Slide 1: iCem Service
iCem® Service Achieving wellbore integrity with sound, technical decision making © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 2: Increasing the Probability of Wellbore Integrity
Increasing the Probability of Wellbore Integrity Sound technical decisions rely on: – Field-proven technical solutions – Laboratory-driven empirical data And now the most robust cementing design tool available in the industry: iCem® Service Drive better decisions by collaboratively conducting iter
Slide 3: iCem Service – Wellbore Integrity
iCem® Service – Wellbore Integrity Increasing the probability of Water Aquifer a successful cementing job • Restrict fluid movement between formations • Bond and support Hydrocarbon Zone the casing Hydrocarbon Zone © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 4: iCem Service – Analysis for the Life of the Well
iCem® Service – Analysis for the Life of the Well Drilling Completion Production BENEFITS OF LIFE-OF-THE-WELL CEMENTING Long-Term Zonal Isolation Help Increase Production and Minimize the Occurrence of Sustained Casing Pressure Help Minimize Remedial Costs Help Minimize Environmental Impact © 2011 H
Slide 5: General Cementing Job – Process Overview
General Cementing Job – Process Overview Solution Development Job Execution Results Evaluation Finite Element Density Control Bump the Plug Analysis High-Capacity Blender Cement Bond Log Computational Fluid Dropping the Plug Dynamics Bulk Delivery and Feed Cement Sheath with optimum
Slide 6: iCem Service – Process Overview
iCem® Service – Process Overview Solution Development Job Execution Results Evaluation Well Configuration Real-Time Data Future Design Formation Properties ECD (calculated) Optimization Casing Properties Fluid Volumes & Analysis of ECDs, Fluid Operational Loads Densities Volumes, F
Slide 7: Legacy Discrete Software Now Consolidated
Legacy Discrete Software Now Consolidated OptiCem™ Software Cement Job Simulation Finite Element Analysis Displace 3D® Simulator Displacement models in 3D iCem Computational Fluid Dynamics ® WellLife® Express Service Cement Sheath Stress Analysis Service Finite Element Analysis Data Acquisition Fiel
Slide 8: iCem Service
iCem® Service © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 9: Two-Dimensional Hydraulic Simulation
Two-Dimensional Hydraulic Simulation Equivalent circulating density (ECD) management Dynamic temperature affects on fluid properties Pump schedule design – With and without foam cement – Volume to achieve TOC Balanced plug Standoff Torque and drag Surge and swab Mud removal and erodi
Slide 10: Two-Dimensional Hydraulics Simulation – Interactive temperature profile graph
Two-Dimensional Hydraulics Simulation Interactive temperature profile graph – Casing temperature – Annular temperature profiles – Bottomhole circulating temperature © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 11: Two-Dimensional Hydraulics Simulation – Cement stages temperature
Two-Dimensional Hydraulics Simulation Cement stages temperature tracker © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 12: Three-Dimensional Displacement Simulator
Three-Dimensional Displacement Simulator Fluid interface Fluid placement over time at all depths – Drilling fluid – Spacer – Lead cement – Tail cement Helps determine spacer volume to avoid contamination of cement © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 13: Three-Dimensional Displacement Simulator
Three-Dimensional Displacement Simulator Conforms to highly eccentric Achieve optimum casing standoff annuli or localized washout Determine impact of pump rate Predict Material Volumes to Determine impact of pipe rotation – Avoid contamination and reciprocation – Achieve top of cement (TOC
Slide 14: Three-Dimensional Displacement Simulator
Three-Dimensional Displacement Simulator The same data can 70% be represented both in a graph (above) or a cross section of the well (below) 10% Helps determine a volume of spacer for optimized Direct correlation displacement. of data. In this example further iterations are required to develop a
Slide 15: Cement Sheath Stress Analysis
Cement Sheath Stress Analysis Examines Effects of Planned Well Operations on Specific Cement Designs Cement hydration Shoe pressure testing Fracturing / stimulation Completion fluid change out Injection and production Evacuation / unloading Well kill © 2011 HALLIBURTON. ALL RIGHTS RESE
Slide 16: Cement Sheath Stress Analysis
Cement Sheath Stress Analysis Predicts the competence of a cement sheath Generates mechanical properties for the sheath to survive downhole stress conditions Simulator elements – Properties of the formation – Well structure – Long-term critical well conditions Operation Type MD TVD Pre-Job Tem
Slide 17: Cement Sheath Stress Analysis – "What If?"
Cement Sheath Stress Analysis – “What If?” Reports on performance differing cement systems allowing cost analysis Enables decisions based comparisons of cementing mechanical properties – Young’s Modulus – Poisson’s Ratio – Shrinkage – Thermal expansion – Compressive strength – Tensile strength –
Slide 18: Real-Time Data Acquisition and Monitoring
Real-Time Data Acquisition and Monitoring Real-time collection and graphing of cementing operations data – Equivalent circulating densities (ECDs) – Pump pressure – Pump rate – Fluid volume – Fluid density – Scores © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 19: Real-Time Data Acquisition and Monitoring
Real-Time Data Acquisition and Monitoring Evaluation of pre-job simulations against recorded job data – During or after the job – Identification of probable causes of irregularities on the job – Enables optimization of future designs © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Slide 20: Case History – Field Application
Case History – Field Application Poor CBL from Excellent CBL after simulations Challenge (Libya) previous wells designed solution modifications – Poor cement bond log (CBL) results from first two production wells in a new field Solution – Three-dimensional displacement Simulation and cement shea
Slide 21: Case History – Field Application
Case History – Field Application Challenge (Shale North America) – Highly stressed formation subjecting wells to excessive washout, sloughing shales, stuck pipe, and poor cement jobs Solution – iCem® service simulation revealed risks of debonding and causes of sheath failure over time due to wel
Slide 22: Case History – Field Application
Case History – Field Application Challenge (HPHT) – High profile eastern-hemisphere wells for a major operator in a field where previous wells experienced • Gas migration and channeling issues • Expense and delay of remedial cementing operations Solution – Eight (8) iCem® service simulations run
Slide 23: iCem Summary
Summary Slurry Job Plan Surge & Swab Design Avoidance Cement Centralizer Mechanical Selection Properties Cement Sheath iCem® Casing Placement Service Analysis Torque & Achieve Top- Drag of-Cement Minimization ECD Mud Management Conditioning Avoid Cement Displacement Contamination Efficiency © 2011 H
Slide 24: iCem Service – Questions?
iCem® Service Questions? © 2011 HALLIBURTON. ALL RIGHTS RESERVED.