. 34Cash Strong Enhanced millions Excludes In

Edison International — 41st EEI Financial Conference 2006 on 6ix