Skylark Minerals Limited · ASX:SKM
Skylark Minerals — Ironbark Gold — Investor Presentation (December 2006)
13 slides from Skylark Minerals's investor presentation, December 2006
Slide 1: Broker Presentation - December 2006 Field Trip
BROKER PRESENTATION- DECEMBER 2006 FIELD TRIP poss Drilling at the Belara base metal project, November 2006 Ironbark: Focused on Gold and Base Metal Exploration and Development
Slide 2: Disclaimer
Disclaimer This Presentation has been prepared exclusively for the recipient and is not to be relied upon by anyone else. Ironbark Gold Limited (IBG) believe that the advice and information herein has been obtained from sources that are accurate and reliable, but it has not checked or verified the i
Slide 3: Directors and Officers
Directors and Officers Peter Duncombe Bennetto- Non Executive Chairman Banking and Investment +30 years experience Jonathan Charles Downes — Managing Director B.Sc Geol, MAIG Geologist ( exploration and acquisition ) + 12 years experience Adrian Paul Byass ~ Technical Director B.Sc Hon (Geol), B.Eco
Slide 4: Core Projects
Core Projects Ironbark has two advanced base-metal project in NSW which the company is currently focusing exploration activities on;- Belara: Advanced Cu-Pb-Zn-Ag project ~ currently being drilled, modeled and evaluated immediate Target 1-2MT @ 8% Zn eqv Captains Flat: Major Cu-Pb-Zn-Ag-Au producer
Slide 5: Going Forward
Going Forward . Within 6 months Define a resource at the Belara base metal project through drilling. Target +1MT from ist phase Explore the Jerangle base metal project (South of Captains Flat) Compile historic data at the Captains Flat base metal project and assess extensional and remnant ore potent
Slide 6: Belara
Belara History . Discovered < 1875 and worked intermittently to 1907. Mined grades 3-5% Cu, 2-4.5g/t Au and 60-90g/t Ag. 16 Diamond holes drilled by Cominco in 1968. Cominco estimated a strike length of 610m for Belara lode. Newmont (1980) estimated a mineral inventory of 700,000t at 0.85% Cu, 5.9%
Slide 7: Belara - Native Bee Long Section and planned drilling
Belara - Native Bee Long Section and planned drilling looking west +/-150m South [ea 21.3% Zn, 0.3% ro | North yt ag. , 1.5m @ 5.3% Zn, 4.39% PD, ~ 1 | 0.2m 37.0% Zn, 20% Pb, : A hare 08% Cu Belara shafts B40gH Ay, 0.9% Cu & ‘suriace. 16 «aon OBOE, "05.08.01 B18... 400 | j fom { i ; \ “ ® \ fo) ; a
Slide 8: Belara regional base metal targets
within historical Cu producing Feagion Ses Base metal targets Belara Project Ironbark has acquired considerable exploration tenure along strike and around the Belara Project. Upon completion of the first phase of drilling at Belara — Native Bee, regional exploration will commence with focus being gi
Slide 9: Captain's Flat
Captain’s Flat “Captain's Flat is second only to Broken Hill as a source of lead and zinc. In addition it will furnish large quantities of sulphur for the manufacture of superphosphates — so valuable to our agricultural industry.” NSW Parliamentary Debates, 8 December 1937 after the railway was cons
Slide 10: Lake George Mine
5 & F Lake George Mine Historieal Production ~aAN of re @ 0.7% Cu, 10% Zs Syinwy 8% Pb and 55 gitAg ed . Captains (St 3 inchidos * Flat i i 4.22 @ 12.4% Zn, $.4% Po add 6 inenbersiod t be lop of | fepeat ore lade rennnanerennnannt god i H H H i i i i i i i i | i pay " - . } . ; i Driling bow ming wo
Slide 11: Captains Flat
Captains Flat Lake George Mine . 0.7% Cuand 55 git Ag in historical Production AML @) 10% Zn, 6% Pb | Koatings Lode fn Ironbark is digitising historical working an for the first th rs ES eos roe faces | | a aout yo whee sera eae TSO - 1.2m @ 124% 2a, 4% Pb Jere piteesbenro tafe Hz Miri lois 720 - 3.
Slide 12: Lake George Mine (Captain's Flat)
Lake George Mine (Captain’s Flat) Returning the Lake George Mine at Captain’s Flat to production will be a high priority for Ironbark. Deep drilling beneath the historical workings has intersected primary mineralisation which is thought to represent a possible repeat of the Lake George mineralisatio
Slide 13: Other Projects
Other Projects: Ironbark has a selection of other wholly owned gold and base metal projects in NSW. These projects are considered to be valuable assets of the Company and will be evaluated in due course. + Stuart Town Historic goldfield that has a production history of at least 170k oz of gold. The
Ironbark Gold — Investor Presentation (December 2006) on 6ix