Slide 1: Fleet Status Report
Fleet Status Report 11 August 2C Borr Drilling Limited $.E Pearman Building, 2nd Fi, 9 Par-la-Ville Road, Hamilton HM11 Bermuda yuiries: marketing @borrdrilling.com
Slide 2: New Contracts / Extensions / Amendments
Borr Drilling Fleet Status Report - 11 August 2026 New Contracts / Extensions / Amendments Idun • Contract: July 2026 to September 2026, Undisclosed (Vietnam) Gunnlod • Contract: August 2026 to April 2027, PVEP-NCS (Vietnam) Prospector 1 • Contract Extension: September 2026 to April 2027, One-DYAS (
Slide 3: Other Developments
Borr Drilling Fleet Status Report - 11 August 2026 Other Developments Skald • Commenced operations with Vestigo Petroleum in Malaysia in late May 2026 Prospector 5 • Concluded operations with Eni in Congo in late May 2026 and commenced operations with BW Energy in Gabon in early July 2026 Joro • Con
Slide 4: Fleet status: contracted rigs
Borr Drilling Fleet Status Report - 11 August 2026 Rig Water Rig Name Rig Design Year Built Customer / Status Contract Start Contract End Location Comments Depth (ft) Contracted Rigs Arabia I KFELS B Class 400 ft 2020 Petrobras 3 April - 2025 April - 2029 Brazil Operating with option to extend Arabi
Slide 5: Fleet status: available rigs and fleet totals
Borr Drilling Fleet Status Report - 11 August 2026 Rig Water Rig Name Rig Design Year Built Customer / Status Contract Start Contract End Location Comments Depth (ft) Available Rigs 1 Freyja F&G, JU-3000N 400 ft 2014 Singapore Warm Stacked Groa PPL Pacific Class 400 400 ft 2018 United Arab Emirates
Slide 6: Rig contract coverage by region
Borr Drilling Fleet Status Report - 11 August 2026 2026 2027 Rig Name Location Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Southeast Asia Gunnlod Vietnam HLHV JOC TLJOC PVEP-NCS Option Idun Vietnam PTTEP Undisclosed HLHV JOC Mist Thailand/Malaysia Valeura Energy Sarawak Shell Saga Brunei Brunei Shell Petroleum Option S
Slide 7: Additional information and Forward Looking Statements