  1. Slide 1: 2013 Annual General Meeting Presentation

    For personal use only Proving that low costs pay dividends 12,178gpt intersection at Paulsens 2013 ANNUAL GENERAL MEETING PRESENTATION

  2. Slide 2: Disclaimer: Competent Persons Statements

    Disclaimer Competent Persons Statements • The information in this announcement that relates to Paulsens and Ashburton mineral resource estimations, exploration results, data quality, geological interpretations, potential for eventual For personal use only economic extraction and estimates of explora

  3. Slide 3: Team with a track record

    Team with a track record Shares Options Board - Successful record in discovering and developing mines For personal use only Total 424M 5M BILL BEAMENT Managing Director (Mining Engineer) * As at 19th November 2013 Non Executive Chairman – Independent CHRIS ROWE (Barrister and Solicitor) Share price:

  4. Slide 4: Northern Star: an abridged history

    Northern Star: an abridged history For personal use only • Acquired Paulsens Gold Mine in Western Australia for A$40M in July 2010, repaid full acquisition within 7 months • Expanded production rate to 100,000oz/pa • Greatly extended the mine life to +5 years • Purchased Ashburton Project and FMG JV

  5. Slide 5: Company: FY2013 Financial Performance

    Company: FY2013 Financial Performance • Increased Company net profit after-tax by 30% to A$28.3M For personal use only • Non-cash “write downs” of $10M on exploration and investments • EBITDA up 29% to $63.8M and earnings per share up 29% to 6.6¢ • Cash cost down 5% to $680/oz, all-in sustaining cos

  6. Slide 6: Paulsens – Performance, Productivity Drive and Cost Cutting

    Paulsens – Performance, Productivity Drive and Cost Cutting PRODUCTION GROWN For personal use only • Record FY2013 performance, 104koz mined, 93koz sold and 89koz recovered • Increased productivity by 100% in ore tonnes, now consistently mining at 500,000 tonnes per annum • De-risked the mine with c

  7. Slide 7: Voyager & 2: The Paulsens Engine Room

    Voyager 1 & 2: The Paulsens Engine Room For personal use only • Voyager 1 is the flagship lode at Paulsens, runs at a rich 1,250–2,000 ounces per vertical metre • Currently mining 600m below surface. Mineralisation drilled to 950m and remains open at depth • Voyager 2 was discovered by NST in late 2

  8. Slide 8: Upper Levels: one man's waste is another's treasure

    Upper Levels: one man’s waste is another's treasure For personal use only • Large part of upper mineralised structure not mined by previous owners due to hedging and other factors • Resource stands at 92koz1 @ 10gpt • Upper Levels expected to contribute 10,000-15,000ozpa of high-grade low cost produ

  9. Slide 9: Ashburton – a 100,000ozpa stand-alone operation

    Ashburton – a 100,000ozpa stand-alone operation • Project has been deferred, however strategy For personal use only changed to free-milling oxide project early 2013 • Ashburton Project located within trucking distance of Paulsens • Acquired in June 2011 for zero cash payment; royalty payable on prod

  10. Slide 10: Exploration: writing the next chapter for Northern Star

    Exploration: writing the next chapter for Northern Star For personal use only • Very little exploration done within 50km radius of the 1Moz Paulsens deposit • Recently expanded our tenement package to 8,500km2 with FMG JV deal on all non-iron ore rights across the Ashburton region • Now hold vast tr

  11. Slide 11: Exploration: The Titan Discovery

    Exploration: The Titan Discovery • High-grade Titan discovery made just 100m For personal use only from Paulsens mine infrastructure • Discovery hole returned 6.9m at 24.7gpt • Titan runs parallel and immediately adjacent to the producing Voyager 1 and 2 lodes • Discovery has strong potential to be

  12. Slide 12: Exploration: the gold may be as green on the other side of the fence

    Exploration: the gold may be as green on the other side of the fence For personal use only • Paulsens is bounded by a Gabbro unit, traditionally seen as a ‘fence’ around the orebody • Drilling aimed at testing the theory that the mineralisation is deposited on the other side of Gabbro and itself min

  13. Slide 13: Exploration: Paulsens Mine Corridor

    Exploration: Paulsens Mine Corridor For personal use only • Great potential on the highly prospective “Paulsens Mine Corridor” part of the Nanjilgardy Fault, 25-40km long corridor along the axis of Wyloo Dome • All known orebodies and mineralisation, including the Paulsens Gold Mine lie inside this

  14. Slide 14: Exploration: Kazput Coal Discovery

    Exploration: Kazput Coal Discovery • Significant coal discovery just 60km from For personal use only Paraburdoo and 100km from Paulsens Gold Mine • Initial Exploration Target of 340-615M tonnes3 with thick thermal coal intersections of up to 65m along a 7km strike • Initial analysis shows the coal w

  15. Slide 15: FY2014: Production and Cashflow Guidance

    FY2014: Production and Cashflow Guidance • Key FY2014 forecasts @ Gold Price A$1,450/oz: For personal use only • Total production of 100-115koz • Cash Costs C1 of A$610-690/oz (inclusive of all royalties) • All-in sustaining costs of A$900-1,050/oz (inclusive of all royalties) • Capital expenditure

  16. Slide 16: Key reasons to invest in Northern Star

    Key reasons to invest in Northern Star • Extremely strong cash generation from high-grade and high-margin ounces For personal use only • Expect FY14 all-in sustaining cost to be ~$1,000/oz • Growing production to underpin surplus cash growth • Sufficient resources to secure +5 year mine life, with f

  17. Slide 17: Contact Details

    For personal use only Proving that low costs pay dividends 12,178gpt intersection at Paulsens • Contact Details: • Bill Beament – Managing Director +61 8 6188 2100 • Email – [email protected] • Website – www.nsrltd.com

  18. Slide 18: Appendix: Gold Mineral Resources and Reserves

    Appendix GOLD MINERAL RESOURCES 1 GOLD MINERAL RESERVES1 For personal use only As at 30 June 2013 MEASURED (M) INDICATED (I) INFERRED (Inf) TOTAL (MI&Inf) Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Cut Off As at 31 December 2012 PROVED PROBABLE PROVED and PROBABL