Slide 1: Analyst Day Presentation August 26, 2014
www.sanchezenergycorp.com Results Driven. Manufacturing Focused. Analyst Day Presentation August 26, 2014
Slide 2: Legal Disclaimers
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Legal Disclaimers Forward Looking Statements This presentation contains, and our officers and representatives may from time to time make, “forward-looking statements” within the meaning of the safe harbor provisions of the Private Securities Litiga
Slide 3: Agenda
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Agenda 3 Topic Presenter Company Overview 9:00 am – 9:15 am Tony Sanchez, III President & CEO Operations 9:15 am – 10:00 am Chris Heinson, SVP, COO Steve Adam, SVP, Operations Will Satterfield, SVP, Asset Development Asset Detail 10:00 am – 12:00 p
Slide 4: Company Overview
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Company Overview 4
Slide 5: Key Considerations
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Key Considerations 5 Attractive, Low- Risk Growth Plan . One of the fastest growing E&P companies in North America - Strong, successful history of reserve, production and EBITDA growth since our IPO - Organic growth through the drill-bit complement
Slide 6: Eagle Ford Shale Position
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Eagle Ford Shale Position 6 SN Eagle Ford Position Summary Net Acres ~224,000 Current Production (Boe/d) ~37,000 Operated Rigs Non-Operated Rigs Gross Producing Wells 422 Alexander Ranch Briggs Ranch Hausser Wycross Talbutt Trust
Slide 7: Transformational Growth
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 7 Transformational Growth At IPO (12/31/11) Today (6/30/14) Production •609 Boe/d •37,000 Boe/d Proved Reserves •6.7 MMBoe •14% PD •117 MMBoe •51% PD PV-10 •$152 million •$1,977 million LTM Revenue •$15 million •$216 million (1) LTM Adj. EBITDA •$6
Slide 8: Delivering Strong Results
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 8 Delivering Strong Results - 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 (MBOE/D) Actual PF Catarina Production 2012 2013 2014 $0 $50 $100 $150 $200 $250 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 ($ Millions) Actual PF
Slide 9: 2014-2015 Production & Capital Guidance
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 9 2014-2015 Production & Capital Guidance 2014 2015 SN Standalone $565 - $615 $700 - $750 Catarina 205 - 215 330 - 370 Total Pro Forma D&C Capital Plan $770 - $830 $1,030 - $1,120 SN Standalone Facilities, Leasing, and G&G 55 50 - 55 Catarina Facil
Slide 10: Capital Expenditures Focused On Eagle Ford
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina $205 - $215 Marquis $270 - $285 Palmetto $45 - $55 Cotulla $50 - $60 Wycross $140 - $150 TMS $60 - $65 Capital Expenditures Focused On Eagle Ford (1) 10 Eagle Ford: 92% 2014 Drilling & Completion Capital Plan By Area ($MM) Gross % of % of
Slide 11: Analyst Day Highlights
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 11 Analyst Day Highlights . Deep inventory of high-return, low risk locations underpins growth - 2,800+ net drilling locations . 2015 production guidance midpoint ~55,000 boe/d . Low cost and efficient producer - Technically driven corporate cultur
Slide 12: Operations: A Manufacturing Transformation
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Operations 12 A Manufacturing Transformation
Slide 13: Manufacturing Culture
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Manufacturing Culture 13 “Highly collaborative company focused on being data driven and consistently generating increasing returns.” . Experienced petro-technical staff - Multi-basin experience . Cross-functional communications - Asset teams . Supp
Slide 14: Operational Strategy
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Operational Strategy 14 Asset Exploitation Capital Efficiency Strategic Acquisitions Sustainable Return Oriented Growth Organic Growth
Slide 15: Asset Exploitation
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Asset Exploitation 15
Slide 16: Asset Development Life Cycle
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Asset Development Life Cycle 16 . Appraisal - Vertical Wells and Cores - 2D and 3D Seismic - Areal Extent Determination . Data Integration - Landing Depth and Well Placement - Lateral Length - Completion and Frac Design . Harvest - Well Spacing - M
Slide 17: Marquis Prost Project Cycle
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Prost Project Cycle Example 1 pilot + development well (LEF) 3D seismic; 2 pilots; 6 LEF appraisal wells 6 pilots, 45 LEF development wells, additional acreage additions 17 6 pilots, 75- 85 LEF development wells; UEF appraisal; UEF & Buda s
Slide 18: Tailored Programs Enhancing Returns
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Tailored Programs Enhancing Returns 18 Down spacing pilots Buda open hole lateral development UEF standalone, UEF/LEF stacking overlap Down spacing pilots, UEF/Buda tests Longer laterals, down spacing pilots Longer laterals, higher proppant load tr
Slide 19: Stacked Lateral Potential
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Stacked Lateral Potential 19 Upper Eagle Ford Buda Lower Eagle Ford Target 2 Lower Eagle Ford Target 1 Marquis Palmetto Cotulla- Wycross Cotulla-La Salle/Frio Catarina Development Appraisal
Slide 20: Return Focused Completion Design
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Return Focused Completion Design 20 Well designs are customized to maximize net present value Fracture Simulation Size NPV $0.0 Wycross Target Window
Slide 21: Capital Efficiency
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Capital Efficiency 21
Slide 22: Anatomy of a Well Cost
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Anatomy of a Well Cost 22 Drilling Completions Facilities Lift Design and Process Driven Unit Cost Driven - Proppants - Chemicals - Tanks - Artificial Lift - OCTG - Facilities Examples . Supply Chain . Demand Planning . Direct Sourcing . Design imp
Slide 23: Operational Support System (OSS) Overview
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Operational Support System (“OSS”) Overview 23 Home Page • Shows Tasks and Action Items assigned to user Action Items • Logging and tracking of needed actions • Assigned to individuals • Appears in users’ Home page Well Master Centralized database
Slide 24: Supply Chain Management – Strategic Sourcing Approach
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Secured first-order savings by optimizing suppliers and terms . Leverage OSS forecasts to secure additional price and logistical savings . Apply direct sourcing techniques . Rigorously negotiate contracts . Drive sustainable advantages 24 Industr
Slide 25: Well Cost Reductions – SN Competitive Advantage
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Well Cost Reductions – SN Competitive Advantage 25 $9.5 $7.3 $12.9 $0.0 $2.0 $4.0 $6.0 $8.0 $10.0 $12.0 $14.0 $MM SN Competitive Advantage Appraisal Well Multi-Well Pad + Zipper Frac Savings Field Development and Well Design Savings
Slide 26: Drilling Process Commercialization
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 26 Drilling Process Commercialization $- $200 $400 $600 $800 $1,000 $1,200 $1,400 0 2 4 6 8 10 12 Prost C3Prost C4Prost C5Prost C6Prost D1Prost B5Prost B4 Cost/Foot ($) Days Rotary Steerable (“RSS”) Days Avg Cost per Foot ($) $- $200 $400 $600 $800
Slide 27: Completions Process Efficiencies
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Completions Process Efficiencies . Mapped completion processes - Parallel and competing initiatives . Cross-functional integrations - Contingency planning . Critical sourcing and resources - Non-dedicated services . Carry-forward documentation - Le
Slide 28: Cost Improvement Initiatives
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 30% Decrease in Total Well Cost Across Assets > 100% Increase in Number of Frac Stages Pumped Per Day 35% Increase in Average Ft. Drilled Per Day 40% Decrease in Spud to TD . Supply Chain leveraging OSS planning - Secure critical services and logis
Slide 29: Strategic Acquisitions
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Strategic Acquisitions 29
Slide 30: Acquisition History
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acquisition History 30 Acquisition : Catarina Timing : June 2014 Purchase Price ($MM) : 639 Acquisition : Cotulla Timing : May 2013 Purchase Price ($MM) : 265 Acquisition : Five Mile Creek Timing : July 2013 Purchase Price ($MM) : 29 Acquisition :
Slide 31: Acquisition Strategy
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acquisition Strategy 31 1. Cost structure improves return of capital following acquisition 2. Less expensive alternative to leasing with reduced risk and lease expiration burden 3. Maintain conservative financial position post acquisition Opportuni
Slide 32: Scalable Organization Prepared for Growth
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Scalable Organization Prepared for Growth 32 Process Driven Project Management . Rigs and frac spreads fully utilized immediately following acquisition . “Bullpen” of drill ready locations provides options to accelerate development or shift resourc
Slide 33: Cost Reductions Expanding Core
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cost Reductions Expanding Core 33
Slide 34: Cotulla Acquisition Area
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Acquisition 34 Area Locations Valued at Acquisition 1P Value 3/31/13 ($MM) 2P Locations 2P Value 6/30/14 ($MM) Alexander Ranch 46 241 73 400 Briggs Ranch 8 17 23 58 Talbutt 5 7 14 38 Wright Ranch 5 10 15 22 Cenizo 9 16 20 24 Total 78 $291 1
Slide 35: Optimization of Alexander Ranch
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Optimization of Alexander Ranch 35 $- $2.0 $4.0 $6.0 $8.0 $10.0 Previous Operator 3Q13 4Q13 1Q14 ($MM) Drilling Completions Facilities 5 Wells 8 Wells 7 Wells • Acquisition Date (5/31/13) • SN results include production facilities & expected initia
Slide 36: Catarina Acquisition Rationale
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina Acquisition Rationale . Immediately accretive to EPS, CFPS, production per share and reserves per share . $10.65 per BOE based on Ryder Scott YE13 Proved Reserves - $17.75 per BOE Proved Developed Reserves . $26,374 per 1Q14 production BOE
Slide 37: Asset Detail
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Asset Detail 37
Slide 38: Catarina Asset
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 38 Catarina Asset
Slide 39: Catarina Map
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 39 Catarina Map
Slide 40: Catarina Overview
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina Overview 40 Total Net Acres ~106,000 Average Working Interest 100% Average Net Revenue Interest 75% Planned Well Spacing (Acres) 75 – 100 Net Identified Drilling Locations 600 - 1,000 Gross Wells On Production (1) 176 Awaiting / Undergoing
Slide 41: Catarina Status Update
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 41 Catarina Status Update . Since closing the acquisition on June 30, we have moved swiftly to develop Catarina - After brief transition period with Shell, SN took over full operations on August 1 . Drilling: 2 rigs pad drilling on Western Side - A
Slide 42: Western Catarina Offset Operator Performance
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Catarina Western Catarina Offset Operator Performance 42 . The Western Catarina area contains similar subsurface attributes to the direct offset operators in the Lower Eagle Ford (LEF) formation, which have seen excellent results Source: Data per p
Slide 43: SN Catarina Development
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation A3 PILOT TOC 0 10 SN Catarina Development . Focus on TOC rich Lower Eagle Ford . Target zone of Rosetta, APC, SM, etc. (all offsetting operators) . Multiple targets in both the Upper Eagle Ford and Lower Eagle Ford . Varied completions based on pro
Slide 44: Western Catarina Development Plan
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . SN intends to target the Lower Eagle Ford (LEF) with additional infill potential in the Upper Eagle Ford (UEF) as a secondary target . The majority of wells drilled in Catarina thus far have targeted the UEF at ~100 acre spacing - SN believes tha
Slide 45: Regional Cross Section of Lower Eagle Ford
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Successful SN wells from Alexander Ranch and Briggs Ranch have similar LEF core & log rock quality as the Eastern Catarina area . 3D Seismic and key appraisal wells over acreage position to guide the ~37,000 undeveloped net acre evaluation Region
Slide 46: Optimization of Base Production – Tubing Installation
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Optimization of Base Production – Tubing Installation Catarina Well Sample EUR Comparison (Tubing vs. No Tubing) Tubing No Tubing * Analysis based on South-Southwest area wells using 2-stream EURs EUR (2-Stream MBoe) Cumulative Probability ~120 MBo
Slide 47: Catarina Upper Eagle Ford Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Upper Eagle Ford (450-500 MBoe EUR) Catarina Upper Eagle Ford Economics 47 Western Catarina Area Previous Operator Upper Eagle Ford Results
Slide 48: Catarina Prospective Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 0 200 400 600 800 1,000 1,200 0 12 24 36 48 60 72 84 96 108 Av erag e Mont hly Prod uction (Bo e/d) Months 700 MBoe 600 MBoe Catarina Prospective Economics 48 Western Catarina Area Lower Eagle Ford Type Curves and Well Economics (1) 1. Assumes $95
Slide 49: Tuscaloosa Marine Shale Asset
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Tuscaloosa Marine Shale Asset 49
Slide 50: Acreage Position and Activity
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acreage Position and Activity 50 . ~58,000 net acre position in the core of the TMS - Contiguous blocky acreage with 3+ years of average remaining lease term . SN anticipates spudding up to 4 gross (2 net) operated wells including participating in
Slide 51: Sanchez Position in Core of the TMS
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Sanchez Position in Core of the TMS 51 SN’s acreage position is highlighted in yellow
Slide 52: Tuscaloosa Marine Shale
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Tuscaloosa Marine Shale 52 . Industry increases in TMS related capital spend expected to continue . Experience gained in Eastern Eagle Ford key in quickly commercializing acreage . Geopressure and abundance of natural fractures driving high product
Slide 53: Keys to Exploiting TMS
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Mechanical earth modeling . Reservoir characterization . Casing designs (upper & lower TMS) . Drill strings and BHA design optimization . Mud rheological properties Technical Operational 53 Keys to Exploiting TMS . Utilizing Eagle Ford leverage t
Slide 54: New Growth Cycle - TMS Development Potential
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation New Growth Cycle - TMS Development Potential 54 118% 43% 0% 20% 40% 60% 80% 100% 120% 140% 160% $80 $90 $100 IRR Oil Price / Bbl $10 MM Well $15 MM Well Current Oil Price IRR Sensitivity to Capex and Pricing . Current well costs estimated between $
Slide 55: TMS Area Type Curve & Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Oil Price ($ / Bbl) $80.00 $90.00 $100.00 NPV-10 ($MM) $5.1 $7.4 $9.6 IRR 34% 49% 65% Payout (Years) 2.1 1.6 1.3 ROI 2.4x 2.8x 3.2x 600 MBoe EUR @ $10.0 MM Capex Oil Price ($ / Bbl) $80.00 $90.00 $100.00 NPV-10 ($MM) $10.6 $13.6 $16.5 IRR 73% 100%
Slide 56: Cotulla Asset
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 56 Cotulla Asset
Slide 57: Cotulla Map
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Map 57 HAUSSER ALEXANDER RANCH TALBUTT
Slide 58: Cotulla Acreage Breakdown
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Acreage Breakdown 58 Total Net Acres ~41,000 Average Working Interest 85% Average Net Revenue Interest 64% Planned Well Spacing (Acres) 40 Net Identified Drilling Locations 700+ 2014 Capital Plan ($MM) $140 – $160 Gross Full Year Rig Count
Slide 59: Alexander Ranch: Drilling & Completions Efficiency
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Alexander Ranch: Drilling & Completions Efficiency 59 11.0 9.0 7.0 7.0 0 2 4 6 8 10 12 Q2 2013 Q3 2013 Q4 2013 Q1 2014 Number of Days (Spud to TD) . 35% reduction in well costs from previous operator while using the same drilling rig - Cost reducti
Slide 60: Alexander Ranch Development
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Alexander Ranch Development 60 Hess Development Plan: 43 Total Wells SN Development Plan: 73 Total Wells . After acquiring Hess properties, SN’s analysis has resulted in tighter well spacing, higher ultimate recovery and more wells drilled at Alexa
Slide 61: Alexander Ranch: Well Cost Reductions
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Alexander Ranch: Well Cost Reductions . SN has achieved substantially lower than expected well costs in the Cotulla area - The previous operator was drilling wells at an average cost of ~$8.8 million - At the time of the acquisition, SN expected to
Slide 62: Cotulla La Salle (Alexander Ranch) Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla La Salle (Alexander Ranch) Economics 62 Cotulla (La Salle) Well Snapshot EUR (MBoe) 450 PV-10 ($MM) $4.0 - $4.5 IRR (%) 45% - 57% Gross Well Cost ($MM) $5.5 - $6.0 % Oil / Liquids 69% / 82%
Slide 63: Wycross Acre Development
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Wycross 40 Acre Development 63 LEF BUDA UEF Sting Ray Corvette Gran Torino
Slide 64: Wycross Harvest Development & Domal Appraisal
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Wycross Harvest Development & Domal Appraisal 64 . Recently completed (and continuing to develop) near domal appraisal drilling in the Lower Eagle Ford - Results proving economic viability of drilling the salt dome . Brought 5-well Lower Eagle Ford
Slide 65: Wycross: Drilling & Completions Efficiency
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Wycross: Drilling & Completions Efficiency 65 $6.2 $0.0 $1.0 $2.0 $3.0 $4.0 $5.0 $6.0 $7.0 $8.0 $9.0 $10.0 Previous Operator Total Cost - First Well Drilling Cost Savings Completion Cost Savings Other Cost Savings Total Cost - 2Q14 $MM $(0.6) $(2.1
Slide 66: Cotulla Wycross Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Cotulla Wycross Economics 66 Cotulla (Wycross) Well Snapshot EUR (MBoe) 500 PV-10 ($MM) $6.6 - $7.6 IRR (%) 72% - 109% Gross Well Cost ($MM) $6.0 - $7.0 % Oil / Liquids 82% / 90%
Slide 67: Hausser Ranch Potential Development
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Hausser Ranch Potential Development Virtex McLean-5 1,700 lbs/ft sand IP: 953 BOPD LEF BUDA UEF 67 Hausser 1H Pilot Kincaid Ranch Hausser Ranch
Slide 68: Marquis Asset
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Asset 68
Slide 69: Marquis Map
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Map 69 LEF BUDA UEF Prost Area Pilot
Slide 70: Marquis Fayette & Lavaca County Breakdown
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Fayette & Lavaca County Breakdown 70 Total Net Acres ~71,000 (1) Average Working Interest 100% Average Net Revenue Interest 75% Planned Well Spacing (Acres) 60 Net Identified Drilling Locations 900+ 2014 Capital Plan ($MM) $270 – $285 Gross
Slide 71: Marquis Project Cycle Example – 1Q12
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Project Cycle Example – 1Q12 71 1 Pilot; 1 LEF Devleopment Well 1Q12 Marquis Well Economics (450 MBoe EUR) Gross Well Cost ($MM) $15.0 IRR (%) Uneconomic PV-10 ($MM) Uneconomic
Slide 72: Marquis Project Cycle Example – 1Q13
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Project Cycle Example – 1Q13 72 3D Seismic; 2 Pilots; 6 LEF development wells 1Q13 Marquis Well Economics (450 MBoe EUR) Gross Well Cost ($MM) $12.0 IRR (%) 11% PV-10 ($MM) $0.2
Slide 73: Marquis Project Cycle Example – Projected YE14
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Project Cycle Example – Projected YE14 74 3D Seismic; 6 Pilots; 75-85 LEF development wells ; 4 UEF Appraisal wells; UEF & Buda Stacked pay potential development YE14 Marquis Well Economics (450 MBoe EUR) Gross Well Cost ($MM) $7.0 IRR (%)
Slide 74: Prost: Drilling & Completions Efficiency
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Prost: Drilling & Completions Efficiency 75 32.3 25.0 20.0 21.0 18.0 15.0 0 5 10 15 20 25 30 35 Q1 '13 Q2 '13 Q3 '13 Q4 '13 Q1 '14 Q2 '14 Number of Days (Spud to TD) . Technically challenging area of the Eagle Ford shale play; 3-string casing desig
Slide 75: Prost / Moulton LEF Field Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Prost / Moulton LEF Field Economics 77 • Well results include both Prost analog wells and offset operator results respective to Moulton acreage Prost / Moulton Well Snapshot EUR (MBoe) 450 PV-10 ($MM) $4.2 - $5.2 IRR (%) 38% - 53% Gross Well Cost (
Slide 76: Five Mile Creek: Future Development
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Five Mile Creek: Future Development 78 . Shallow decline production profile with prevalent natural fractures throughout the play . Successfully de-risked Lower Eagle Ford development in the play - Additional potential for Buda development . Recentl
Slide 77: Five Mile Creek: Drilling & Completions Efficiency
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Five Mile Creek: Drilling & Completions Efficiency 79 Recent Well Results and Forward Projections . Expectations for further cost reductions; similar to that of South Texas assets - 2-string casing design . Drilling cost reductions due to BHA and r
Slide 78: Marquis Five Mile Creek Field Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Marquis Five Mile Creek Field Economics 80 Five Mile Creek Well Snapshot EUR (MBoe) 350 PV-10 ($MM) $2.3 – $3.3 IRR (%) 26% - 40% Gross Well Cost ($MM) $6.0 - $7.0 % Oil / Liquids 80% / 92%
Slide 79: Offset Operator Results – Upper Eagle Ford
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Offset Operator Results – Upper Eagle Ford 81 LEF BUDA UEF 2014 SN UEF Tests Key UEF Production Prost Area Pilot PVA Welhuassen A2 (2013) 2,165 boepd ftp: 4500 psi PVA Fojtik 1 (2013) 1,209 boepd Cum: 84 mbo Sabine Targac 1 (2013) 1,034 boepd PVA M
Slide 80: Marquis Regional Eagle Ford Section
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 82 WEST EAST BUDA LEF UEF Marquis Regional Eagle Ford Section
Slide 81: Palmetto Asset
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Asset 83
Slide 82: Palmetto Map
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Map 84 LEF BUDA UEF
Slide 83: Palmetto Overview
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Acreage & Inventory Operational Update (1) Well Economics 2014 Capital Plan 85 Palmetto Overview Palmetto Area Acreage 1. Well status as of 8/6/14 Total Net Acres ~9,000 Average Working Interest 50% Average Net Revenue Interest 37% Planned Well Spa
Slide 84: Palmetto Down spacing Results
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Down spacing Results 86 40 Acre Development Results . Early results produced less than a 10% degradation in total EUR - Results in increased NPV per unit relative to 60 acre development 60 acre 40 acre 2015 Development Plan . 1 continuous
Slide 85: Palmetto Field Economics
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Palmetto Field Economics 87 Palmetto Well Snapshot EUR (MBoe) 450 –750 PV-10 ($MM) $4.2 – $13.3 IRR (%) 45% – 200% Gross Well Cost ($MM) $7.0 – 7.5 % Oil / Liquids 75% / 89%
Slide 86: Midstream & Marketing
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Midstream & Marketing 88
Slide 87: Delivery Options Snapshot
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 89 Delivery Options Snapshot 45°API 42°API 62°API 44°API South Texas has a long history of oil & gas with significant existing takeaway capacity - In addition to existing pipeline infrastructure, short-haul trucking is a viable economic alternative
Slide 88: Pro Forma Q2 Realized Price and Mix
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 62% 45% 71% 87% 85% 79% WTI $102.99 SN Company Catarina Cotulla Marquis Wycross Palmetto 37% 12% 27% 24% Oil Condensate NGL Gas 85% 7% 8% Oil Gas NGL Liquids Weighted Hydrocarbon Mix . Liquids constitute ~76% of production - ~37% is oil production
Slide 89: Oil Marketing
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Higher crude to condensate ratios derive greater value as measured to WTI benchmark Oil Marketing NE. Eagle Ford S. Eagle Ford . Marquis - API ~42° - Lease sales at LLS less ~$5.00-$7.00 . Palmetto - API ~42° - Lease sales at LLS less ~$4.00-$6.00
Slide 90: Condensate Marketing
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Condensate marketing focused on new markets - Catarina production marketed as processed condensate • 40,000 BOPD Processing Capability; 8 x 5000 Bbl distillation units; 2 CPF’s (Central Processing Facilities) . Recent US Department of Commerce ru
Slide 91: Condensate Strategy
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . SN believes that Catarina facilities can be “fit for export” - All wells at Catarina are permitted gas wells - Hydrocarbon at Catarina exists in the reservoir in a gaseous state. - At the surface wellhead the hydrocarbon goes through a high press
Slide 92: Gas Marketing
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 94 Gas Marketing . Gas connected to pipelines . ~98% liquids rich gas produced . Firm takeaway covers ~77% of forecasted long-term production, supplemented with interruptible contracts NE. Eagle Ford S. Eagle Ford . Five Mile Creek - DCP Midstream
Slide 93: NGL Marketing
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 95 NGL Marketing . NGLs currently processed and sold as products: - Average price for Q214 of $30.96 - Gas processing flexibility to trigger Ethane rejection operation - Average liquid content of ~6.5 GPM increases product component yields 56% 23%
Slide 94: Midstream Strategy
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Midstream Strategy 96 . Multiple markets are key to achieve best net-back . Evaluating projects that create new markets - Port Projects - Gas & Condensate Processing - Trucks & Pipelines . Control of Midstream allows SN to: - Avoid long term T&D Ag
Slide 95: Hedging Program and Hedge Summary
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation . Hedging program protects cash flow, development and capital spend - Hedging program targets ~50% of production over the next 12-18 months - ~30% of anticipated balance of 2014 production hedged at mid-point of guidance range - ~30% of anticipated
Slide 96: Financial Review
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Financial Review 98
Slide 97: Conservative Financial Strategy
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 99 Conservative Financial Strategy . Target 2.0x –2.5x leverage given volatility of commodity prices - Preserve financial flexibility and dry powder through undrawn revolver facility and cash . Continue to maintain a balanced capital structure - Ac
Slide 98: Capitalization
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Capitalization . Current liquidity of $811 million - $386 million in cash - $437.5 million borrowing base with an elected commitment of $425 million and $0 million drawn . No debt maturities until 2018 - Revolver currently 2018 - Senior notes 2021
Slide 99: Capitalization Summary
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 101 Capitalization Summary . Revolving credit facility (due 2018) - $437.5 MM borrowing base with an elected commitment of $425 million and an interest rate of LIBOR + 1.50% - 2.50% - Restrictive covenant: Net Debt < 4.0x TTM EBITDA . $600 MM of 7.
Slide 100: Share Count and Dilution
© 2014 Sanchez Energy Corporation 102 Share Count and Dilution . Basic shares outstanding of 58.4 million (as of 8/8/14) - Includes 2.6 million restricted shares which have not yet vested . Fully diluted shares outstanding of 71.0 million - Assumes conversion of both series of preferred stock which
Slide 101: Market Capitalization and Enterprise Value
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 103 Market Capitalization and Enterprise Value . Below calculations show detail behind Market Capitalization and Enterprise Value - Key considerations include correctly accounting for basic shares outstanding, preferred stock and face value of debt
Slide 102: Summary
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Summary 104
Slide 103: Analyst Day Highlights
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 105 Analyst Day Highlights . Deep inventory of high-return, low risk locations underpins growth - 2,800+ net drilling locations . 2015 production guidance midpoint ~55,000 boe/d . Low cost and efficient producer - Technically driven corporate cultu
Slide 104: Appendix
© 2014 Sanchez Energy Corporation INTERNAL USE ONLY Appendix 106
Slide 105: Summary Terms: Revolving Credit Facility
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Summary Terms: Revolving Credit Facility Borrower Sanchez Energy Corporation Guarantors All existing and future direct and indirect domestic subsidiaries except for designated unrestricted subsidiaries Facility $1.5 billion Senior Secured Revolving
Slide 106: Summary Terms: Convertible Preferred
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation Summary Terms: Convertible Preferred Principal . $94.3 million Dividend Rate . 4.875% Shares Outstanding . 1.886 million Key Features . Cumulative . Mandatorily Convertible (On or after October 5, 2017, subject to SN common stock trading at or abov
Slide 107: Non–GAAP Reconciliation and Measures
INTERNAL USE ONLY © 2014 Sanchez Energy Corporation 109 Non–GAAP Reconciliation and Measures Reconciliation of Net Income (Loss) To Adjusted EBITDA ($M) Reconciliation of PV-10 To Standardized Measure ($MM) The summary pro forma information with respect to the Company’s and the Catarina acquisition’