Elia Group SA/NV · EURONEXT:ELI

Elia Group SA/NV — Investor Presentation (October 2013)

126 slides from Elia Group SA/NV's investor presentation, Oct 15, 2013

  1. Slide 1: Info Session NWE Day-Ahead

    Elia’s European Market Design Work Group & Belpex Users’ Group Info Session NWE Day-Ahead Operational & contractual changes for Belgian wholesale market organization

  2. Slide 2: Agenda

    Agenda • Introduction • Pascale Fonck & James Matthys-Donnadieu • General overview of NWE Price Coupling • Martine Verelst • Operational principles & possible scenarios • Amélie Gemers • Detailed operational procedures • Ghizlan Achkari • New Smart Order types & Automatic Order Submission Tool • Rob

  3. Slide 3: General overview: NWE Day-Ahead Price Coupling

    General overview NWE DAY-AHEAD PRICE COUPLING

  4. Slide 4: AS IS > TO BE

    AS IS > TO BE • Two separate Market Couplings (CWE & Nordic) linked by a volume coupling (ITVC organised by EMCC) • Sequential calculation approach • No common algorithm applied • Full coupling with GB NWE • One single price coupling based on a single calculation • One single common algorithm to all

  5. Slide 5: PCR: Price Coupling of Regions

    PCR : Price Coupling of Regions 5

  6. Slide 6: NWE – Behind the scenes

    NWE – Behind the scenes Parties involved • 13 Transmission System Operators • 4 Power Exchanges Systems & interfaces • Approx. 50 systems involved • Approx. 150 interfaces • 40 serviced interconnectors • 30 bidding zones 6

  7. Slide 7: NWE – Driving European Market Integration

    NWE – Driving European Market Integration „NWE is more than the sum of its parts“ It promotes liquidity and robustness of DA markets It establishes the It allows for necessary optimal usage NWE DA framework to of cross-border enable extensions capacities It encourages the harmonization of market rul

  8. Slide 8: Potential integration of losses on DC cables

    Potential integration of losses on DC cables Activation of losses on a specific interconnector is subject to approval of relevant national NRAs Cable Loss factor Comments foreseen IFA (UK-FR) yes Application to Ofgem and CRE. Foreseen for go-live Britned (UK-NL) yes Application to Ofgem and ACM. For

  9. Slide 9: NWE - Interconnectors

    NWE - Interconnectors FerroSkan EstLink Skagerak Kontiscan NorNed DK1-DE Baltic SwePol BritNed Kontek IFA

  10. Slide 10: Operational principles & possible scenarios

    General principles OPERATIONAL PRINCIPLES & POSSIBLE SCENARIOS

  11. Slide 11: Price Coupling Process

    Price Coupling Process General term for ATC and/or FB parameters used = CZCs : Cross Zonal Capacities 11

  12. Slide 12: NWE Business Process

    NWE Business Process 10:30 CZCs and allocation 12:00 12:55 12:55 – 14:00 Global Preliminary PX constraints submitted Orderbooks closure Global Final Confirmation Nominations Confirmation to PCR Publication Trading CZCs and allocation Market Coupling Final confirmation constraints Results and Confirm

  13. Slide 13: Normal process – 55 minutes

    PCR Process Timings for NWE Normal process – 55 minutes 12:00 OBK GCT 12:00 – 12:10 Check of OBK and sending to PMB 12:10 – 12:27 Calculation 12:28 – 12:41 Preliminary PX validation 12:42 Publication of preliminary results (incl. market clearing price) to the market and in parallel sending of these

  14. Slide 14: Process is delayed

    Process is delayed Partial Latest Time to Coupling/Full Target Start an IC Decoupling Time Deadline TIME Normal procedures can still apply after Normal Procedure target time Backup procedure can apply before the Backup procedures target time Fallback procedures Fallback procedures can apply before f

  15. Slide 15: Process delayed – assumptions

    Process delayed – assumptions Pre-coupling • Deadline to solve incidents with Network Data (CZCs) publication is 11:45 CET Coupling Max. Time • Time allowance for technical problem solving up to 55 min /Flexibility to solve technical problems 55min • Time allowance for special market procedures such

  16. Slide 16: Second Auction

    2nd Auction CWE/ GB Second Auction 48 min • A Second Auction is triggered in case at least one of the CWE/GB prices reach or exceed the predefined price thresholds • The routine consists in • Reopening the PXs order books for 10 minutes to give the Market Participants the opportunity to modify their

  17. Slide 17: PCR Process Timings for NWE

    PCR PROCESS TIMINGS for NWE • * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. • ** the Second Auction in CWE / GB is a single process takin

  18. Slide 18: Fallback procedures

    Fallback procedures Partial Latest Time to Coupling/Full Target Start an IC Decoupling Time Deadline TIME Normal procedures can still apply after Normal Procedure target time Backup procedure can apply before the Backup procedures target time Fallback procedures Fallback procedures can apply before

  19. Slide 19: Fallback procedures

    Fallback procedures Partial Latest Time to Coupling/Full Target Start an IC Decoupling Time Deadline TIME Normal procedures can still apply after Normal Procedure target time Backup procedure can apply before the Backup procedures target time Fallback procedures Fallback procedures can apply before

  20. Slide 20: Full Decoupling of NWE

    Full Decoupling of NWE • Internally in CWE and for the CWE – Nordic interconnectors (except Baltic Cable): • Shadow auctions organized by CASC will be held and results published • The 3 PXs within CWE will reopen the order books (20 min) and perform local DA spot market calculations without using cr

  21. Slide 21: Shadow Auctions

    Shadow Auctions • Bids submitted through the Shadow Auctions interface at CASC.EU are default bids : • They are valid for every day of the year, for a specific border, direction and an hourly period (Volume in MW and a Price in €/MWh) • Participants can update their default bids at any time before t

  22. Slide 22: Full Decoupling scenario

    Full Decoupling scenario CWE : 4 local PX auctions Nordic-Baltic Market Splitting Virtual Capacity is set to Zero 2 local PX auctions Shadow Auctions “Local” matching process In case of full decoupling the processes are local Communication in case of fallback is organized locally (different info, di

  23. Slide 23: CWE TSO investigate flexibility of notification deadline

    CWE TSO investigate flexibility of notification deadline • The CWE TSOs and 50 Hertz have agreed upon a joint target solution for the deadlines for submitting the different schedules towards the TSOs available as of Go-Live of the Price Coupling in the NWE region • Taken into account that it is impo

  24. Slide 24: Flexibility of notification deadline – impact on procedures

    CWE TSO investigation on flexibility of notification deadline – impact on procedures Exceptional cases Notification Process 45 min 15:30 15:30 Crossborder Notification Generation Process Notification 45 min Process 15:30 At least 60 min 24 15:45

  25. Slide 25: PCR Process Timings for NWE

    PCR PROCESS TIMINGS for NWE 25

  26. Slide 26: Full Decoupling before OBK GCT (12:00)

    Full Decoupling before OBK GCT (12:00) Case X10 Case X11 Case X12 Full decoupling X10 + X10 + before 12.00 delay 2nd Auction CWE OBK GCT = 12:00 Full decoupling Full decoupling Full decoupling 42 min 42 min 42 min Max. Time 2nd Auction Notification /Flexibility to CWE/ GB Process solve technical pro

  27. Slide 27: Partial (De)coupling within NWE

    Partial (De)coupling within NWE • Any scenario where one or more bidding areas and/or interconnectors are temporary not participating in NWE Market Coupling while the remaining bidding areas/interconnectors still participate in NWE Market Coupling • The CZCs for the decoupled borders / interconnecto

  28. Slide 28: Partial Decoupling Scenario Example: CWE+GB <> Nordic

    Partial Decoupling Scenario Example : CWE+GB <> Nordic PCR coupling Nordic-Baltic: Market Splitting Shadow Auctions “Local” matching process PCR matching process 28

  29. Slide 29: Partial Decoupling Scenario Example: NorNed

    Partial Decoupling Scenario Example : NorNed PCR coupling Shadow Auctions PCR matching process 29

  30. Slide 30: Partial Decoupling Scenario Example: EPEX OBK missing

    Partial Decoupling Scenario Example : EPEX OBK missing PCR coupling Shadow Auctions PCR matching process “Local” matching process 30

  31. Slide 31: Partial Decoupling Scenario Example: APX NL/Belpex OBK missing

    Partial Decoupling Scenario Example: APX NL/Belpex OBK missing PCR coupling Shadow Auctions “Local” matching process PCR matching process 31

  32. Slide 32: Partial Decoupling Scenario Example: no CWE CZCs in PMB

    Partial Decoupling Scenario Example : no CWE CZCs in PMB PCR coupling Shadow Auctions PCR matching process “Local” matching process 32

  33. Slide 33: Decoupling scenarios

    Decoupling scenarios Where’s the problem What decouples? Resulting configuration APX/Belpex CWE internal borders (FR-DE, NL, BE and APX UK FR-BE, BE-NL, NL-DE) and markets isolated NorNed and BritNed and GB-GB EPEX CWE internal borders and IFA, DE, FR, and BE DK-DE, DE-SE markets isolated NPS (Nordi

  34. Slide 34: Partial Decoupling before OBK GCT (12:00)

    Partial Decoupling before OBK GCT (12:00) • * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. • ** the Second Auction in CWE / GB is a single

  35. Slide 35: Partial Decoupling before OBK GCT (12:00)

    Partial Decoupling before OBK GCT (12:00) Partial coupling followed by Full Decoupling + Special Routine Nordics • * In case X6b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are still coupled, but this is not relevant in a full decoupling si

  36. Slide 36: Partial Decoupling after OBK GCT (12:00)

    Partial Decoupling after OBK GCT (12:00) Case X7 Case X8 Case X9a Case X9b Publication of preliminary results =12:42 36

  37. Slide 37: Nomination Deadlines @ Elia

    Nomination Deadlines @ Elia Cases Case Description NO market HUB 1 Cross Border Genera- Number results HUB2 tion before Off-Take Injection Normal - X1 partial decoupling before OBK GCT 14:00 14:30 15:00 X10 full decoupling before OBK GCT 1 small delay X2 partial decoupling before OBK GCT + small del

  38. Slide 38: Powering a world in progress

    38 Powering a world in progress

  39. Slide 39: The coffee break

  40. Slide 40: Detailed operational procedures

    Timings and messages DETAILED OPERATIONAL PROCEDURES

  41. Slide 41: Normal NWE/PCR process

    NORMAL NWE/PCR PROCESS

  42. Slide 42: Normal NWE/PCR process

    Normal NWE/PCR process Final PX GCT results Normal timing 10:30 12:00 12:42 12:55 15:00 CZC publication MP’s introduce orders Preliminary result publication Coupling process Notifications to Elia * All timings are C.E.T 42

  43. Slide 43: Normal process timeline

    Normal process timeline • CZC published at 10:30 on CASC website • PX gate closure time at 12:00 • Publication of preliminary market results 12:42 • Publication of final market results 12:55 Notification Belgium France Germany The Netherlands deadline Cross-Border 14:30 14:30 14:30 14:00 (E-program)

  44. Slide 44: Case 1 Process delayed with max timing

    CASE 1 PROCESS DELAYED WITH MAX TIMING

  45. Slide 45: Case 1 Process delayed with max timing

    Case 1 Process delayed with max timing Final PX GCT Normal results timing 10:30 12:00 12:42 12:55 13:00 13:20 Exceptional 13:38 13:50 15:30 timing CZC publication MP’s introduce orders Preliminary result publication Coupling process / Backup procedures Notifications to Elia Message to MP Technical p

  46. Slide 46: Case 1 Process delayed with max timing

    Case 1 Process delayed with max timing • CZC published at 10:30 on CASC website • PX gate closure time at 12:00 • Delay in Market Coupling results Timing Message Additional actions Market Local hub Cross Generation for MPs results Notification Border notification Publication Deadline Notification de

  47. Slide 47: Messages

    Messages veld Lelia PX : [ExC_02] TSO #9 [FxC_02]: Delay in Market Coupting Results publication - Message (HTML) Efile Edt Yiw Insert Format Took Actions Help Fle Edt View Insert Fat Tons Actions Help se ed BI oh NO) BD | oats | @ BM cae a Z| (tes) [pti access IPT <DNERIDACCESSGELIA BES ] (Tae. ) |

  48. Slide 48: Case 2a Second Auction

    Powering a world in progress CASE 2A SECOND AUCTION Case 2a 2"? Auction CWE/GB

  49. Slide 49: Case 2a second auction

    Case 2a second auction Final PX GCT Normal results timing 10:30 12:00 12:30 14:00 Exceptional >12:42 >12:55 13:00 13:20 <13:50 15:30 timing CZC publication MP’s introduce orders Preliminary result publication Coupling process Notifications to Elia Message to MP * All timings are C.E.T 49

  50. Slide 50: Case 2a second auction

    Case 2a second auction • CZC published at 10:30 on CASC website • PX gate closure time at 12:00 • Threshold reached -150€/MWh or 500€/MWh (-150£/MWh or + 500£/MWh) •  Second Auction triggered (re-opening of Order Books) Timing Message Additional Market Local hub Cross Border Generation actions for

  51. Slide 51: Messages

    Messages PX : [ExC_01] CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40. 51

  52. Slide 52: Case 4 Full Decoupling

    Powering a world in progress CASE 4 FULL DECOUPLING

  53. Slide 53: Case 4 Full Decoupling

    Case 4 Full Decoupling Shadow PX GCT Auction Final Normal results results timing 10:30 12:00 12:55 Exceptional 12:42 13:00 13:20 13:50 >14:30 15:30 timing CZC publication MP’s introduce bids Process run Full decoupling preparation* Full decoupling MP’s update orders** Exceptional procedures Notifica

  54. Slide 54: Case 4 Full Decoupling

    Case 4 Full Decoupling • CZC published at 10:30 on CASC website • PX gate closure time at 12:00 Timing Message Additional actions Market Local hub Cross Border Generation for MPs results Notification Notification notification Publication Deadline Deadline deadline deadline HUB1/HUB2 CASC: invitation

  55. Slide 55: Case 4 Full Decoupling

    Case 4 Full Decoupling • Full decoupling announcement • Shadow auctions • Follow the local auction rules Timing Message Additional actions Market Local hub Cross Border Generation for MPs results Notification Notification notification Publication Deadline Deadline deadline deadline HUB1/HUB2 [ExC_03

  56. Slide 56: Messages

    Messages PX : [ExC_02] Powering a world in progress Nes sults publication, Edt Yew Insert Foimat Tools Adions Help send | fH) oh 3 | | S| SDD |e | SI 23 ontions PaO) || Calon Al ees Ce. JI Subject [EC Clon Walt Coupg Pers publesen APX--- beloe<--- Dear APX or Baloex participant, ‘The Market Coupling

  57. Slide 57: Messages

    Messages PX : [ExC_03b] TSO CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40 57

  58. Slide 58: Messages

    Messages PX : [ExC_04b] TSO 58

  59. Slide 59: Case 5a Full Decoupling + 2nd Auction

    CASE 5A FULL DECOUPLING + 2ND AUCTION

  60. Slide 60: Case 5a Full Decoupling + 2nd Auction

    Case 5a Full Decoupling + 2nd Auction Shadow Auction PX GCT results Final**** Normal results timing 10:30 12:00 12:55 Exceptional 12:42 13:00 13:20 13:50 14:00 14:25 14:45 16:00 timing CZC publication MP’s introduce bids Coupling process Full decoupling preparation* Full decoupling MP’s update order

  61. Slide 61: Case 5a Full Decoupling + 2nd Auction

    Case 5a Full Decoupling + 2nd Auction • CZC published at 10:30 on CASC website • PX gate closure time at 12:00 Timing Message Additional actions Market Local hub Cross Border Generation for MPs results Notification Notification notification Publication Deadline Deadline deadline deadline HUB1/HUB2 C

  62. Slide 62: Case 5a Full Decoupling + 2nd Auction

    Case 5a Full Decoupling + 2nd Auction • Full decoupling announcement • Shadow auctions • Follow the local auction rules Timing Message Additional actions Market Local hub Cross Border Generation for MPs results Notification Notification notification Publication Deadline Deadline deadline deadline HU

  63. Slide 63: Messages

    Messages PX : [ExC_02] Powering a world in progress Nes sults publication, Edt Yew Insert Foimat Tools Adions Help send | fH) oh 3 | | S| SDD |e | SI 23 ontions PaO) || Calon Al ees Ce. JI Subject [EC Clon Walt Coupg Pers publesen APX--- beloe<--- Dear APX or Baloex participant, ‘The Market Coupling

  64. Slide 64: Messages

    Messages PX : [ExC_03b] TSO CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40 64

  65. Slide 65: Messages

    Messages PX : [ExC_04b] TSO 65

  66. Slide 66: Messages

    Messages PX : [UMM_05] TSO Fle Edt View Insert Format Tools Actions Help fle Edt View Insert Format Tools Actions Help Arial | 10 Send | (| Ga] Biierdona so =| Al Boz) = . (Cites _) (cssestapxeroun com 1} (tec) (Dita acess TPT <[email protected]> ] (ose) | | J Subject: _[UY_0S: Thresholds reached

  67. Slide 67: Case X3a Partial Coupling before OBK GCT + Second Auction

    CASE X3A PARTIAL COUPLING BEFORE OBK GCT + SECOND AUCTION

  68. Slide 68: Case X3a partial coupling before OBK GCT + Second Auction

    Case X3a partial coupling before OBK GCT + Second Auction Shadow Auction Final results 12:00 results Normal timing 10:30 PX GCT 12:30 14:00 Exceptional 11:15 11:45 >12:42 >12:55 13:00 13:20 <13:50 15:30 timing CZC publication MP’s introduce orders Preliminary result publication Partial coupling befo

  69. Slide 69: Case X3a partial coupling before OBK GCT + Second Auction

    Case X3a partial coupling before OBK GCT + Second Auction • CZC published at 10:30 on CASC website • PX gate closure time at 12:00 • Threshold reached -150€/MWh or 500€/MWh (-150£/MWh or + 500£/MWh) •  Second Auction triggered (re-opening of Order Books) • Publication of final market results before

  70. Slide 70: Message

    Message PX : [UMM_02] CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 13:40 70

  71. Slide 71: Messages

    belpdx.-- Messages Yetia PX : [ExC_01] Powering a world in progress F Ble Edt view insert Forme Tocls Actions Help Aserd | le | 3 AP) WB | td | S| 1 options, z)10 -/AlBZ U\z (Con. _) (ssdesitanscrou com La. J[ ] ] Sabet _|[Exe1) thoshods reached -Reporing toad bots QaQx---- belpe<-- Dear APX or Belp

  72. Slide 72: Case X7 Partial Coupling after GCT

    CASE X7 PARTIAL COUPLING AFTER GCT

  73. Slide 73: Case X7 partial coupling after GCT

    Case X7 partial coupling after GCT Shadow Auction Final PX GCT results Normal results timing 10:30 12:00 Exceptional 12:20 12:30 12:40 13:00 13:20 13:38 13:50 15:30 timing CZC publication MP’s introduce orders Preliminary result publication Partial coupling preparation* Partial coupling MP’s update

  74. Slide 74: Case X7 partial coupling after GCT

    Case X7 partial coupling after GCT • CZC published at 10:30 on CASC website • PX gate closure time at 12:00 • Publication of preliminary market results at the latest 13:38 • Publication of final market results at the latest 13:50 Timing Message Additional Market Local hub Cross Border Generation act

  75. Slide 75: Messages

    Messages PX : [ExC_03a] CASC will add: Therefore, if relevant, we advise you to update your shadow bids at CASC EXAU platform before 12:30. 75

  76. Slide 76: Messages

    Messages PX : [ExC_04a] TSO 76

  77. Slide 77: NWE process overview

    NWE process overview PX GCT Normal timing 10:30 12:00 12:55 Exceptional 11:45 12:20 12:40 13:05 13:50 15:30 timing CZC publication MP’s introduce bids Process run Partial coupling due to CZC reason Partial coupling preparation Partial coupling Full decoupling preparation Full Exceptional procedures

  78. Slide 78: Decoupling scenarios

    Decoupling scenarios Where’s the problem What decouples? Resulting configuration APX/Belpex CWE internal borders (FR- NL, BE and APX UK DE, FR-BE, BE-NL, NL-DE) markets isolated and NorNed and BritNed and GB-GB EPEX CWE internal borders and DE, FR, and BE IFA, DK-DE, DE-SE markets isolated NPS (Nord

  79. Slide 79: Communication to the market - summarized

    Communication to the market - summarized Time/ Communication Message Other messages Deadline number CASC TSO Local PX 10:00 Risk of Partial/full Decoupling known in [ExC_03a/b] X advance 10:30 Partial/full Decoupling known in advance [ExC_05a/b] 11:15 Risk of partial decoupling for one or more [UMM_

  80. Slide 80: Communication to the market - summarized

    Communication to the market - summarized Time/ Communication Message Other messages Deadline number CASC TSO Local PX 13:00 • Delay in Market Coupling Results publication -> X Extension of notification deadlines 13:20 • Risk of Full Decoupling [EXC_03b] • Delay in Market Coupling Results publication

  81. Slide 81: Powering a world in progress

    81 Powering a world in progress

  82. Slide 82: Linked & Exclusive Block Orders

    Smarter Day-ahead Smart bids project New Block Order Types LINKED & EXCLUSIVE BLOCK ORDERS

  83. Slide 83: Linked Block Orders

    Linked Block Orders Definition: • The execution of (a set of) profile block(s) is subject to the execution of another block • Other standard execution rule apply in full Use: • Allows to explicitly consider technical and economical constraints • For example, a first block may include the start-up co

  84. Slide 84: Example

    Example Technical plant data Bidding strategies Output Cost Possible bidding strategy 1: (MW) (€/MWh) • Block 1: Sell 50 MW @ 65 € • Block 2: Sell 250 MW @ 59 € Pmin 50 65 • linked to Block 1 200 62 → Unit is fully accepted if P>60; Pmax 300 60 → or 50 MW accepted if P>65 • Production cost 50 MW = 6

  85. Slide 85: Example

    Example Technical plant data Bidding strategies Output Cost Possible bidding strategy 1: (MW) (€/MWh) • Block 1: Sell 50 MW @ 65 € • Block 2: Sell 250 MW @ 59 € Pmin 50 65 • linked to Block 1 200 62 → Unit is fully accepted if P>60; Pmax •300Linked Block 60 → orwellfare Orders: global 50 MW accepted

  86. Slide 86: Linked Block Orders – use cases

    Linked Block Orders – use cases Optimise thermal power plants • Offer plant using multiple orders, allowing it to run at different outputs, each reflected by their own cost level • Run one/several hour(s) earlier or later if power prices remain interesting outside of the peak period Optimise consump

  87. Slide 87: Exclusive Block Orders

    Exclusive Block Orders Definition: • Within a set of profile blocks, at most one block can be accepted • Other standard execution rule apply in full Use: • Allows to propose for trading different production patterns • For example, a specific production plant can be offered • at a low price for basel

  88. Slide 88: Exclusive Block Orders

    Exclusive Block Orders Optimise thermal power plants • Similar to using Linked Block Orders Optimise combined heat & power installations • Heat demand with flexible timing, or some heat buffer • Flexibility might allow to produce heat & power when power prices are highest, using several exclusive pr

  89. Slide 89: Benefits of Smart Orders

    Benefits of Smart Orders • ‘Smarter’ orders give more flexibility when introducing orders for the auction • Better reflecting technical constraints of generation units • E.g. no partial clearing at non-cost reflective price levels, lower PRB frequency (plant offered in smaller blocks), … • Easier

  90. Slide 90: Static Demo: Linked Family

    Static Demo Linked Family 90 Powering a world in progress

  91. Slide 91: Linked Family - Entry

    Linked Family - Entry Two options are available to submit a Linked family Option 1 Option 2 91

  92. Slide 92: Linked Family - Entry

    Linked Family - Entry A visual representation helps the trader to identify mistakes: Red screen for Buy side (Green for Sell side) Show the number of Indicate the parent of the Give a representation of Family group submitted block the family 92

  93. Slide 93: Linked Family - Entry

    Linked Family - Entry Linked family can combine Buy and Sell: the background turns blue and the columns turn red or green to represent Buy or Sell orders Graph shows both sides Indicates the side of the Pressing this button shows block the family in a tree 93

  94. Slide 94: Linked Family - Entry

    Linked Family - Entry A Tree View shows the hierarchical relationship between orders Block 4 can only be traded if Pressing this button lead the Bloc 2 and block 1 are trade trader back to the entry screen • Color represents the side of the order (Buy or Sell). • Colored squares make the link with t

  95. Slide 95: Static Demo: Exclusive Group

    Static Demo Exclusive Group 95

  96. Slide 96: Exclusive Group - Entry

    Exclusive Group - Entry Two options are available to submit an Exclusive Group Option 1 Option 2 96

  97. Slide 97: Exclusive Group - Entry

    Exclusive Group - Entry A visual representation helps the trader to identify mistakes: Green screen for Sell side (Red for Buy side) Number of exclusive group will be Out of all the order entered, limited – limit to be defined maximum one will be traded 97

  98. Slide 98: Exclusive Group - Entry

    Exclusive Group - Entry Linked family can combine Buy and Sell: the background turns blue and the columns turn red or green to represent Buy or Sell orders Indicates the side of the Graph shows both sides block 98

  99. Slide 99: Automatic Order Submission Tool

    Smarter Day-ahead Smart bids project Submit Orders using XML files AUTOMATIC ORDER SUBMISSION TOOL 99

  100. Slide 100: Automatic Order Submission: Intro

    Automatic Order Submission Intro • New tool to facilitate submitting orders in automated way using XML files • Easier workflow • Eliminates operational risks involved with Paste from Excel functionality • Planned to be available before launch of Smart Orders 100

  101. Slide 101: Automatic Order Submission: Details

    Automatic Order Submission Details • Software to be installed alongside EuroLight® client • Tool will monitor specific folder and • Process all xml files contained in folder • Give feedback via « acknowledgement » xml file • Orders introduced via tool will be visible in EuroLight® Order Book • Editi

  102. Slide 102: Automatic Order Submission: XML Specifications & Testing

    Automatic Order Submission XML Specifications & Testing • Draft manual & specifications of xml files available on APX / Belpex websites • Scheduled to be available on the Member Testing environment as of 23 October 102

  103. Slide 103: Change to Rules

    Belpex Market Rules – Elia ARP contract – … CHANGE TO RULES 103

  104. Slide 104: Belpex Market Rules

    Belpex Market Rules Market Rules • Execution conditions for Linked & Exclusive Block Orders • Clarifications of procedures (with no impact on members) 104

  105. Slide 105: Belpex Market Procedures

    Belpex Market Procedures Market Segment Specifications • Changes with respect to countries involved in Market Coupling • Day-Ahead Market • Minimum price will become -500 €/MWh Via Communication • Maximum price will remain +3000€/MWh • Availability Linked & Exclusive Block Orders confirmed • Changes

  106. Slide 106: Changes to Elia ARP contract

    Changes to Elia ARP contract ARP Contract • No changes • Contains nomination deadlines for normal procedures 106

  107. Slide 107: Publications

    Capacities – Flows – Prices – … PUBLICATIONS 107

  108. Slide 108: Publications

    Publications • www.belpex.be • Market prices & auction volumes • www.elia.be • NTC values, ATC values, flows • www.casc.eu • ATC values, Shadow Auction results (if any) • Yearly, monthly capacity auction results • www.europeanpricecoupling.eu • Daily prices, ATC values & flows 108

  109. Slide 109: Planning to Go-live & Member Testing

    Belpex Market Rules – Elia ARP contract – … PLANNING TO GO-LIVE & MEMBER TESTING 109

  110. Slide 110: NWE Target Go-live Date

    NWE Target Go-live Date • The Target Go-live date has been set at 26 November 2013 • for Delivery Date 27 November 2013 • Go-live date is subject to • Successful completion of the Simulation Test phase; • Successful completion of the Member Test phase; • Signing of all contracts and agreements; • Re

  111. Slide 111: NWE Simulation Testing

    NWE Simulation Testing • Simulation Testing phase by NWE project parties until 31/10/2013 • Normal Day scenarios • Backup scenarios • Fallback scenarios (full decoupling and partial coupling) • Complexity due to • testing with 50+ systems and 150+ interfaces involved • New partial coupling procedure

  112. Slide 112: Joint NWE Member Tests

    Joint NWE Member Tests • NWE Member Test planned for 14/10 – 25/10 • Timing delayed to afternoon, but same process time • On request of members, testing of nomination process has been added to all test days • Smart Orders are available in NWE Member Testing Settlement Date Simulation i Nomination Pr

  113. Slide 113: Local Member Tests: Smart Orders

    Local Member Tests Smart Orders • Smart Orders are available on Member Test environment already • Will remain available until (and after) NWE Go-live • From 28 October until 15 November, test auction will be organized by APX / Belpex • Smart orders will be available to see how matching results are p

  114. Slide 114: Local Member Tests: Automatic Order Submission Tool

    Local Member Tests Automatic Order Submission Tool • Scheduled to be available on Member Testing environment as of 23 October • Exact details will be communicated later • Will be available on Production environment prior to the NWE go-live • Please note that the Smart Orders functionality will only

  115. Slide 115: Disclaimer: messages and timings subject to change

    Disclaimer: All messages and timings are subject to changes after final testing. 115

  116. Slide 116: Conclusion

    CONCLUSION 116

  117. Slide 117: Belpex / Elia - Powering a world in progress

    beloe oat to Catia Powering a world in progress

  118. Slide 118: Summary

    SUMMARY 118

  119. Slide 119: PCR Process Timings for NWE

    PCR PROCESS TIMINGS for NWE • * This is the maximum time which could be used to solve a technical problem in order to avoid a decoupling. If the technical problem is resolved in less than 55 min than the next processes will start earlier. • ** the Second Auction in CWE / GB is a single process takin

  120. Slide 120: PCR Process Timings for NWE

    PCR PROCESS TIMINGS for NWE 120

  121. Slide 121: Full decoupling before OBK GCT (12:00)

    Full decoupling before OBK GCT (12:00) Case X10 Case X12 Case X11 Full decoupling Idem + Idem + before 12.00 delay 2nd Auction CWE OBK GCT = 12:00 Full decoupling Full decoupling Full decoupling Publication of prelimi- 42 min 42 min 42 min nary results =12:42 Max. Time 2nd Auction Notification /Flex

  122. Slide 122: Partial Coupling before OBK GCT (12:00)

    Partial Coupling before OBK GCT (12:00) Case X1 Case X2 Case X3a Case X3b Case X4a Case X4b Publication of prelimi- nary results =12:42 122

  123. Slide 123: Partial Coupling before OBK GCT (12:00)

    Partial Coupling before OBK GCT (12:00) • * In case X6b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are still coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose a nomination deadline, but • ins

  124. Slide 124: Partial coupling after OBK GCT (12:00)

    Partial coupling after OBK GCT (12:00) Case X7 Case X8 Case X9a Case X9b • * In case X9b, the NPS special procedure, being an iterative process, may take the same timeframe as when all markets are still coupled, but this is not relevant in a full decoupling since Nordic and Baltic TSOs do not impose

  125. Slide 125: Communication to the market - summarized

    Communication to the market - summarized Time/ Communication Message Other messages Deadline number CASC TSO Local PX 10:00 Risk of Partial/full Decoupling known in [ExC_03a/b] X advance 10:30 Partial/full Decoupling known in advance [ExC_05a/b] 11:15 Risk of partial decoupling for one or more [UMM_

  126. Slide 126: Communication to the market - summarized

    Communication to the market - summarized Time/ Communication Message Other messages Deadline number CASC TSO Local PX 13:00 • Delay in Market Coupling Results publication -> X Extension of notification deadlines 13:20 • Risk of Full Decoupling [EXC_03b] • Delay in Market Coupling Results publication

Elia Group — Investor Presentation (October 2013) on 6ix