Mitsubishi Heavy Industries, Ltd. · TSE:7011
Mitsubishi Heavy Industries — Sixth Annual Conference on Carbon Capture & Sequestration 2007
15 slides from Mitsubishi Heavy Industries's conference presentation, May 2007
Slide 1: Sixth Annual Conference on Carbon Capture & Sequestration
Sixth Annual Conference on Carbon Capture & Sequestration Session Title: Retrofitting of Existing Coal-Fired Plants MHI’s Post Combustion CO2 Recovery Process for Coal Fired Power Stations: Requirement for a Large Scale Demonstration Plant Ronald Mitchell Environmental Plant Department - Mitsubishi
Slide 2: Introduction – The 'Issues'
INTRODUCTION – The ‘Issues’ The issue of Climate change is now in the homes and businesses of communities throughout the world Energy demand is ‘young’ and cheap oil is becoming scarce – Future impact of high prices and energy security? Recent expansion of global carbon markets – Market mechanisms a
Slide 3: Background
BACKGROUND Coal looks certain to remain the principal fossil fuel for Power Generation in the foreseeable future Clean coal technology development is great but what about the existing plants? CO2 capture retrofit ability is critical MHI offers a solution today – a commercially proven, high performan
Slide 4: Commercial Delivery Record
COMMERCIAL DELIVERY RECORD Malaysia Japan India Petoronas Chemical Co. IFFCO 1999~ 2005~ Dec 2006~ 200 t/d 330 t/d 450 t/d Urea General use Urea OTHER UAE China India Middle East India PROJECTS IFFCO Project FEED FEED Awarded Awarded Dec Status Complete Complete Project Project 2006~ Nat. Gas. Flue
Slide 5: Evolution of MHI R&D Flue Gas CO2 Recovery Projects
Evolution of MHI R&D Flue Gas CO2 Recovery Projects Evolution 90 91 92 ~ 00 01 02 03 04 05 06 07 Nanko Pilot Plant (2 Tonnes/day) R&D for Process Improvement 1 Ton/Day Pilot Test Completed Long Term Demo. Plant Test Starts Coal Fired Large Scale Plant Design Ready Flue Gas Coal Fired Demo Plant Resu
Slide 6: Coal Fired Long Term Demonstration Plant
Coal Fired Long Term Demonstration Plant DEMO PLANT OUTLINE Client : Power Station, Japan Solvent : KS-1 Capacity : 10 T/D Feed Gas : Coal Fired Boiler (14.1 v% CO2) Start-up : July 2006 Location : Nagasaki, Japan Development Results Increased understanding of the effects of impurities on the syst
Slide 7: Large Scale Coal-Fired CO2 Capture Demonstration Plant – Why MHI?
Large Scale Coal-Fired CO2 Capture Demonstration Plant – WHY MHI? MHI has completed extensive R&D programs which features 17 years of robust initiatives leading to technology refinement and an advanced understanding of CO2 capture from flue gas streams After successful completion of our small scale
Slide 8: Process Flow for Amine Absorption
PROCESS FLOW FOR AMINE ABSORBTION Feature of Process: Comparison with MEA Process Flue Gas MEA KS-1 Outlet CO2 Circulation Rate 1 0.6 Purity : 99.9 % Regeneration Energy 1 0.68 Solvent Degradation 1 0.1 ABSORBER STRIPPER Solvent Loss 1 0.1 (Regenerator) Corrosion Inhibitor Yes No C.W. Existing Deep
Slide 9: CO2 EOR in North America – Why?
CO2 EOR in NTH AMERICA – WHY? Large Number of oil fields in production decline Existing CO2 infrastructure and mature downstream technology Regional reliance on ‘cheap’, local fossil fuels (coal) for power generation Recent Government shift regarding climate change policy (support through ta
Slide 10: CO2 – What Can We Do?
CO2 – WHAT CAN WE DO? PROBLEM The issue of CO2 and global warming is evolving faster than the world anticipated R&D requires significant time and resources How should we prepare for future CO2 regulation? SOLUTION MHI offers a phased, realistic approach The logical next step is to apply a
Slide 11: MHI's Proposed Phased Approach to Commercialization of CO2 Capture Technology
MHI’s Proposed Phased Approach to Commercialization of CO2 Capture Technology for Coal Fired Boilers MHI’s Operating Experience 1 t/d 2 t/d 10 t/d 200 t/d 330 t/d 450 t/d 800 t/d 500-3000 t/d 3000 t/d 5000 t/d Pilot & small scale demonstration Commercial Experience FEED Large Scale Basic Design Comm
Slide 12: Electricity & CO2 Sales Model Evaluation
Electricity & CO2 Sales Model Evaluation CO2 Capture Case + Electricity Sales Business As Usual + CO2 Sales Vs + Electricity Sales Site utilities - CAPEX/OPEX - Site Utilities (30 MW) - Energy Penalty CO2 Capture & Compression CO2 Sales $20 $50 Price Feasible Zone of CO2 capture case 500
Slide 13: Conclusions
CONCLUSIONS ¾ Coal has a number of advantages distinguishing it from other fuels (price, stable supply & abundance) ¾ It will take a suite of technologies to ‘make a difference’. MHI’s post combustion CO2 capture process is available new and for retrofit and, most importantly, is commercially proven
Slide 14: Thank You
Are you ready to tackle CO2 emissions? Courtesy: The Age Illustration: Ron Tandberg THANK YOU
Slide 15: Further information
Further information; Ronald Mitchell Manager Business Development Environmental Plant Department Mitsubishi Heavy Industries Ltd., Yokohama, JAPAN Phone: +81-45-224-9400 Cell Phone: +81-90-4420-3941 E-mail: [email protected] Web: http://www.mhi.co.jp/mcec/product/recov_co2/
Mitsubishi Heavy Industries — Sixth Annual Conference on Carbon Capture & Sequestration 2007 on 6ix