Westar Energy — Corporate Update (May 2005)
17 slides from Westar Energy's corporate update, May 10, 2005
Slide 1: Summary of Rate Application
Exhibit 99.1 Summary May 2, 2005 of Rate Application
Slide 2: Forward Looking Statements
Forward The with harbors Although Therefore, those Any afterfollowing forward-looking respect the in from any date Looking we actual such toliability. believe onpresentation future which results forward-looking Disclosure that operating statement such could thecontains statement expectations vary re
Slide 3: Contents
Overview Page Contents Kansas Depreciation Fuel Transmission Environmental Other Reliability-Based Timeline Adjustment Significant Retail 17 4 Rate Formula Case Cost Clause/Off-System Adjustments Sharing Change Highlights Recovery RateProposal 79 Rider 12 5 13 Sales 10 Sharing 8
Slide 4: Kansas Rate Review Overview
On Kansas Overview Retail Fulfills Unbundles Consistent Allows By FERC Simultaneous May rate formula transmission for July 2, review with Westar ROE statute, transmission 2003 filing transmission Southwest premium agreement with filed KCC rate allows Kansas two likely service must Power opportunitie
Slide 5: Kansas Retail Rate Case Highlights
Kansas Seeking Increase Requested Northern Southern Rates National Further Proposed Was Common about remain Retail closes $84.1 allows average territory difference rate average 32%among structure Case the million us at7.5 difference $47.8 6.0 $36.3 6.4 the to rates Highlights now the cents retain ce
Slide 6: Key Requested KCC Rate Base and Return Calculations
Requested Key KCC Excludes Reflects Principally Calculations jurisdictional rate FERC rate deferred base ofjurisdictional in return credits rate Retail income base –ofsummarized Case $626 taxes ofrate $2.3 million base billion 1/ of approximately $326 million Common equity Capital % of Component Cos
Slide 7: Depreciation Rate Change
Depreciation New In Reduced Direct A Proposed Does Increases subsequent 2001 depreciation not impact case annual challenge cost increases KCC Rate KCC on ofrevenues negative cash rates Change ordered in longer order depreciation flow, required by net plant lower but approximately salvage no lives de
Slide 8: Fuel Clause/Off-System Sales Sharing
Fuelchange Monthly Two Proposed $24 No Sliding $24-$32 $>32 Sharing million Adjustment month adjustment million—75% scale through million—50%/50% adjustment off-system from lag credit sharing toclause fuel what Clause/Off-System true built Westar/25% based sharing adjustment thereafter exists up int
Slide 9: Transmission Formula Rate
Transmission Revenue FERC Retail Will Authorized Simultaneous Includes Rate appear expected revenue filing FERC requirement by as toformula Formula FERC to an Kansas requirement create formula be unbundled effective filing associated arate statute Rate FERC-approved ROEwill line December plus includ
Slide 10: Environmental Expenditures Pending and Uncertain
Environmental Pending Uncertain Particulates Mercury NOX SOX We Expenditures First Follow-on Low Potential Other have NOX projects projects environmental identified rebuild legislative projects burners are could as Cost of likely needed at the may scrubbers be Recovery and Jeffrey significantly pote
Slide 11: Environmental Cost Recovery Rider
Environmental Propose Revenue True Adequate Advantages Avoid Send Minimizes Present up proper more case and arequirement and tracking total frequent rebundle price seeks timely Cost cost signals to mechanism Recovery to rate cost establish costs related customer cases with recovery into subsequent t
Slide 12: Other Significant Rate Case Adjustments
Other Rematch COLI In Spread Smooth Asking Unamortized Imputed Ratebase Recovery Recover Annual 2001 thisSignificant was review COLI the revenue case the $49 deferred COLI deduction of originally Commission COLI costs KCC million gain benefits we credits requirement Adjustments income seek related c
Slide 13: Reliability-Based Sharing Proposal (Alternative Ratemaking)
Reliability-Based (Alternative Ratemaking SharingProposal) Proposal
Slide 14: Reliability-Based Sharing Proposal Overview
In addition Overview Three-year Provide Less Improved Basic Establishes Annual Earnings No Entire opportunity satisfactory construct bandwidth review, incentives above customer to trial a midpoint theusing for 12.5% period, customer traditional moves to Westar service improve abbreviated, shared ROE
Slide 15: Five Customer Service Quality Measures
Five Customer Customer System Answered Actual Equivalent Each Maximum Deadband measure meter average service movement can call weighted forced reads scored never rate Service interruption quality outage average go along based Quality above scored rate aon duration frequency bandwidth five (EFOR) 13.
Slide 16: ROE Bandwidth Dynamics
ROE 50% Upper Midpoint Lower If Entire DEADBAND ROE earned of Bandwidth 200 bound bound isROE value of more basis 11.5% of goes ofisthan 12.5% 10.5% point Dynamics more to200 customers deadband than basis 100points basis moves above points up or11.5% below downmidpoint, the a maximum midpoint, then
Slide 17: 2005 Rate Case Approximate Timeline
2005 Rate Approximate Pre-file (April Company (May Interveners Discovery Interventions (~August Rebuttal (~September Public Technical Conference Pre-hearing (~October (~November Briefs (December Decision Rates (January 2005) implemented 2005) hearings notice testimony 2006) 2005) hearings files Case